Electrical permit Date: February 4, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 512984 | |||||
Demolition permit Date: December 27, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 513129 | |||||
Electrical permit Date: May 6, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 339491 | |||||
Alteration permit Date: January 9, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 513005 | |||||
Electrical permit Date: December 4, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503985 | |||||
Suppression permit Date: May 23, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 342549 | |||||
Operations permit Date: November 23, 2010 Client: Kawin Llc | Permit status: Completed | Permit id: 20817 | |||||
Plumbing permit Date: May 3, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 338079 | |||||
Use permit Date: October 15, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 634508 | |||||
Electrical permit Date: December 29, 2008 Client: Kawin Llc | Permit status: Expired | Permit id: 194535 | |||||
Zoning/use permit Date: September 14, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 357892 | |||||
Use permit Date: September 4, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 492707 | |||||
Alteration permit Date: August 9, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 350827 | |||||
Alteration permit Date: December 11, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 648390 | |||||
Plumbing permit Date: January 13, 2016 Client: Kawin Llc | Permit status: Completed | Permit id: 663334 | |||||
Use permit Date: August 7, 2012 Client: Kawin Llc | Permit status: Completed | Permit id: 420665 | |||||
Plumbing permit Date: November 21, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 507500 | |||||
Zoning/use permit Date: January 21, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 583768 | |||||
Demolition permit Date: April 19, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 336343 | |||||
Alteration permit Date: February 12, 2016 Client: Kawin Llc | Permit status: Active | Permit id: 648387 | |||||
Suppression permit Date: December 26, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 513032 | |||||
Zoning/use permit Date: October 1, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 554812 | |||||
Administrative permit Date: March 23, 2010 Client: Kawin Llc | Permit status: Completed | Permit id: 212440 | |||||
Plumbing permit Date: January 23, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 516382 | |||||
Sign permit Date: July 8, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 588392 | |||||
Mechanical permit Date: August 31, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 360031 | |||||
Use permit Date: April 5, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 319306 | |||||
Electrical permit Date: February 9, 2016 Client: Kawin Llc | Permit status: Completed | Permit id: 659403 | |||||
Plumbing permit Date: April 7, 2009 Client: Kawin Llc | Permit status: Completed | Permit id: 209158 | |||||
Mechanical permit Date: December 20, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503381 | |||||
Suppression permit Date: May 22, 2012 Client: Kawin Llc | Permit status: Completed | Permit id: 406717 | |||||
Sign permit Date: October 7, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 363671 | |||||
Alteration permit Date: November 20, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503207 | |||||
Permit for the erection of one (1)) flatwall signs (10x35) on space # 1 accessory to sit down restaurant with take-out food, for the erection of one (1) accessory flatwall sign (16x70) accessory to retail sale of wearing appearel with accessories on space # 2 as part of an existing area shopping center with all other uses as previously approved. Size and location as shown in the application. Date: June 26, 2014 Client: Kawin Llc | Applicant: Hercules Grigos, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: August 21, 2014 | Permit id: 23159 | |||||
Demolition permit Date: December 27, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 513129 | |||||
Operations permit Date: November 23, 2010 Client: Kawin Llc | Permit status: Completed | Permit id: 20817 | |||||
Use permit Date: August 7, 2012 Client: Kawin Llc | Permit status: Completed | Permit id: 420665 | |||||
Zoning use permit Date: September 14, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 357892 | |||||
Use permit Date: September 4, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 492707 | |||||
Plumbing permit Date: November 21, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 507500 | |||||
Use permit Date: April 5, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 319306 | |||||
Administrative permit Date: March 23, 2010 Client: Kawin Llc | Permit status: Completed | Permit id: 212440 | |||||
Electrical permit Date: August 22, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 358415 | |||||
Electrical permit Date: December 29, 2008 Client: Kawin Llc | Permit status: Expired | Permit id: 194535 | |||||
Electrical permit Date: February 4, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 512984 | |||||
Plumbing permit Date: January 23, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 516382 | |||||
Suppression permit Date: May 23, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 342549 | |||||
