Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Water heater replacement Permit id: Plm2014-01170 | |||||
Relocate service mast asper code. Permit id: Com2010-16950 | |||||
Replace water service line with 3/4 copper pipe as per code. Permit id: Com2010-14966 | |||||
Install 7 new plumbing fixtures reconstruct water and waste install 3 gas fixtures all work per code Permit id: Com2010-12077 | |||||
Interior work - install new 90% gas furnace & ac with duct work as per code. Gas provided by others original permit description:(com2010-11394)interior work - install new 90% gas furnace & ac with duct work as per code. Gas provided by others Permit id: Com2010-11394 | |||||
Wiring of basement 1st floor and 2nd floor (total of circuits) as per code. Permit id: Com2010-09453 | |||||
Non-structural alterations; interior work: 225 sq. Ft.; exterior work: 1 100. 00; drywall basement; replace kitchen cabinets paint walls; new top flooring throughout; replace 4 windows (same size and location); all work will be done as per code. Permit id: Com2010-08369 | |||||
Replace water service line with 3 4 copper pipe as per code. Expiration date: January 12, 2011 | Permit id: Com2010-14966 |