Suppression permit Date: November 6, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 436443 | |||||
Alteration permit Date: April 11, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 395413 | |||||
Suppression permit Date: December 12, 2011 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 378194 | |||||
Suppression permit Date: September 21, 2010 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 302251 | |||||
Alteration permit Date: August 5, 2016 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Active | Permit id: 703721 | |||||
Plumbing permit Date: December 19, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 443396 | |||||
Suppression permit Date: April 9, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 398005 | |||||
Alteration permit Date: August 5, 2016 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 703721 | |||||
Alteration permit Date: October 17, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 429159 | |||||
Suppression permit Date: December 12, 2011 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 378194 | |||||
Plumbing permit Date: December 19, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 443396 | |||||
Suppression permit Date: September 21, 2010 Client: Brotech Corp | Client Company: Purolite Company | Permit status: Completed | Permit id: 302251 | |||||
SCORE 100 For sprinkler system, replace in kind 2 pieces of leaking galvanized pipe, replaced in kind 4 grooved couplings, 1 grooved elbow, 5 hangers Date: September 21, 2010 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: May 25, 2011 | Permit id: 302251 | |||||
For the reconstruction of roof assembly for an existing exterior discharge pump equipment pad serving adjacent sump pit for spill control & secondary hazardous material containment system, as previously permitted. All permitted work to be performed by a city of philadelphia licensed contractor in accordance with title 9 of the philadelphia code. Date: October 17, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit type: Alteration permit | Permit status: Completed | Completion date: November 30, 2012 | Permit id: 429159 | |||||
SCORE 100 Replace 4 existing pressure switches on warehouse dry systems, replace 2 tamper switches in fire pump room, replace 1 - 4" butterfly valve and 1 - 6" butterfly valve. System must be put back in service by the end of the working day. All work is on existing system with like in kinf. Call inspector for an initial inspection prior to the start of work. Date: November 6, 2012 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: September 19, 2013 | Permit id: 436443 | |||||
SCORE 100 Installation of a new back flow preventer Date: December 19, 2012 Contractor: Ed Scannapieco Plumbing Inc Client: Brotech Corp | Client Company: Purolite Company | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 1, 2014 | Permit id: 443396 | |||||
SCORE 100 Installation of one (1) 10,0 gallon aboveground storage tank, used to store oleum which will be installed inside of the building and alterations to containment area as per approved plans. This tank is subject to padep registration and storage tank regulations, and will be installed in accordance with those regulations. Date: August 5, 2016 Contractor: Tti Environmental Inc Client: Brotech Corp | Client Company: Purolite Company | Permit type: Alteration permit | Permit status: Completed | Completion date: January 31, 2017 | Permit id: 703721 | |||||
SCORE 86 For the complete demolition of a one-story structure as per plan. A covered walkway or sidewalk closure may be required within 5 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits may be required. Any deviation will require an amended building permit. Date: March 21, 2017 Contractor: Nv Group Incorporated Client: Brotech Corp | Client Company: Purolite Company | Permit type: Demolition permit | Permit status: Revoked | Completion date: April 21, 2017 | Permit id: 759881 | |||||
SCORE 100 Relocate 3 pendents in 2nd fl offices. Relocate 3 horizontal sidewalls in mechanical room. Relocate 2 horizontal sidewalls in 1st floor office breakroom Date: April 9, 2012 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: January 4, 2013 | Permit id: 398005 | |||||
SCORE 100 Permit for replacement of 21 feet schedule piping as a result of leakage. Date: December 12, 2011 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: January 11, 2012 | Permit id: 378194 | |||||
SCORE 100 Replacing in kind, 21 of 3" galvanized schedule pipe to replace leaking black pipe at various locations in the building, also replace in kind 3" and 2 " grooved couplings. No other work allowed under this permit. Date: January 10, 2012 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: January 31, 2012 | Permit id: 382383 | |||||
SCORE 100 Remove existing wet system prinkler piping in the oleum tank room and reinstall new pipe sprinkler protection-oleum storage. Date: May 10, 2012 Contractor: Keystone Fire Protection Client: Brotech Corp | Client Company: Purolite Company | Permit type: Suppression permit | Permit status: Completed | Completion date: October 19, 2012 | Permit id: 397998 | |||||
Alterations to correct fire code violations. Spill control and secondary containment for liquid and solid hazardous material in accordance with fire code Date: April 11, 2012 Client: Brotech Corp | Client Company: Purolite Company | Permit type: Alteration permit | Permit status: Completed | Completion date: February 19, 2013 | Permit id: 395413 | |||||
SCORE 100 Above storage tank removal Date: February 17, 2017 Contractor: Tti Environmental Inc Client: Brotech Corp | Client Company: Purolite Company | Permit type: Demolition permit | Permit status: Completed | Completion date: March 28, 2017 | Permit id: 760269 | |||||
SCORE 89 Seal 5" lateral & fai -pa1#2017-0620313 remove house trap and hermetically sealing the lateral by a cap or plug per section p-606. 1 of the philadelphia plumbing code 2004 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: March 3, 2017 Contractor: City Plumbing Llc Client: Brotech Corp | Client Company: Purolite Company | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 7, 2017 | Permit id: 763815 |