Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
"construct a 41x3 wood access ramp w/3 level platforms. Footing will be 12"" diameter holes 30"" deep. Ramp and platforms support will be 4x4 post 6 o. C. W/double 2x6 headers at each post w/2x6 floor joist 16"" o. C. W/ 5/4""x6 fl. Plankeing with rails to b" Permit id: Com2012-07645 | |||||
Construct a 41x3 wood access ramp w/3 level platforms. Footing will be 12" diameter holes 30" deep. Ramp and platforms support will be 4x4 post 6 o. C. W/double 2x6 headers at each post w/2x6 floor joist 16" o. C. W/ 5/4"x6 fl. Plankeing with rails to be 2x4 rails connected with 2x2 pickets spaced 4" o. C. With 2x6 cap rail. Rail slope will be 1" to 12" (run). Work done to code and per sketch Expiration date: October 11, 2012 | Permit id: Com2012-07645 | |||||
Construct a 41x3 wood access ramp w 3 level platforms. Footing will be 12" diameter holes 30" deep. Ramp and platforms support will be 4x4 post 6 o. C. W double 2x6 headers at each post w 2x6 floor joist 16" o. C. W 5 4"x6 fl. Plankeing with rails to be 2x4 rails connected with 2x2 pickets spaced 4" o. C. With 2x6 cap rail. Rail slope will be 1" to 12" (run). Work done to code and per sketch Expiration date: October 11, 2012 | Permit id: Com2012-07645 |