Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Fasten ccu/repeater antenna to the top of the building structure using cable pipe and conduit that runs from the breaker box up to the roof top (for optimum performance) as per plans and as per code. If installing suppression system in equipment cabinet then a separate permit will be required. Expiration date: February 25, 2015 | Permit id: Com2014-16609 | |||||
Fasten ccu repeater antenna to the top of the building structure using cable pipe and conduit that runs from the breaker box up to the roof top (for optimum performance) as per plans and as per code. If installing suppression system in equipment cabinet then a separate permit will be required. Expiration date: February 25, 2015 | Permit id: Com2014-16609 | |||||
Provide fire alarm system to new modular building. System will be tied into existing system within school. Following is a list of devices to be installed (2) facp (15) smoke detectors (3) pull stations (3) pull station covers (13) horn strobes and (5) strobes as per code. Expiration date: January 28, 2009 | Permit id: Com2008-17971 | |||||
(50) data outlets (10) voice outlets as per code Expiration date: February 19, 2009 | Permit id: Com2008-22640 |