Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Installation of a camera system for the crane booth. Permit type: Electrical inspections | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2015-114024-000 | |||||
Addition of interior foundation for machine Permit type: Application | Permit status: Approved | Completion date: March 11, 2015 | Permit id: 2015-132023-000 | |||||
Addition of interior foundation for dryer machine. Separate permit required for installation of mechanical equipment attached to foundation. This permit is for concrete foundation only. Permit type: Application | Permit status: Approved | Completion date: March 17, 2015 | Permit id: 2015-134704-000 | |||||
Addition of interior 104 x 27 foundation for plasma cutter. Permit type: Application | Permit status: Approved | Completion date: April 24, 2015 | Permit id: 2015-156793-000 | |||||
Infrared paint curing booth, self contained, structural details attached. Permit type: Intake | Permit status: Approved | Completion date: May 21, 2015 | Permit id: 2015-173904-000 | |||||
Field wire infrared oven. Permit type: Electrical inspections | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-178934-000 | |||||
Install (1) 100a and (1) 60a 480v circuits, and (4) 20a 120v circuits for two press brakes. Faxed Permit type: Electrical inspections | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2014-176942-000 | |||||
One 2 amp 4 volt feeder for new whitney punch Permit type: Electrical inspections | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-202050-000 | |||||
New gas furnace. 15 psi, 2 inch sch. Metalic gas piping on exterior of bldg. From meter to furnace. Max pressure inside bldg is 5 psi. Pressure test to minimum psi. Permit type: Intake | Permit status: Approved | Completion date: August 26, 2015 | Permit id: 2015-225642-000 | |||||
Addition of interior equipment foundation for acurpress Permit type: Application | Permit status: Approved | Completion date: September 8, 2015 | Permit id: 2015-232605-000 | |||||
Private hydrant - relocate (e) hydrant Permit type: Intake | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-257957-000 | |||||
Equipment slab/ foundation Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120402-000 | |||||
269 of 18 csp storm sewer in nw front ave. Contractor to prepare trench for bom to install 12 tap into manhole, contractor to install 12 pvc storm line from tap to property per rules of connection. Contractor to verify in field. Permit type: Intake | Permit status: Closed | Completion date: September 24, 2009 | Permit id: 2009-160185-000 | |||||
Equipment slab foundation Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120402-000 | |||||
Replace storm damaged roof in bay 1, @370 sf (guardrails must be constructed to osha standards.) bldg is known as bay one Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 16, 2005 | Current use: Factory/industrial | Permit id: 2004-005496-000 | |||||
Demo approx ft of half height partition walls and replace with new non-load bearing full size partition walls w windows to create two office rooms in main office area. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 30, 2004 | Current use: Business | Permit id: 2004-009516-000 | |||||
Build 225 sf covered pad for groundwater mediation equipment. See related work reviewed under exempt process in 04-010583-pj. Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: July 7, 2004 | Current use: Utility | Permit id: 2004-009882-000 | |||||
Rebuild storm drain with storm filter - revised main permit for storm drainage only Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Business | Permit id: 2004-035366-000 | |||||
New metal building, offices on second floor, bottom floor restrooms, lunchroom, showers, etc - 3 packages in submittal, engineered steel bldg and detail package separate from architectural and trade plans Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: June 2, 2006 | Current use: Business | Permit id: 2005-137335-000 | |||||
Remove sliding door. Modify opening and install new coiling door. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 21, 2008 | Current use: Business | Permit id: 2008-113703-000 | |||||
Parking lot upgrades for landscaping, storm water management and landscape screening required for zoning non-conforming upgrades. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 10, 2010 | Current use: Factory/industrial | Permit id: 2008-125133-000 | |||||
Remove (e) asphalt floor and replace w 6" conc slab floor Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Under inspection | Current use: Factory/industrial | Permit id: 2008-138492-000 | |||||
New fuel tank cover with habitat roof Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: April 19, 2011 | Current use: Hazardous | Permit id: 2010-163846-000 | |||||
New canopy with habitat roof for temporary storage of waste materials Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: January 27, 2012 | Current use: Hazardous | Permit id: 2011-154483-000 | |||||
New 25 ft x 63 ft slab for equipment within existing building Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 17, 2013 | Current use: Factory/industrial | Permit id: 2012-201043-000 | |||||
Remove metal roof on existing canopy behind admin building in front of maintenance shop, add additional purlins and new metal roof. Build new 22 x 28 canopy on west side of existing canopy. Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: June 27, 2013 | Current use: Factory/industrial | Permit id: 2012-154814-000 | |||||
Demo qa building on large industrial lot Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: November 22, 2013 | Current use: Factory/industrial | Permit id: 2013-217916-000 | |||||
Add 25 x 75 foundation for new robotic equipment Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: August 21, 2013 | Current use: Factory/industrial | Permit id: 2013-184984-000 | |||||
New jib crane foundation in building Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 13, 2013 | Current use: Factory/industrial | Permit id: 2013-176697-000 | |||||
New concrete slab for equipment relocation Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 29, 2014 | Current use: Factory/industrial | Permit id: 2013-208897-000 | |||||
New footing for relocation of air receiver tank Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 6, 2014 | Current use: Factory/industrial | Permit id: 2014-133698-000 | |||||
Sawcut and remove existing concrete fl; excavate as needed for footing; new concrete footing for new robot; interior installation Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Under inspection | Current use: Factory/industrial | Permit id: 2016-275377-000 | |||||
Repair wood dock structure for existing petroleum piping. Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Factory/industrial | Permit id: 2001-168334-000 | |||||
Add partition walls in 1st floor office and change access door location Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Business | Permit id: 2003-143876-000 | |||||
Demo 50 sf 2 story, existing office bldg Permit type: Demolition | Permit status: Final | Completion date: May 18, 2006 | Current use: Business | Permit id: 2005-171214-000 | |||||
Add partition wall, to create passage way Permit type: Alteration | Permit status: Final | Completion date: October 3, 2006 | Current use: Business | Permit id: 2006-158625-000 | |||||
Addition of new ceiling to existing structure for better air flow Permit type: Alteration | Permit status: Final | Completion date: July 31, 2008 | Current use: Factory/industrial | Permit id: 2008-105483-000 | |||||
Craneway #4 - remove existing overhead door, modify opening & install new door Permit type: Alteration | Permit status: Final | Completion date: October 4, 2010 | Current use: Factory/industrial | Permit id: 2010-114758-000 | |||||
Demolition of rigging loft building, 25x75 Permit type: Demolition | Permit status: Final | Completion date: January 30, 2013 | Current use: Storage | Permit id: 2012-216803-000 |