Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 69 Temporary sign on posts placed as indicated on attached drawing to application in se corner of property Date: September 20, 2010 Contractor: Pratt, William Permit id: Mulcom20101690 | |||||
SCORE 99 Dig 7 test holes for rockton project Date: April 23, 2009 Contractor: At And T Permit id: Row20091409 | |||||
SCORE 99 Raise handhole, lower cable and remove a handhole Date: July 13, 2009 Contractor: At And T Permit id: Row20091776 | |||||
SCORE 64 4 by 4 ft freestanding wood sign Date: September 21, 2009 Contractor: Wesley Willows Client: Wesley Willows | Permit id: Mulcom20091636 | |||||
Temporary sign on posts placed as indicated on attached drawing to application in se corner of property Date: September 20, 2010 Permit id: Mulcom20101690 | |||||
SCORE 69 Temporary sign on posts placed as indicated on attached drawing to application in se corner of property Date: September 20, 2010 Contractor: Pratt William Permit id: Mulcom20101690 | |||||
SCORE 99 Raise handhole, lower cable and remove a handhole Date: July 13, 2009 Contractor: At And T Permit id: Row20091776 | |||||
SCORE 99 Dig 7 test holes for rockton project Date: April 23, 2009 Contractor: At And T Permit id: Row20091409 |