| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(use) use premises as a flower shop office a nd 2 dwelling units: 1st floor and basement-flower shop 2nd floor front-office 2nd floor rear- 1 dwelling unit 3rd floor-1 dwelling unit per bmza 2014-378 approved 10/15/2013. Permit id: Use2014-03456 | |||||
"replacing existing water service 1 1/2"" pipe on private property. Backflow to be installed by another plumber " Permit id: Com2014-17204 | |||||
Install a 13-d wet pipe sprinkler system as per plans and as per code. Permit id: Com2014-09309 | |||||
Amend permit# com2013-24732 issued on 02/06/14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 Permit id: Com2014-07285 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in Permit id: Com2014-05489 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace Permit id: Com2013-24732 | |||||
Continue to use as a florist shop - change of ownership Permit id: Use2013-03025 | |||||
Exterior work - non-structural alterations - chemical clean & repoint exterior brick as per code. Permit id: Com2013-16646 | |||||
Interior demolition/category 1/non-structural alterations/interior work 1 4 - removal of trash and debris. Removal of old flooring and sheetrock non-structural as per code. (demo only)separate permit will be pulled for tenant fit-out Permit id: Com2013-16132 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2013-24732 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2014-05489 | |||||
Amend permit# com2013-24732 issued on 02/06/14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10/1/2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2014-07285 | |||||
Replacing existing water service 1 1/2" pipe on private property. Backflow to be installed by another plumber Expiration date: February 14, 2015 | Permit id: Com2014-17204 | |||||
Interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4/21/2015) as per plans and as per code. Expiration date: February 2, 2017 | Permit id: Com2015-15538 | |||||
Original permit description:(com2015-15538)interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4/21/2015) as per plans and as per code. Expiration date: February 2, 2017 | Permit id: Com2016-04978 | |||||
Install wet chemical fire system in exhaust hood as per code Expiration date: April 14, 2017 | Permit id: Com2016-26420 | |||||
Installation of security system Expiration date: March 13, 2017 | Permit id: Com2016-50195 | |||||
Replacing existing water service 1 1 2" pipe on private property. Backflow to be installed by another plumber Expiration date: February 14, 2015 | Permit id: Com2014-17204 | |||||
Interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4 21 2015) as per plans and as per code. Expiration date: February 2, 2017 | Permit id: Com2015-15538 | |||||
(use) use premises as a flower shop office a nd 2 dwelling units: 1st floor and basement-flower shop 2nd floor front-office 2nd floor rear- 1 dwelling unit 3rd floor-1 dwelling unit per bmza 2014-378 approved 10 15 2013. Permit id: Use2014-03456 | |||||
Use portion of premises 1st floor as a restaurant( with liquor license) not including live entertainment and with accessory outdoor seating 3 tables not more than 12 patrons per bmza 2015-54 approved 4 21 15 Permit id: Use2016-02283 | |||||
Original permit description:(com2015-15538)interior fit-out of existing tenant space (into a restaurant per bmza2015-54 approved 4 21 2015) as per plans and as per code. Expiration date: February 2, 2017 | Permit id: Com2016-04978 | |||||
Original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2014-05489 | |||||
Interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2013-24732 | |||||
Amend permit# com2013-24732 issued on 02 06 14 with plans# 2013-2073 to add electrical contractor as listed above original permit description:(com2013-24732) interior fit-out of two apartments and two commercial spaces per bmza2013-378 approved 10 1 2013 (including interior non-loadbearing partitions 1-hr tenant separation 2-hr egress corridor. Replace stairs in same location with same openings. Replace exterior windows and doors. Existing 1st floor commercial space not included) as per plans and as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: February 6, 2015 | Permit id: Com2014-07285 | |||||
Interior demolition category 1 non-structural alterations interior work 1 4 - removal of trash and debris. Removal of old flooring and sheetrock non-structural as per code. (demo only)separate permit will be pulled for tenant fit-out Expiration date: February 5, 2014 | Permit id: Com2013-16132 |