Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo/rebuild Permit type: Demolition or move p | Permit status: Finaled | Completion date: September 18, 2014 | Current use: Single family dwelling | Permit id: 661464 | |||||
Demo/rebuild - new 2 amp service Permit type: Electrical permit | Permit status: Finaled | Completion date: April 20, 2015 | Current use: Single family dwelling | Permit id: 683832 | |||||
Mechanical permit Permit status: Finaled | Completion date: April 20, 2015 | Current use: Single family dwelling | Permit id: 696354 | |||||
Rebuild Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 661459 | |||||
Heavy up Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 602290 | |||||
Install new gas service in accordance with washington gas plan no. 333234. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 316288 | |||||
Make pole a urd cable pole,install riser and cable to provide 200amp to a new home and associated equipment in accordance with pepco plan no. 3452011. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 319008 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. The replacement tree needs to be a species from our approved tree list which can be found at www. Montgomerycountymd. Gov/dot-highway/tree/index. Html. It needs to be from the major species list, 2 in caliper and planted between the months of october and may but after the project is complete. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (revised 8/21/14) Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 308371 |