Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Multiple phase electrical installation as part of ddots reconstruction of south capitol street bridge relocation project. Work includes excavating and installing about 5 ft of underground 69kv transmission line. The project calls for connecting the conduits from south capitol street to p street sw to half street sw. Date: February 18, 2016 Contractor: Stantec Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600406 | |||||
SCORE 89 Multiple phase electrical installation as part of ddots reconstruction of south capitol street corridor project, work includes excavating and installing about 5 ft of underground 69kv transmission line. The project calls for connecting the conduit from south capitol street to p street sw to half street sw. Work covered under this application is pa10222564, pa105700-r4 Date: January 21, 2016 Contractor: Stantec Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600322 |