Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Category1: non structural alterations: interior work: 10 sq ft: update kitchenm baths frame outside wall of basement repair drywall. Demo non structural walls. No new partition walls. As per code. Expiration date: September 1, 2016 | Permit id: Com2016-04957 | |||||
Install gas furnace with 3 1/2 a/c system. Ductwork on 2 floors. As per coe. Gas and high voltage to be done by others. Expiration date: September 22, 2016 | Permit id: Com2016-07085 | |||||
Partial rehab new kitchen finished basement 150a service upgrade new bath rooms 2- 16 ckts 23 devices. Work done code. Expiration date: October 1, 2016 | Permit id: Com2016-08225 | |||||
Install plumbing fixtures; reconstruct waste and water; install required gas piping for 4 appliances (range 60k btu water heater 45k btu furnace 100k btu and dryer 60k btu) as per code. Expiration date: November 4, 2016 | Permit id: Com2016-11443 | |||||
Extend original permit.(original permit:com2016-04957:category1: non structural alterations: interior work: 10 sq ft: update kitchenm baths frame outside wall of basement repair drywall. Demo non structural walls. No new partition walls. As per code.)original permit description:(com2016-04957)category1: non structural alterations: interior work: 10 sq ft: update kitchenm baths frame outside wall of basement repair drywall. Demo non structural walls. No new partition walls. As per code. Expiration date: March 29, 2017 | Permit id: Com2016-24963 | |||||
Non-structural alterations/interior work 3 sq ft - insulation - basement r-13 - attic floor r-49. As per code. Expiration date: April 17, 2017 | Permit id: Com2016-26652 | |||||
Extend original permit.(original permit:com2016-08225:partial rehab new kitchen finished basement 150a service upgrade new bath rooms 2- 16 ckts 23 devices. Work done code. )original permit description:(com2016-08225)partial rehab new kitchen finished basement 150a service upgrade new bath rooms 2- 16 ckts 23 devices. Work done code. Expiration date: April 3, 2017 | Permit id: Com2016-25411 | |||||
Set and hookup fixtures 2 1 2 bath kit 9 fixtures as per code Expiration date: September 1, 2017 | Permit id: Com2017-04821 | |||||
Reinstatement(original permit:com2016-07085:install gas furnace with 3 1 2 a c system. Ductwork on 2 floors. As per coe. Gas and high voltage to be done by others. ) Expiration date: April 13, 2017 | Permit id: Com2017-05568 | |||||
Reinstatement(original permit:com2016-08225:partial rehab new kitchen finished basement 150a service upgrade new bath rooms 2- 16 ckts 23 devices. Work done code. ) Expiration date: May 27, 2017 | Permit id: Com2017-08778 | |||||
Install gas furnace with 3 1 2 a c system. Ductwork on 2 floors. As per coe. Gas and high voltage to be done by others. Expiration date: September 22, 2016 | Permit id: Com2016-07085 | |||||
Reinstate permit com2016-07085 issued on 03 22 16 for thirty (30) days for final inspection. (original permit:com2016-07085:install gas furnace with 3 1 2 a c system. Ductwork on 2 floors. As per coe. Gas and high voltage to be done by others. Expiration date: February 25, 2017 | Permit id: Com2017-01908 | |||||
Non-structural alterations interior work 3 sq ft - insulation - basement r-13 - attic floor r-49. As per code. Expiration date: April 17, 2017 | Permit id: Com2016-26652 |