Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Three story single brick townhouses to be relocated on site Date: March 24, 2014 Client: Mhf Dc Iv Llc | Permit type: Raze | Permit status: Permit issued | Permit id: R1400050 | |||||
SCORE 96 Electrical Date: September 9, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1408851 | |||||
SCORE 96 Electrical Date: October 16, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1500400 | |||||
SCORE 96 Electrical Date: August 21, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1408368 | |||||
SCORE 92 Plumbing and gas Date: October 30, 2014 Contractor: Daniel R. Rude Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1500831 | |||||
Plumbing and gas Date: September 29, 2014 Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1408949 | |||||
SCORE 96 Plumbing and gas Date: August 20, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1407947 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1403198 | |||||
SCORE 93 Mechanical Date: March 12, 2015 Contractor: Michael W. Karnes Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: M1501314 | |||||
SCORE 96 Electrical Date: August 5, 2015 Contractor: Ralph E. Jackson Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1508140 | |||||
SCORE 56 Erection of tower crane to construct 13 story homewood suites hotel Date: October 15, 2014 Client: Magna Hospitality Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1500001 | |||||
SCORE 96 Electrical Date: August 21, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1408368 | |||||
SCORE 96 Plumbing and gas Date: August 20, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1407947 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1403198 | |||||
SCORE 92 Plumbing and gas Date: October 30, 2014 Contractor: Daniel R. Rude Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1500831 | |||||
Plumbing and gas Date: September 29, 2014 Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1408949 | |||||
SCORE 56 Erection of tower crane to construct 13 story homewood suites hotel Date: October 15, 2014 Client: Magna Hospitality Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1500001 | |||||
Three story single brick townhouses to be relocated on site Date: March 24, 2014 Client: Mhf Dc Iv Llc | Permit type: Raze | Permit status: Permit issued | Permit id: R1400050 | |||||
Three story single brick townhouses to be relocated on site Date: March 24, 2014 Client: Mhf Dc Iv Llc | Permit type: Raze | Permit status: Permit issued | Permit id: R1400050 | |||||
SCORE 92 Plumbing and gas Date: October 30, 2014 Contractor: Daniel R. Rude Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1500831 | |||||
Plumbing and gas Date: September 29, 2014 Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1408949 | |||||
SCORE 96 Plumbing and gas Date: August 20, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1407947 | |||||
SCORE 72 Four geotechnical borings will be feet deep and 5 inches in diameter. The borings will be drilled using rotary drilling methods with hollow stem augers. The borings will be abandoned the same day of installation. Work plan is attached. Date: May 30, 2013 Contractor: Jessica Powell Specialized Engineering Client: Gary Hagelthorn Mhf Dc Iv Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300244 | |||||
SCORE 96 Installation of the internal and external bracing to stabilize the historic structure. Relocation of the structure in its entirety to a different location on the lot. Date: March 27, 2014 Contractor: Phillip Pitting Capitol Permits Client: Mhf Dc Iv Llc C O Gary Hagelthorn Abi Construction Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1403741 | |||||
SCORE 76 Partial road closure occurring during after hours in order to load 72 steel beams into the base of a townhouse. Date: May 30, 2014 Contractor: Mhf Dc Iv Llc Client: Mhf Dc Iv Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400490 | |||||
SCORE 99 An after hours permit is respectfully requested from 5am saturday thru 9pm sunday Date: November 20, 2014 Contractor: Christine Long Client: Crane Service Co | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500121 | |||||
SCORE 96 Construction consists of one hotel with 1 guestrooms. The access to the hotel is done via new york avenue. The fitness center, business center, food prep. Room, dining, hotel offices,and lobby are located on the ground floor. The hotel has 13 stories and a roof and mechanical equip. Will be located. Date: August 6, 2014 Contractor: Phillip Pitting Capitol Permits Client: Mhf Dc Iv Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1403264 | |||||
SCORE 96 Sheeting and shoring with related excavation. Date: April 30, 2014 Contractor: Phillip Pitting Capitol Permits Client: Mhf Dc Iv Llc C O Gary Hagelthorn Abi Construction Llc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400027 | |||||
SCORE 56 Erection of tower crane to construct 13 story homewood suites hotel Date: October 15, 2014 Client: Magna Hospitality Group | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1500001 | |||||
SCORE 96 Electrical Date: August 21, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1408368 | |||||
SCORE 96 Electrical Date: October 16, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1500400 | |||||
SCORE 96 Electrical Date: September 9, 2014 Contractor: Thomas P Mcguire Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1408851 | |||||
SCORE 96 Plumbing and gas Date: February 11, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1403198 | |||||
SCORE 96 Plumbing and gas Date: August 20, 2014 Contractor: Daniel M. Narh Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1407947 | |||||
Plumbing and gas Date: September 29, 2014 Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1408949 | |||||
SCORE 92 Plumbing and gas Date: October 30, 2014 Contractor: Daniel R. Rude Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: P1500831 | |||||
SCORE 56 Install one illuminated 16. 38 inch by 12 foot 6 inch blade sign and one set of 1 foot by 14 feet 5. 75 inch illuminated channel letters mounted to existing canopy. Date: May 29, 2015 Contractor: Geroge Marino; L K Deal Electrical Contractors Client: Mhf Dc Iv Llc | Permit type: Sign | Permit status: Completed | Permit id: Sg1500282 | |||||
SCORE 93 Revise sh1400027 to include additional tie-backs in place of rakers on the northern and western sides of the job site. Date: January 22, 2015 Contractor: Philip Pittinge Capitol Permits Client: Mhf Dc Iv Llc C O Gary Hagelthorn Abi Construction Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1409316 | |||||
SCORE 99 An after hours permit is respectfully requested from 5am saturday thru 9pm sunday Date: July 14, 2015 Contractor: Christine Long Client: Crane Service Co | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500582 | |||||
SCORE 56 Concrete finishing work only. Construction noise not to exceed 85 db Date: April 10, 2015 Contractor: Mhf Dc Lv Llc Client: Mhf Dc Lv Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500357 | |||||
SCORE 96 Electrical Date: August 5, 2015 Contractor: Ralph E. Jackson Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: E1508140 | |||||
SCORE 93 Mechanical Date: March 12, 2015 Contractor: Michael W. Karnes Client: Mhf Dc Iv Llc | Permit status: Permit issued | Permit id: M1501314 | |||||
SCORE 61 A hollow stem auger will install 5 temporary dewatering wells by advancing a 12 inch outer diameter 8 1/4 inch inner diameter bore hole to a depth of feet bgs. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 1/2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged to the accepted discharge location. Date: September 29, 2014 Contractor: Len Grecco Client: Magna Hospitality | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400463 | |||||
SCORE 76 1st extension to existing building permit b1403264 to expire 2/6/16. Date: September 18, 2015 Contractor: Mhf Dc Iv Llc Client: Mhf Dc Iv Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1512866 | |||||
SCORE 86 Type of elevator one (1) traction /steel/centrally/vertical transportation (15 floors). Date: October 8, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1503452 | |||||
SCORE 86 Type of elevator one (1) traction /steel/centrally/vertical transportation (p2 thru 13th floors). Date: October 8, 2015 Contractor: Mark A Dorsey Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1503453 | |||||
SCORE 56 2nd extension to existing permit b1403264 to expire 7/6/16. Date: January 22, 2016 Contractor: Mhf Dc Iv Lic Client: Mhf Dc Iv Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1603972 |