Alteration permit Date: August 9, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 350827 | |||||
Mechanical permit Date: December 20, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503381 | |||||
Suppression permit Date: December 26, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 513032 | |||||
Demolition permit Date: April 19, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 336343 | |||||
Electrical permit Date: December 4, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503985 | |||||
Zoning use permit Date: October 29, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 568496 | |||||
Sign permit Date: October 7, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 363671 | |||||
Suppression permit Date: May 22, 2012 Client: Kawin Llc | Permit status: Completed | Permit id: 406717 | |||||
Plumbing permit Date: January 13, 2016 Client: Kawin Llc | Permit status: Completed | Permit id: 663334 | |||||
Alteration permit Date: January 9, 2014 Client: Kawin Llc | Permit status: Completed | Permit id: 513005 | |||||
Plumbing permit Date: May 3, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 338079 | |||||
Mechanical permit Date: April 28, 2011 Client: Kawin Llc | Permit status: Completed | Permit id: 337898 | |||||
Alteration permit Date: February 12, 2016 Client: Kawin Llc | Permit status: Active | Permit id: 648387 | |||||
Alteration permit Date: November 20, 2013 Client: Kawin Llc | Permit status: Completed | Permit id: 503207 | |||||
Zoning use permit Date: January 21, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 583768 | |||||
Alteration permit Date: December 11, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 648390 | |||||
Use permit Date: October 15, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 634508 | |||||
Sign permit Date: July 8, 2015 Client: Kawin Llc | Permit status: Completed | Permit id: 588392 | |||||
Electrical permit Date: February 9, 2016 Client: Kawin Llc | Permit status: Completed | Permit id: 659403 | |||||
Plumbing permit Date: April 7, 2009 Client: Kawin Llc | Permit status: Completed | Permit id: 209158 | |||||
Permit for the erection of one (1)) flatwall signs (10x35) on space # 1 accessory to sit down restaurant with take-out food, for the erection of one (1) accessory flatwall sign (16x70) accessory to retail sale of wearing appearel with accessories on space # 2 as part of an existing area shopping center with all other uses as previously approved. Size and location as shown in the application. Date: June 26, 2014 Client: Kawin Llc | Applicant: Hercules Grigos, Esq. | Permit type: Appeal | Permit status: Granted | Completion date: August 21, 2014 | Permit id: 23159 | |||||
For the creation of one (1) tenant space from two (2) existing spaces for use as group medical, dental & health practitioners office in an existing shopping center with other previously approved uses, parking and signs. No signs on this permit. Date: October 15, 2015 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 634508 | |||||
For level 2 interior alterations for fit-out for a nail salon in an existing space. No change in occupancy classification Date: June 29, 2017 Client: Kawin Llc | Permit type: Alteration permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 777196 | |||||
SCORE 100 11 16 10-erection of (1)-exhibit use tent Date: November 23, 2010 Contractor: Jefmar Party Rentals Client: Kawin Llc | Permit type: Operations permit | Permit status: Completed | Permit id: 20817 | |||||
SCORE 96 Moving existing ada lavy and drain, water line over about 7 feet, all total feet from soil stack 1 1 2 copper drain line under concrete slab Date: April 7, 2009 Contractor: William Nicholson Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 28, 2009 | Permit id: 209158 | |||||
Interior exterior alterations, interior demo and alterations, fit out, new demising walls - combine 2 tenant spaces, upgrades to finishes, accessible upgrades as per plans. Additional permits req: electrical, plumbing, hvac, sprinklers & signs, Date: December 11, 2015 Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 4, 2016 | Permit id: 648390 | |||||
SCORE 97 Install 41 outlets,42 lighting fixtures,12 switches,2 emergency lights,5 emergency exit lights. Install 2 remote heads and 2 bathroom light fan combos per 2008 nec (commercial) Date: September 15, 2017 Contractor: Anthony Franklin Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 7, 2017 | Permit id: 800182 | |||||
For a retail sale of consumer goods at space # 7 as part of existing area shopping center on the same lot with all other uses as previously approved. No sign on this application. Date: July 12, 2017 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: July 12, 2017 | Permit id: 799233 | |||||
SCORE 100 Alteration: interior plumbing;nail salon; plastic pipe piping prohibited in this occupancy p902. 5; p1005. 5 & p1102. 3 ppc, code bulletin 901 r3 - the installation will comply with the philadephia plubming code 2004 Date: July 18, 2017 Contractor: Hilsford Vidal Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: August 8, 2017 | Permit id: 797394 | |||||
Proposed for nail salon fit out as per plans. Installation of the ventilation system as per plans. Date: June 29, 2017 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: June 29, 2017 | Permit id: 794017 | |||||
