Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: September 2, 2015 Client: Drexel University | Permit status: Completed | Permit id: 615859 | |||||
Zoning permit Date: June 16, 2014 Client: Drexel University | Permit status: Completed | Permit id: 543173 | |||||
Demolition permit Date: December 15, 2014 Client: Drexel University | Permit status: Completed | Permit id: 577152 | |||||
Electrical permit Date: January 7, 2016 Client: Drexel University | Permit status: Completed | Permit id: 654092 | |||||
Zoning/use permit Date: June 16, 2014 Client: Drexel University | Permit status: Completed | Permit id: 543246 | |||||
Plumbing permit Date: November 24, 2014 Client: Drexel University | Permit status: Completed | Permit id: 576119 | |||||
Permit for the erection of a detached structure (booth) and for the creation of a non-accessory, surface, public parking lot with a total of one-hundred and three (103) parking spaces including five (5) accessible spaces (minimum of one (1) van accessible space), and twenty-two (22) compact spaces. The lot will also include five (5) reservoir spaces and ten (10) bicycle parking spaces. Size and location as shown on plans/application. Date: July 28, 2015 Client: Drexel University | Applicant: Neil Sklaroff | Permit type: Appeal | Permit status: Granted/prov | Completion date: September 1, 2015 | Permit id: 25730 | |||||
Zoning use permit Date: June 16, 2014 Client: Drexel University | Permit status: Completed | Permit id: 543246 | |||||
Zoning permit Date: June 16, 2014 Client: Drexel University | Permit status: Completed | Permit id: 543173 | |||||
Plumbing permit Date: November 24, 2014 Client: Drexel University | Permit status: Completed | Permit id: 576119 | |||||
Demolition permit Date: December 15, 2014 Client: Drexel University | Permit status: Completed | Permit id: 577152 | |||||
Zoning use permit Date: September 2, 2015 Client: Drexel University | Permit status: Completed | Permit id: 615859 | |||||
Electrical permit Date: January 7, 2016 Client: Drexel University | Permit status: Completed | Permit id: 654092 | |||||
Permit for the erection of a detached structure (booth) and for the creation of a non-accessory, surface, public parking lot with a total of one-hundred and three (103) parking spaces including five (5) accessible spaces (minimum of one (1) van accessible space), and twenty-two (22) compact spaces. The lot will also include five (5) reservoir spaces and ten (10) bicycle parking spaces. Size and location as shown on plans application. Date: July 28, 2015 Client: Drexel University | Applicant: Neil Sklaroff | Permit type: Appeal | Permit status: Granted/prov | Completion date: September 1, 2015 | Permit id: 25730 | |||||
For the lot adjustment to create six (6) lots (lots 1-6) from two-hundred eighty-eight (288) deeded lots and two (2) opa accounts (3601 filbert st & 11-38 n 38th st). Size and location as shown on application plans. Date: June 16, 2014 Client: Rexel University | Permit type: Zoning permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 543173 | |||||
SCORE 100 Sealing (3)8" sewer laterals pa20143251395 (vacant lot)"self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: November 24, 2014 Contractor: Mr Ds Plumbing And Heating Client: Rexel University | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 576119 | |||||
For the complete demoltion of all exisitng structures. For use as a vacant lot. Date: June 16, 2014 Client: Rexel University | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 543246 | |||||
SCORE 100 For the complete demolition of one -two (2) story detached structure and one- three (3) story detached structure for use as an education facility. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with code bulletin b-1302. Sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. All asbestos to be treated & removed prior to commencement of work. All pedestrian protection measures and street closure permits are required to be in place prior to starting work. Any deviation will require an amended building permit. Date: December 15, 2014 Contractor: Geppert Bros. Inc Client: Rexel University | Permit type: Demolition permit | Permit status: Completed | Completion date: January 19, 2016 | Permit id: 577152 | |||||
SCORE 100 Install new 200amp service & 24 pole mounted lights, provide power for parking revenue equipment as per 2008 (west district) Date: January 7, 2016 Contractor: Paramount Electrical Service L Client: Rexel University | Permit type: Electrical permit | Permit status: Completed | Completion date: March 8, 2016 | Permit id: 654092 | |||||
For the erection of a detached structure (booth). Size and location as shown on plans application. For the creation of a non-accessory, surface, public parking lot with a total of one-hundred and three (103) parking spaces including five (5) accessible spaces (minimum of one (1) van accessible space), and twenty-two (22) compact spaces. The lot will also include five (5) reservoir spaces and ten (10) bicycle parking spaces. Size and location as shown on plans application. No signs on this application, Date: September 2, 2015 Client: Rexel University | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 18, 2015 | Permit id: 615859 |