| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior work to install (50) data drops as per code. Permit id: Com2010-05012 | |||||
Permit id: Com2010-03233 | |||||
Amend permit com2009-06472 issued on 06/24/09 with plans #2009-336 to add plumber gas fitter and hvac contractor as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. Permit id: Com2009-23165 | |||||
Install fire alarm system as per plans as per code. Permit id: Com2009-20683 | |||||
"to add (220) sprinklers. Largest size pipe is 4"" as per plans and as per code." Permit id: Com2009-15188 | |||||
Amend permit #com2009-06472 issued on 6/24/09 with plans #2009-336 to add contractors as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditori Permit id: Com2009-16574 | |||||
Amend permit com2009-03081 issued on 06/19/09 with plans #2009-163 to add plumbing contractor as listed above. Original permit description:(com2009-03081)site work for future addition to the school building as per plans as per code. Separate permit requi Permit id: Com2009-15727 | |||||
Classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom facul Permit id: Com2009-06472 | |||||
Site work for future addition to the school building as per plans as per code. Separate permit required for building addition /alterations. Permit id: Com2009-03081 | |||||
Amendpermit#com2008-11626 issued on 7-9-08 with plans#2008-5 to add contractors aslisted above. Original permit description:(com2008-11626)addition to house an elevator 9 machine room to provide accessibility to all levels of the school as per plans as p Permit id: Com2008-29311 | |||||
Addition to house an elevator 9 machine room to provide accessibility to all levels of the school as per plans as per code. Permit id: Com2008-11626 | |||||
Provide power for electric gate opener- erdman ave entrance. Install site lighting - sinclair lane - side relocate power for trash compactor as per code. Permit id: Com2008-17380 | |||||
Complete wet pipe sprinkler system based on 13r. Bldg 32 as per code. Permit id: Com2008-09789 | |||||
Grading and paving for additional off-street parking spaces and private road as per plans as per code. Permit id: Com2007-34210 | |||||
Multi-dwelling residential unit designed per code as per the construction plans. Includes mechanical electrical and plumbing. Seperate permit will req. For sprinkler pipe. On each app. Work as per plans and code. Permit id: Com2007-32298 | |||||
Fire alarm devices for athletic wiring renovation. (plans#1614-04 completed may 2005 permit#55542 Permit id: Com2005-13047 | |||||
New fire alarm system Permit id: Com2004-32080 | |||||
Renovations of existing building include new interior walls doors and frames floor finishes ceilings casework windows cutting and patching exterior wall openings structural reinforcing mechanical and electrical systems as per plans. Separate permi Permit id: Com2004-24342 | |||||
Amend permit com2009-03081 issued on 06/19/09 with plans #2009-163 to add plumbing contractor as listed above. Original permit description:(com2009-03081)site work for future addition to the school building as per plans as per code. Separate permit required for building addition /alterations. Expiration date: June 19, 2010 | Permit id: Com2009-15727 | |||||
Classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance/exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-06472 | |||||
To add (220) sprinklers. Largest size pipe is 4" as per plans and as per code. Expiration date: February 10, 2010 | Permit id: Com2009-15188 | |||||
Amendpermit#com2008-11626 issued on 7-9-08 with plans#2008-5 to add contractors aslisted above. Original permit description:(com2008-11626)addition to house an elevator 9 machine room to provide accessibility to all levels of the school as per plans as per code. Expiration date: July 9, 2009 | Permit id: Com2008-29311 | |||||
Amend permit com2009-06472 issued on 06/24/09 with plans #2009-336 to add plumber gas fitter and hvac contractor as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance/exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-23165 | |||||
Amend permit #com2009-06472 issued on 6/24/09 with plans #2009-336 to add contractors as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance/exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-16574 | |||||
Renovations of existing building include new interior walls doors and frames floor finishes ceilings casework windows cutting and patching exterior wall openings structural reinforcing mechanical and electrical systems as per plans. Separate permits required for all exterior work. Expiration date: May 11, 2006 | Permit id: Com2004-24342 | |||||
Installation of a synthetic athletic field as per plans as per code. Expiration date: January 15, 2017 | Permit id: Com2015-16004 | |||||
Site work for future addition to the school building as per plans as per code. Separate permit required for building addition alterations. Expiration date: June 19, 2010 | Permit id: Com2009-03081 | |||||
Classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-06472 | |||||
Amend permit #com2009-06472 issued on 6 24 09 with plans #2009-336 to add contractors as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-16574 | |||||
Amend permit com2009-06472 issued on 06 24 09 with plans #2009-336 to add plumber gas fitter and hvac contractor as listed above. Original permit description:(com2009-06472)classroom addition to auditorium. Fire suppression for auditorium and addition. New hvac system for auditorium. Replace ceiling in auditorium for fire suppression and ductwork. Addition includes art vocal music and instrumental music classroom faculty offices support rooms and a partial lower level for student yearbook newspaper and t. V. Station. Renovate exist. Lobby to provide entrance exit to addition as per plan as per code. Separate permit will be required for sprinkler system. Expiration date: June 24, 2011 | Permit id: Com2009-23165 | |||||
Amend permit com2009-03081 issued on 06 19 09 with plans #2009-163 to add plumbing contractor as listed above. Original permit description:(com2009-03081)site work for future addition to the school building as per plans as per code. Separate permit required for building addition alterations. Expiration date: June 19, 2010 | Permit id: Com2009-15727 |