Connect one (1) interior wall sign to existing circuit Permit type: Intake | Permit status: Closed | Completion date: November 21, 2014 | Permit id: 2014-241211-000 | |||||
Add 25 workstations in sw corner of 5th floorpr# 04904685e Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2014-243688-000 | |||||
Add 25 workstations in sw corner of 5th floor Permit type: Intake | Permit status: Closed | Completion date: December 1, 2014 | Permit id: 2014-243690-000 | |||||
Security - 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec - security Permit type: Intake | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2014-251492-000 | |||||
Pbot limited pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: January 28, 2015 | Permit id: 2015-104554-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Received | Completion date: January 13, 2015 | Permit id: 2015-104554-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: January 28, 2015 | Permit id: 2015-104554-000 | |||||
Pbot limited pw permit Permit type: Pre-design pw | Permit status: Billed | Completion date: January 31, 2015 | Permit id: 2015-104554-000 | |||||
Pbot limited pw permit Permit type: Plan review pw | Permit status: Appr w/corr | Completion date: March 2, 2015 | Permit id: 2015-104554-000 | |||||
Pbot limited pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-104554-000 | |||||
Pwr - kpb upgrade elevators - pwr (no review fees) Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-152767-000 | |||||
5055 pull (4) cat 5e cables to two locations on 10th floorpr# 04904688e Permit type: Reviews | Permit status: Approved | Completion date: April 20, 2015 | Permit id: 2015-153191-000 | |||||
5055 pull (4) cat 5e cables to two locations on 10th floor Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153193-000 | |||||
Retrofit exterior canopy lightingpr # 049-05-459c Permit type: Reviews | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2015-179895-000 | |||||
Retrofit exterior canopy lighting Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179901-000 | |||||
Replace 2 existing roof drains Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-194482-000 | |||||
F2/ kpb upgrade elevators, replacement and modernization of buildings six elevators, machine room and related equipment. Permit type: Intake | Permit status: Closed | Completion date: March 14, 2013 | Permit id: 2013-127804-000 | |||||
Kpb upgrade elevators, replacement and modernization of buildings six elevators, machine room and related equipment. Pwr / fire alarmpr# 04904409m Permit type: Intake | Permit status: Closed | Completion date: March 30, 2013 | Permit id: 2013-134075-000 | |||||
Adding fire alarm devices to support elevator upgrades. Permit type: Intake | Permit status: Closed | Completion date: September 20, 2013 | Permit id: 2013-207987-000 | |||||
F10/ modify 16 it closets and add 1 new closet (basement thru 17th floors) all have new door, electrical & mechanical upgrades (mechanical to be under separte permit. Not reviewed under this permit) Permit type: Intake | Permit status: Closed | Completion date: November 18, 2013 | Permit id: 2013-229135-000 | |||||
F10/ upgrade exhaust fans & add 3 new vrf air cooled condenser units 1 in basement and 2 on the roof Permit type: Intake | Permit status: Closed | Completion date: November 18, 2013 | Permit id: 2013-229137-000 | |||||
F5/ third floor, restroom upgrade for ada design standards job not started- contractor waiting for kaiser to authorize. Dw 3-24-15 Permit type: Intake | Permit status: Closed | Completion date: December 10, 2013 | Permit id: 2013-236335-000 | |||||
Modify 16 it closets and add 1 new closet (basement thru 17th floors) all have new door; electrical upgrade (add tx & sub panel) Permit type: Intake | Permit status: Closed | Completion date: January 10, 2014 | Permit id: 2014-103569-000 | |||||
Install (2) 500amp feeders. Part of facility project # 13-127804-811-fa Permit type: Electrical inspections | Permit status: Approved | Completion date: March 10, 2015 | Permit id: 2014-109452-000 | |||||
B1/ one new rtu, distribution duct, controls Permit type: Intake | Permit status: Closed | Completion date: January 31, 2014 | Permit id: 2014-112152-000 | |||||
Pwr - one new rtu, distribution duct, controls - pwr Permit type: Intake | Permit status: Closed | Completion date: February 13, 2014 | Permit id: 2014-116849-000 | |||||
F17/ 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec, plbg, paint, finishes Permit type: Intake | Permit status: Closed | Completion date: April 2, 2014 | Permit id: 2014-133943-000 | |||||
