Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Water service replacement. Shut off water to building at water meter. Excavate sidewalk for access of line. Replace water service with "l" copper pipe pressure reducing valve back flow preventers and fittings. Connect to water meter turn on water supply and check for any leaks as per code dot permit required Expiration date: May 15, 2017 | Permit id: Com2016-29171 |