Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Permit status: Finaled | Completion date: September 26, 2006 | Current use: Single family dwelling | Permit id: 418745 | |||||
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 418745 | |||||
Building residential permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 409805 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Replacegas service in accordance with washington gas plan no. 167742. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county < Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 291390 | |||||
Driveway & dumpster permit: construct the following type driveway in accordance with montgomery standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard mc301. 01dumspter permit:temporarily place a dumpster within the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters in the public right of way. Dumpster locations, barricades and/or lights are to be placed as directed by the dps inspector. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 244240 | |||||
Replacegas service in accordance with washington gas plan no. 641438. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354415 |