Plumbing permit Date: December 23, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 380283 | |||||
Mechanical permit Date: January 27, 2012 Client: Mpd Management Co | Permit status: Completed | Permit id: 385306 | |||||
Electrical permit Date: November 14, 2008 Client Company: Albert Yedid | Permit status: Completed | Permit id: 188256 | |||||
Electrical permit Date: August 5, 2010 Permit status: Completed | Permit id: 294783 | |||||
Use permit Date: September 1, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 235083 | |||||
Electrical permit Date: August 7, 2007 Permit status: Completed | Permit id: 94622 | |||||
Electrical permit Date: October 15, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 242615 | |||||
Electrical permit Date: January 26, 2012 Client: Mpd Management Co | Permit status: Completed | Permit id: 385008 | |||||
Use permit Date: November 19, 2008 Client: Mpd Management Co | Permit status: Completed | Permit id: 168273 | |||||
Sign permit Date: November 2, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 244055 | |||||
Alteration permit Date: December 14, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 371152 | |||||
Alteration permit Date: September 28, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 235507 | |||||
Electrical permit Date: December 22, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 380075 | |||||
Mechanical permit Date: October 28, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 243677 | |||||
Zoning/use permit Date: October 20, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 243454 | |||||
Plumbing permit Date: November 6, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 246896 | |||||
Permit for preparing and serving of hot and cold food for take-out as part of an existing eat-in only restaurant on the first floor with a two (2) family dwelling above. Date: August 25, 2008 Client: Mpd Management Co | Applicant: Brett D. Feldman, Esquire | Permit type: Appeal | Permit status: Denied | Completion date: November 19, 2008 | Permit id: 6816 | |||||
Permit for an infill addition at the first floor level under existing roof line and for the erection of the two (2) internally illuminated flat walll signs and seven (7) awning signs. For use as a take out restaurant on the first floor in the same building with existing two (2) family dwelling above as previously approved. Size and location as shown on application/plan. Date: January 7, 2013 Client: Mpd Management Co | Applicant: Stephen G. Pollock, Esq. | Permit type: Appeal | Permit status: Denied | Permit id: 19636 | |||||
Electrical permit Date: January 26, 2012 Client: Mpd Management Co | Permit status: Completed | Permit id: 385008 | |||||
Plumbing permit Date: December 23, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 380283 | |||||
Alteration permit Date: September 28, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 235507 | |||||
Electrical permit Date: August 7, 2007 Permit status: Completed | Permit id: 94622 | |||||
Mechanical permit Date: January 27, 2012 Client: Mpd Management Co | Permit status: Completed | Permit id: 385306 | |||||
Use permit Date: November 19, 2008 Client: Mpd Management Co | Permit status: Completed | Permit id: 168273 | |||||
Sign permit Date: November 2, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 244055 | |||||
Electrical permit Date: November 23, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 242139 | |||||
Plumbing permit Date: November 6, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 246896 | |||||
Use permit Date: September 1, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 235083 | |||||
Zoning use permit Date: October 20, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 243454 | |||||
Alteration permit Date: December 14, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 371152 | |||||
Electrical permit Date: August 5, 2010 Permit status: Completed | Permit id: 294783 | |||||
Mechanical permit Date: October 28, 2009 Client: Mpd Management Co | Permit status: Completed | Permit id: 243677 | |||||
Electrical permit Date: December 22, 2011 Client: Mpd Management Co | Permit status: Completed | Permit id: 380075 | |||||
Electrical permit Date: November 14, 2008 Client: Yedid Brothers & Sons Llc | Client Company: Albert Yedid | Permit status: Completed | Permit id: 188256 | |||||
Permit for an infill addition at the first floor level under existing roof line and for the erection of the two (2) internally illuminated flat walll signs and seven (7) awning signs. For use as a take out restaurant on the first floor in the same building with existing two (2) family dwelling above as previously approved. Size and location as shown on application plan. Date: January 7, 2013 Client: Mpd Management Co | Applicant: Stephen G. Pollock, Esq. | Permit type: Appeal | Permit status: Denied | Permit id: 19636 | |||||
Permit for preparing and serving of hot and cold food for take-out as part of an existing eat-in only restaurant on the first floor with a two (2) family dwelling above. Date: August 25, 2008 Client: Mpd Management Co | Applicant: Brett D. Feldman, Esquire | Permit type: Appeal | Permit status: Denied | Completion date: November 19, 2008 | Permit id: 6816 | |||||