B1/ 1st floor ti; area a&b, dfs-01 for metal panel ceiling seismic bracing Permit type: Intake | Permit status: Closed | Completion date: December 5, 2014 | Permit id: 2014-133943-Dfs | |||||
B2/ revision to wall locations, doors, casework, elec, plbg, paint, finishes Permit type: Intake | Permit status: Closed | Completion date: June 30, 2014 | Permit id: 2014-133943-Rev | |||||
F6/ revision to remove n entry doors, sidelites, add new vestibule and canopy, elec, design review complete Permit type: Intake | Permit status: Closed | Completion date: October 3, 2014 | Permit id: 2014-133943-Rev | |||||
F16/ remodel of existing dual duct hvac, zoning Permit type: Intake | Permit status: Closed | Completion date: April 2, 2014 | Permit id: 2014-133944-000 | |||||
Pwr - 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, new exterior doors and transom, floor covering, ceiling, elec - pwr Permit type: Intake | Permit status: Closed | Completion date: April 12, 2014 | Permit id: 2014-139915-000 | |||||
F4/ relocate credit union, 3rd floor to 2nd floor, demo some walls, add back for work areas, offices, teller areas, doors, relites, ceiling, elec, finishes contractor waiting for kaiser to authorize- do not expire. Dw 3/25/15 Permit type: Intake | Permit status: Closed | Completion date: May 8, 2014 | Permit id: 2014-154262-000 | |||||
Plumbing renovation at kaiser building 17th floorr/r expansion tank, change 2 feed to 4 feed Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156150-000 | |||||
1st floor- modifcation to fire alarm for t. I.- 19 devices total Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156196-000 | |||||
Plumbing renovation at kaiser building (kpb) 1st floordemo wc, lav, wh install 5wc, 8 lav, 2 uri, 2 df Permit type: Intake | Permit status: Closed | Completion date: May 21, 2014 | Permit id: 2014-159502-000 | |||||
Approval of design review to remodel the existing main building entry at the north faade. The storefront/entry doors will be brought to the back face of the columns and a new canopy will be added above the reconfigured entry. Within the new vestibule, doors will face north, east and west. The glazing will match existing glass and the storefront framing will be dark bronze to match the primary storefront framing for the entire building. The canopy will be faced with metal panels that will match other existing canopiesapproval per the approved plans, exhibits c-1 through c-4, signed and dated august 14, 2014, subject to the following three conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-16 Permit type: Land use review | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 2014-167687-000 | |||||
Re-cable entire building - voice/data and security Permit type: Reviews | Permit status: Approved | Completion date: June 19, 2014 | Permit id: 2014-171546-000 | |||||
Re-cable entire 16 floor building - voice/data and security Permit type: Intake | Permit status: Closed | Completion date: June 19, 2014 | Permit id: 2014-171547-000 | |||||
Add 1 smoke detector per phone room per floor for re-cable project.- 15 decivces total Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-195338-000 | |||||
1st floor- alterations to fire sprinklers as needed for t. I.- heads total Permit type: Intake | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-201354-000 | |||||
Controls - 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec - controls Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212171-000 | |||||
Voice/data/coax - floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec, - voice/data/coax Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212192-000 | |||||
Fire alarm wiring - 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec - fire alarm wiring Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212198-000 | |||||
Kaiser permanente bldg - occupancy relayspr# 04-904-925wireless lighting occupancy sensors & relays Permit type: Reviews | Permit status: Approved | Completion date: October 6, 2014 | Permit id: 2014-221842-000 | |||||
Pwr - install wireless lighting occupancy sensors and relays - pwr Permit type: Intake | Permit status: Closed | Completion date: October 6, 2014 | Permit id: 2014-221848-000 | |||||
Audio/video - 1st floor ti; area a&b, remove most interior walls, fixtures, cabinetry, doors, flooring, reconfigure for consultation, education rooms, remodel, lobby, reception, floor covering, ceiling, elec - audio/video Permit type: Intake | Permit status: Closed | Completion date: October 22, 2014 | Permit id: 2014-228939-000 | |||||
