Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 04-12-032 | Parcel: 001010001000 | |||||
Permit id: 05-04-093 | Parcel: 001010001000 | |||||
Install 1" water meter; new sfd, bridgeway lakes 1 phase 3. Temporary water paid for six months from issuance date. Permit id: 04-1132 | |||||
Install 1" water meter; new sfd, bridgeway lakes 1 phase 3. Temporary water paid for six months from issuance date. Permit id: 05-0574 | |||||
Pool - all work shall conform to city standards. A pre-inspection and final inspection is required!! Final eng. Permit inspection is required prior to building permit final inspection. Any damage to curb, gutter, landscape or sidewalk will be repaired prior to deposit refund. Excavator relocating soil shall obtain permission & required permits from local municipal agencies and adjacent owners prior to soil relocation or access use of adjacent property. Back yard access shall have permission Permit id: 05-1201 | Parcel: 072042005000 |