| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install new circuit for control panel Permit type: Electrical inspections | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-185082-000 | |||||
Raindrains for digester Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 3, 2010 | Permit id: 2010-139922-000 | |||||
Install circuit for control panel and low voltage control wiring for generator controls. Permit type: Electrical inspections | Permit status: Approved | Completion date: July 9, 2014 | Permit id: 2012-201622-000 | |||||
Replace 48 sq ft of ductwork and dampers in sludge processing building, structrual details attached Permit type: Intake | Permit status: Approved | Completion date: June 24, 2014 | Permit id: 2014-173317-000 | |||||
Push/pull 15-ton gas pack on dodd building Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-234168-000 | |||||
Replace vibration monitoring panel Permit type: Electrical inspections | Permit status: Approved | Completion date: October 14, 2015 | Permit id: 2015-246537-000 | |||||
480v 200a temporary service for dewatering @ sludge lagoon/ add 5 branch circuits and 1 additional inspection for underground conduit-conduit for future use and connect two new pumps 11/1/13 Permit type: Intake | Permit status: Closed | Completion date: April 18, 2012 | Permit id: 2012-131253-000 | |||||
Install a 200-amp temporary service and feed construction trailersfaxed Permit type: Electrical inspections | Permit status: Approved | Completion date: June 29, 2012 | Permit id: 2012-156342-000 | |||||
Rooftop pv solar installation Permit type: Application | Permit status: Approved | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Rooftop pv solar installation Permit type: Planning and zoning | Permit status: Approved | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Rooftop pv solar installation Permit type: Transportation | Permit status: Not reqd | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Install solar panels and inverters and dc wiringfaxed Permit type: Intake | Permit status: Closed | Completion date: April 30, 2013 | Permit id: 2013-145532-000 | |||||
Install flowmeter and gate valve. Faxed Permit type: Electrical inspections | Permit status: Approved | Completion date: October 14, 2015 | Permit id: 2014-210865-000 | |||||
Push pull 15-ton gas pack on dodd building Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-234168-000 | |||||
480v 200a temporary service for dewatering @ sludge lagoon add 5 branch circuits and 1 additional inspection for underground conduit-conduit for future use and connect two new pumps 11 1 13 Permit type: Intake | Permit status: Closed | Completion date: April 18, 2012 | Permit id: 2012-131253-000 | |||||
Rooftop pv solar installation Permit type: Application | Permit status: Approved | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Rooftop pv solar installation Permit type: Planning and zoning | Permit status: Approved | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Rooftop pv solar installation Permit type: Transportation | Permit status: Not reqd | Completion date: April 30, 2013 | Permit id: 2013-145313-000 | |||||
Ti convert existing lab building into an operation building. No change to foot-print - includes seismic upgrade to building Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: March 26, 2002 | Current use: Factory/industrial | Permit id: 2001-129492-000 | |||||
Build a shelter with eco roof over ped trail not for public use at this time Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: October 31, 2002 | Current use: Utility | Permit id: 2001-141535-000 | |||||
Build odor control facilities in an existing solids processing building (all stairs, ladders, hand and guardrails must be to osha standards) Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: December 17, 2002 | Current use: Utility | Permit id: 2001-152055-000 | |||||
Int. Installation of crane for (e) bes build. Wastewater treatment plant. Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 24, 2007 | Current use: Factory/industrial | Permit id: 2002-125261-000 | |||||
Construction of new pump controls building apx 28 sq ft and make modifications to existing pump station located west of new construction Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: June 27, 2006 | Current use: Utility | Permit id: 2002-147393-000 | |||||
2nd floor office remodel Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: August 11, 2004 | Current use: Business | Permit id: 2003-145869-000 | |||||
Columbia wastewater: expand industrial catwalk at solids processing building (slpr building). Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: March 15, 2006 | Current use: Factory/industrial | Permit id: 2003-115873-000 | |||||