SCORE 100 Existing 300amp single phase service to be reused, install lighting fixtures,recepts and switches with hospital grade wiring as per 2008 nec (east district) Date: February 9, 2016 Contractor: David Brandolph Electric Co In Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 20, 2016 | Permit id: 659403 | |||||
SCORE 100 Replace: (2) em packs, (3) exits, (2) remote heads. Install new exhaust fan in bathroom. Add (6) outlets throughout. Replace pull station. In accordance with 2005 nec Date: December 29, 2008 Contractor: Brian Stillman Client: Kawin Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: July 21, 2009 | Permit id: 194535 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 11, 2017 Contractor: Cellich Fire Protection Inc Client: Kawin Llc | Permit type: Suppression permit | Permit status: Active | Completion date: September 11, 2017 | Permit id: 815145 | |||||
For the installation of a new ventilation system as per plans. See permit 777196 for plans. Date: June 29, 2017 Client: Kawin Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: August 8, 2017 | Permit id: 794023 | |||||
For level ii alterations to an existing tenant space for proposed masonry opening for a new store front and entry door. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for signage and all other work. Date: February 12, 2016 Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 4, 2017 | Permit id: 648387 | |||||
Interior fitout. Separate permit for co as per applicant requested. Date: May 20, 2011 Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 13, 2012 | Permit id: 339775 | |||||
SCORE 100 Provide temp lighting, recepts for six (6) months and provided emply conduits for the future tenants as per 2008 nec (east district) Date: May 6, 2011 Contractor: David Brandolph Electric Co In Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 339491 | |||||
SCORE 93 Aka 2401 e. Tioga street - 1st floor - replace approx. 85-0" of underground sanitary house drain piping within the building Date: May 3, 2011 Contractor: Gerard Wagner Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 13, 2012 | Permit id: 338079 | |||||
Interior demolition of non load bearing walls and ceiling only. No other work allowed under this permit. Contact streets department for dumpster permit and footway closure. Date: November 7, 2013 Client: Kawin Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 504949 | |||||
SCORE 100 Replace outlets,install 2 ceiling fan using existing wiring circuits and fire alarm per 2008 nec & nfpa 72 (health care facility) Date: February 4, 2014 Contractor: Russell Baysmore Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 512984 | |||||
SCORE 100 Rough in 2 waterclosets, 2 lavy sinks, 1 mop sik and 1 water fountain Date: November 21, 2013 Contractor: Sam Wexler Plumbing Inc Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 15, 2014 | Permit id: 507500 | |||||
Certificate of occupancy and lawful occupancy Date: March 23, 2010 Client: Kawin Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: April 12, 2010 | Permit id: 212440 | |||||
Reconfigure of existing parking lot for an increase in spaces from 115 to 145 spaces per plans. No change in height or area. No signs this appl Date: April 5, 2011 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: April 5, 2011 | Permit id: 319306 | |||||
For a minor face change to an existing flatwall awning sign of space #2. (1) sign measuring 5x61 as per plans Date: October 29, 2014 Client: Kawin Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 29, 2014 | Permit id: 568496 | |||||
SCORE 93 For interior demolition of an interior space and for the renovation of said space. No change in occupancy. This work activity shall be performed by contractors and sub-contractors licensed by the city of philadelphia. This building and space are fully sprinklered. Date: January 9, 2014 Contractor: Russells General Contracting Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: June 12, 2014 | Permit id: 513005 | |||||
SCORE 93 Hvac ductwork and mechanical exhaust system receiving area & break room. Date: August 31, 2011 Contractor: Vito Construction Inc Client: Kawin Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 16, 2011 | Permit id: 360031 | |||||
SCORE 100 2 toilets,2 lavs,2 floor drains,1 mop sink,1 water heater rough in and finish Date: August 30, 2011 Contractor: J S Plumbing Company Llc Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 27, 2012 | Permit id: 360763 | |||||
Interior demolition of nonload bearing partitions of a retail building Date: April 19, 2011 Client: Kawin Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 15, 2011 | Permit id: 336343 | |||||
Canopy addition and creation of two (2) spaces (space 1 and 2) from one (1) space. Space # 1-to remain vacant (use registration permit required prior to occupancy), space # 2 - retail variety store to include sale of pre-packaged food with all other uses as previously aprpoved in an existing shopping center. No sign on this permit. Date: May 17, 2011 Client: Kawin Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 17, 2011 | Permit id: 337738 | |||||
Converting an existing vacant space into a retail apparel store in space # 1 with existing retail variety store with sale of pre-packaged food as part of an existing shopping center. No sign. Date: August 7, 2012 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: August 7, 2012 | Permit id: 420665 | |||||
