Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use lower level for woodworking shop 1st floor for class room teaching home improvement (for profit) hardware store to0l library Permit id: Use2010-04381 | |||||
Install gas fired boiler and tankless water heater to replace existing boiler and water heater (same location and size) as per code. Permit id: Com2011-01700 | |||||
Install 2 amps 1st floor and install 1 amp serivce 1st floor circuits as per code Permit id: Com2010-28948 | |||||
Install 1 amp service as per code. Expiration date: March 20, 2017 | Permit id: Com2016-24058 | |||||
Non-structural alterations interior work 3 sq ft - rework existing window on second floor. Remove rotted wood and replace. Frame interior walls. Frame for new 1st flr front windows. As per code. No mep on this permit. Expiration date: February 28, 2018 | Permit id: Com2017-13580 | |||||
100amp service as per code Expiration date: November 12, 2017 | Permit id: Com2017-09797 | |||||
Amend permit # com2016-24058 issued on 09 20 16 to add the following additional work 3 amp service as per code. Original permit description:(com2016-24058)install 1 amp service as per code. Expiration date: March 20, 2017 | Permit id: Com2016-29881 | |||||
Exterior work: remove old 2nd floor landing stairs and railing build new 2nd floor deck relocate stairs to land on ground in yard using pressure treated lumber deck size is 8. X 14 + - w tread 9" min rise 8 1 4" max width 36" as per sketch as per code Expiration date: February 14, 2018 | Permit id: Com2017-09243 |