Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 04-03-059 | Parcel: 001010001000 | |||||
Permit id: 05-05-154 | Parcel: 072032120 | |||||
SCORE 89 Install 1" water meter; new sfd, bridgeway lakes 1 phase 2. Temporary water paid for six months from issuance date. Permit id: 04-0263 | |||||
Swimming pool:all work shall comply with city standards. An engineering pre-inspection is required! Call 916-617-4692 final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to deposit refund. Permit id: 05-0831 | Parcel: 072032120 |