Additon to influent pump station and control building; pipe and utility structure modifications wet weather capacity improvements see comments Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: January 24, 2007 | Current use: Utility | Permit id: 2004-005761-000 | |||||
Convert existing chorine gas system structure to hypo chlorite receiving building, build new loop pump building with pad for hypo chlorite storage tanks and replacing associated piping Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: April 18, 2007 | Current use: Utility | Permit id: 2004-053614-000 | |||||
19 sf engine building for co-generation facility (2nd electrical building under separate permit 07-114247-co) Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: December 9, 2008 | Current use: Utility | Permit id: 2007-114235-000 | |||||
945 sf electrical bldg for co-generation facility (separate engine building under separate permit 07-114235-co) Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: December 11, 2008 | Current use: Utility | Permit id: 2007-114247-000 | |||||
New modular office bldg to replace existing Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: June 6, 2008 | Current use: Business | Permit id: 2007-160961-000 | |||||
Install 2 ton lifting hoist for polymer in process area Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Utility | Permit id: 2008-107682-000 | |||||
Install exterior ladder of east side of building Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Utility | Permit id: 2008-190747-000 | |||||
Construction of two 2. 5 million gallon digesters and related 11,5 sf additional to the equipment building. Eco-roof is being installed Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: June 15, 2012 | Current use: Factory/industrial | Permit id: 2009-116091-000 | |||||
Replace sludge processing boiler stack Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: October 21, 2009 | Current use: Utility | Permit id: 2009-120712-000 | |||||
Upgrade old wet weather screening facility Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: March 27, 2013 | Current use: Utility | Permit id: 2009-124832-000 | |||||
Install light poles & brackets Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: April 19, 2011 | Current use: Utility | Permit id: 2009-175687-000 | |||||
Pallet storage rack Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Storage | Permit id: 2010-104500-000 | |||||
Demo existing walkway connecting three modular buildings and remove breezeway roof on structures Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: August 3, 2011 | Current use: Business | Permit id: 2011-153451-000 | |||||
New 1-story 10,925 sf office building and site improvements. Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: November 6, 2013 | Current use: Business | Permit id: 2011-184400-000 | |||||
Install mixer equipment in 4 existing digester tanks; replace existing roof over existing digester control building. Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: June 20, 2014 | Current use: Factory/industrial | Permit id: 2011-188548-000 | |||||
Replace platforms with new fall protection platforms on h25 tanks; add additional fall protection platforms to siloxane tanks Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: April 2, 2013 | Current use: Factory/industrial | Permit id: 2012-105728-000 | |||||
New return activated sludge tank and modification to the secondary process treatment system no mt this permit Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: April 8, 2014 | Current use: Factory/industrial | Permit id: 2012-109466-000 | |||||
Remove and replace (e) oil piping from the hydraulic system for valves at the grit removal basins; replace structural attachements for pipings Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: November 6, 2013 | Current use: Factory/industrial | Permit id: 2012-152030-000 | |||||
3 holes in pump room wall with pipes to 3 holes in digester #3 wall Permit type: Alteration | Permit status: Under inspection | Current use: Utility | Permit id: 2008-134051-000 | |||||
Demolition of existing modular building Permit type: Demolition | Permit status: Issued | Current use: Business | Permit id: 2009-108603-000 | |||||
New modular office to replace existing, modify and improve existing foundation Permit type: New construction | Permit status: Under inspection | Completion date: February 23, 2010 | Current use: Business | Permit id: 2009-108606-000 | |||||
Installation of adhesive anchors and replacement of removable handrails Permit type: Alteration | Permit status: Issued | Current use: Factory/industrial | Permit id: 2010-101416-000 | |||||
New pipe supports for a -inch grit pipe in the solids handling room of the headworks building. Permit type: Alteration | Permit status: Final | Completion date: July 30, 2010 | Current use: Factory/industrial | Permit id: 2010-120586-000 |