Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 05-03-084 | Parcel: 072043017000 | |||||
Permit id: 10-07-059 | Parcel: 072043015000 | |||||
Permit id: 13-09-067 | Parcel: 072043015000 | |||||
Install 1" water meter; new sfd, bridgeway lakes 1 phase 3. Temporary water paid for six months from issuance date. Permit id: 05-0412 | |||||
Move the pad footing so they maintain a setbak distance of 4 feet behind the bulkhead, deck poles along lake wall are to be cut flush with the surface. Footins are to be reloicated. Footings are to be relocated 4 feet from the bulkhead. The surface under the deck is to be lined with landscape fabric and cover with crushed rock. The rock is to be clean (no sand or gravel). Preconstruction inspection required. Construct 279 sf deck Permit id: 10-0255 | Parcel: 072043015000 |