Investigate possible tree code violation Permit type: E - code compliance | Permit status: Violation found/correctio | Completion date: December 3, 2014 | Permit id: 2014-232314-000 | |||||
Investigate possible tree code violation Permit type: E - code compliance | Permit status: Correction completed | Completion date: April 2, 2015 | Permit id: 2014-232314-000 | |||||
Plumbing renovation at kaiser building 1st floordrinking fountain Permit type: Intake | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-207559-000 | |||||
Pwr - first floor - improvements to lobby, conf rooms, ed lounge and gym - pwr Permit type: Intake | Permit status: Closed | Completion date: August 1, 2015 | Permit id: 2015-210523-000 | |||||
Voice/data - first floor - improvements to lobby, conf rooms, ed lounge and gym - voice/data Permit type: Intake | Permit status: Closed | Completion date: August 1, 2015 | Permit id: 2015-210524-000 | |||||
Street tree root cutting permit Permit type: D - permit request | Permit status: Permit issued | Completion date: September 15, 2015 | Permit id: 2015-235974-000 | |||||
F21/1st floor/demo existing finishes,ceiling, hvac grill,light fixtures/create new door opening/new consultation room/partition wall/hvac/elec Permit type: Reviews | Permit status: Approved | Completion date: December 24, 2015 | Permit id: 2015-281673-000 | |||||
F21/1st floor/demo existing finishes,ceiling, hvac grill,light fixtures/create new door/consultation room/partition wall/hvac/elec Permit type: Intake | Permit status: Closed | Completion date: December 24, 2015 | Permit id: 2015-281676-000 | |||||
Pwr/v/data - 1st floor/demo existing finishes,ceiling, hvac grill,light fixtures/create new door/consultation room/partition wall/hvac/elec - pwr/v/data Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105993-000 | |||||
B1/add security gate at lower level of parking garage and doors to stairwells, structural cals included, elec Permit type: Reviews | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123484-000 | |||||
B1/revision for mounting detail to security gate at lower level of parking Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-123492-Rev | |||||
Pwr/controls - add security gate at lower level of parking garage and doors to stairwells, structural cals included, elec Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131472-000 | |||||
F21/ first floor - improvements to lobby, conf rooms, ed lounge and gym: add moveable furniture, casework, signage, lighting, projectors, art installation, plumbing, monitors, electrical and security Permit type: Reviews | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-197572-000 | |||||
Voice data - first floor - improvements to lobby, conf rooms, ed lounge and gym - voice data Permit type: Intake | Permit status: Closed | Completion date: August 1, 2015 | Permit id: 2015-210524-000 | |||||
F21 1st floor demo existing finishes,ceiling, hvac grill,light fixtures create new door opening new consultation room partition wall hvac elec Permit type: Reviews | Permit status: Approved | Completion date: December 24, 2015 | Permit id: 2015-281673-000 | |||||
F21 1st floor demo existing finishes,ceiling, hvac grill,light fixtures create new door consultation room partition wall hvac elec Permit type: Intake | Permit status: Closed | Completion date: December 24, 2015 | Permit id: 2015-281676-000 | |||||
Pwr v data - 1st floor demo existing finishes,ceiling, hvac grill,light fixtures create new door consultation room partition wall hvac elec - pwr v data Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105993-000 | |||||
B1 add security gate at lower level of parking garage and doors to stairwells, structural cals included, elec Permit type: Reviews | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123484-000 | |||||
B1 revision for mounting detail to security gate at lower level of parking Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-123492-Rev | |||||
Pwr controls - add security gate at lower level of parking garage and doors to stairwells, structural cals included, elec Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131472-000 | |||||
F2 kpb upgrade elevators, replacement and modernization of buildings six elevators, machine room and related equipment. Permit type: Intake | Permit status: Closed | Completion date: March 14, 2013 | Permit id: 2013-127804-000 | |||||
F21 first floor - improvements to lobby, conf rooms, ed lounge and gym: add moveable furniture, casework, signage, lighting, projectors, art installation, plumbing, monitors, electrical and security Permit type: Reviews | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-197572-000 |