SCORE 100 New 2 amp service, add lighting fixtures, add recpts & emergency & exit lighting as per nec 2008 (retail bldg) Date: December 4, 2013 Contractor: David Brandolph Electric Co In Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 503985 | |||||
SCORE 100 Dollar general fit out as per electrical plans;lighting emergency lighting receptacles as per 2008 nec. Date: August 22, 2011 Contractor: Blessing Electric Co Inc Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 17, 2011 | Permit id: 358415 | |||||
SCORE 96 Relocate 18 existing sprinklers Date: December 26, 2013 Contractor: Jersey Fire Protection Corp Client: Kawin Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 513032 | |||||
SCORE 93 General clean up and removal of non bearing partitions (interior) - Date: December 27, 2013 Contractor: Russells General Contracting Client: Kawin Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: August 25, 2015 | Permit id: 513129 | |||||
SCORE 100 Street level store americas kids electrical alterations - install a standard intrusion alarm system: cp, keypad, rf doorr contacts, rf motion detectors, rf pani buttons and gsm radio - work will comply with the 2008 nec Date: January 21, 2014 Contractor: Vector Security Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 9, 2014 | Permit id: 516101 | |||||
Replacement of face on existing sign cabinet on bldg for dollar store. Existing electric to be used. Date: October 7, 2011 Client: Kawin Llc | Permit type: Sign permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 363671 | |||||
SCORE 100 Relocate existing sprinkler heads(commercial) Date: May 22, 2012 Contractor: B. M. Consulting Services Inc Client: Kawin Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: February 15, 2013 | Permit id: 406717 | |||||
SCORE 100 Relocate 88 sprinkler heads throughout (future dollar general store) Date: May 23, 2011 Contractor: Tri State Fire Protection Client: Kawin Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: October 22, 2015 | Permit id: 342549 | |||||
SCORE 100 Relocation of existing 400amp service and meter as per 2008 nec Date: June 13, 2011 Contractor: David Brandolph Electric Co In Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 342647 | |||||
SCORE 93 Tenant fit out for retail variety store. Date: August 9, 2011 Contractor: Vito Construction Inc Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: September 16, 2011 | Permit id: 350827 | |||||
SCORE 100 New fire alarm panel, pull stations, horns dtrobes, duct detectors, and flow and tamper switches for the sprinkler system, smoke detector in electric room as per 2008 nec Date: August 15, 2011 Contractor: David Brandolph Electric Co In Client: Kawin Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 354321 | |||||
Erection of single face cabinet sign wall mounted 3 9" x 26 as per plans. Date: September 14, 2011 Client: Kawin Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 18, 2011 | Permit id: 357892 | |||||
SCORE 99 Relocate 2 diffusers in retail Date: April 28, 2011 Contractor: Industrial Mechanical Contract Client: Kawin Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 10, 2012 | Permit id: 337898 | |||||
SCORE 99 Install channel letter sign as per drawings Date: July 8, 2015 Contractor: Vivona Corporation Client: Kawin Llc | Permit type: Sign permit | Permit status: Completed | Completion date: August 10, 2015 | Permit id: 588392 | |||||
SCORE 100 Replace waste and water line and set lav sink and laundry tray (medical office) Date: January 23, 2014 Contractor: Norman Cole Sr, Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 27, 2015 | Permit id: 516382 | |||||
Erect two (2) flat wall awning signs and one(1) flatwall sign Date: October 1, 2014 Client: Kawin Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 554812 | |||||
SCORE 99 Level iii interior alterations to an existing structure to create a new mercantile space. Alterations include new accessible toilet rooms, vestibule alterations and exterior wall infills seals. New dimising walls also part of this permit. Building fully sprinklered. Asbestos to be treated removed prior to commencement of work. Separate permits required for electrical, mechanical, fire suppression, plumbing and tenant-fit outs. Date: November 20, 2013 Contractor: Kasco Construction Co Inc Client: Kawin Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: January 29, 2014 | Permit id: 503207 | |||||
Obtain permit for proposed retail apparel. Obtain permir for proposed retail tenant space see attached site plan. Date: September 4, 2013 Client: Kawin Llc | Permit type: Use permit | Permit status: Completed | Completion date: September 4, 2013 | Permit id: 492707 | |||||
SCORE 100 Replace 2 toilet, 2 sinks, 2 water heaters, 1 kitchen sinks the installation will comply with the philadelphia plumbing code 2004 Date: January 13, 2016 Contractor: Sam Wexler Plumbing Inc Client: Kawin Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 26, 2016 | Permit id: 663334 | |||||
SCORE 100 For the installation of hvac equipment to include the replacement of four (4) roof top units and the installation of exhaust fans in bathrooms as shown per approved plans. Separate permits required for all other alterations. Date: December 20, 2013 Contractor: Hvac Services Inc Client: Kawin Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 503381 |