2nd floor vacant to 2-1bedroom apts also legalizing the subway on this applicatiomn Date: November 19, 2008 Client: Mpd Management Co | Permit type: Use permit | Permit status: Completed | Completion date: November 19, 2008 | Permit id: 168273 | |||||
SCORE 89 Install 44 light fixtures, 3 emergency lights, 3 exit signs, 3 switches, 41 receptacles, 1 exhaust fan, 1 water heater, 1 rtu, 1 time clock & 2 4 pole lighting contactors. Inspected by rich dean, united insp agency,11 20 2009 - passed Date: November 23, 2009 Contractor: Crystal Ball Contracting Inc Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: January 3, 2011 | Permit id: 242139 | |||||
SCORE 96 Installation of a low voltage 12vdc burglar alarm system as per 2005 nec. Date: October 15, 2009 Contractor: Adt Security Svcs Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: January 11, 2010 | Permit id: 242615 | |||||
SCORE 100 Hvac, including ductwork, as per plans. Date: October 28, 2009 Contractor: Accord Mechanical And Mgmt Svs Client: Mpd Management Co | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 30, 2009 | Permit id: 243677 | |||||
SCORE 88 Remove existing sign awnings and erect two (2) new channel letter, accessory flat wall signs (16"h x 78 1 8"w) as per plan. Date: November 2, 2009 Contractor: Philly Signs Client: Mpd Management Co | Permit type: Sign permit | Permit status: Completed | Completion date: November 30, 2009 | Permit id: 244055 | |||||
SCORE 99 2 fixtures Date: November 6, 2009 Contractor: John Joyce Client: Mpd Management Co | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 30, 2009 | Permit id: 246896 | |||||
SCORE 91 Install (4-6) category 5e plenum cables- longest run 40... In accordance with 2005 nec Date: October 29, 2009 Contractor: George White Jr Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: February 16, 2010 | Permit id: 244209 | |||||
SCORE 89 1 fire alarm control panel, 6 smoke detectors,3 horn strobes, 1 strobe, 2 pull station as per nfpa-72 (south dist) Date: December 2, 2009 Contractor: Crystal Ball Contracting Inc Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: June 30, 2010 | Permit id: 249068 | |||||
SCORE 89 Interior alterations include new sheetrock, flooring. Date: December 14, 2011 Contractor: Pinnacle Bldng And Construction Client: Mpd Management Co | Permit type: Alteration permit | Permit status: Completed | Completion date: March 9, 2012 | Permit id: 371152 | |||||
SCORE 100 2 wc, 2 lavs, 2ks, 2 showers, 2 water heaters (mixed use) Date: December 23, 2011 Contractor: Big Dawgs Plumbing And Heating Client: Mpd Management Co | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 8, 2012 | Permit id: 380283 | |||||
SCORE 100 Mixed use-install 2-100amp electrical svcs. Wire 2 apts as per 2008 nec (south district) Date: December 22, 2011 Contractor: Maxim Electrical Co Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: June 13, 2012 | Permit id: 380075 | |||||
SCORE 100 Mixed use-installation of house panel and service not listed on original permit (#380075) as per 2008 nec (south district) Date: January 26, 2012 Contractor: Maxim Electrical Co Client: Mpd Management Co | Permit type: Electrical permit | Permit status: Completed | Completion date: February 23, 2012 | Permit id: 385008 | |||||
SCORE 97 Install 2 goodman hvac units in 2 apartments (mixed use property) Date: January 27, 2012 Contractor: Alan Greenberg Client: Mpd Management Co | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 9, 2012 | Permit id: 385306 | |||||
SCORE 96 Installation of a low voltage (12 voc)burglar alarm system cust#08007853 (per 2008nec code) (south dist) Date: August 5, 2010 Contractor: Adt Security Svcs Permit type: Electrical permit | Permit status: Completed | Completion date: March 21, 2011 | Permit id: 294783 | |||||
SCORE 100 Shelter platform permit- erection of a sidewalk shelter platform as per engineered plans. Streets department permit is required for sidewalk closure prior to the start work. Date: August 29, 2017 Contractor: Superior Scaffold Services Inc Permit type: Alteration permit | Permit status: Active | Completion date: September 22, 2017 | Permit id: 812148 | |||||
SCORE 100 Repl existing 200a push on panel w new 200a bolton panel,42 cir, repl exist lts w (30)2x4 fxts. Repl existing track w new &12 heads. Hook up 1-hvac,h. W. Htr,wash dry,sign,bath gfi,w. Chair lift,7 hair stations, existing fa to remain but to be rein in s. Rock. Add 4 ph. Lines,add 3 ex 4 em packs,12 sws. Date: August 7, 2007 Contractor: Cobra Electric Permit type: Electrical permit | Permit status: Completed | Completion date: November 27, 2007 | Permit id: 94622 | |||||
SCORE 98 Change out 100a single meter socket to 200a 2-gang meter socket. Date: November 14, 2008 Contractor: Eastern Electric Client: Yedid Brothers & Sons Llc | Client Company: Albert Yedid | Permit type: Electrical permit | Permit status: Completed | Completion date: January 9, 2009 | Permit id: 188256 | |||||
SCORE 99 Repair secure loose bricks on front facade Date: August 11, 2017 Contractor: Mmb Contractors Permit type: Alteration permit | Permit status: Active | Completion date: August 22, 2017 | Permit id: 807683 |