Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 73 Installation of 171 (55. 9kw) solar cells on roof of utilities building o at ufo facil;ity with electrical modifications to tie the array into existing electrical system. Permit type: Electrical | Permit status: Finaled | Permit id: B12-4304 | |||||
SCORE 56 Av system upgrade to utilities field operations included racking, required electrical will be subbed to lunardi, subject to field inspection. Permit type: Electrical | Permit status: Issued | Permit id: B12-2297 | |||||
SCORE 56 Installation of valve sculpture artwork at the west college utilities field office. Permit status: Issued | Permit id: B11-3971 | |||||
SCORE 56 Add door to existing ice machine room. Permit status: Finaled | Permit id: B12-1038 |