| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Existing building exterior faÒºade finish material replacement storefront replacement second floor window replacement and parapet extension as per plans as per code. Permit id: Com2015-09817 | |||||
Inteior demo only 70 sq. Ft --- remove floor finish - wall finish and debris for first and second floor as per code demo only separate permit will be pulled for tenant fit out Permit id: Com2015-05596 | |||||
Remove existing awning cover and replace with new cover made of sunbrella material. Awning is ft long height 8-11 sidewalk slopes projects 4 from building signs printed on awning (2) 4x36 and 8x6 using existing framing as per sketch & as per cod Permit id: Com2012-26413 | |||||
Point(s) of protection for low voltage security equipment as per code Permit id: Com2011-25220 | |||||
(use) use portion of premises (1st fl 3315)for tuxedo sales and rentals and accessories sales(change of operator) Permit id: Use2009-01106 | |||||
17 points of protection; low voltage security equipment as per code. Permit id: Com2009-12198 | |||||
Remove existing awning cover and replace with new cover made of sunbrella material. Awning is ft long height 8-11 sidewalk slopes projects 4 from building signs printed on awning (2) 4x36 and 8x6 using existing framing as per sketch & as per code Expiration date: July 24, 2013 | Permit id: Com2012-26413 | |||||
Existing building exterior faade finish material replacement storefront replacement second floor window replacement and parapet extension as per plans as per code. Expiration date: November 28, 2015 | Permit id: Com2015-09817 | |||||
Request for time extension on permit# com2015-09817 issued on 05/28/15 with original/amended completion date of 11/28/15original permit description:(com2015-09817)existing building exterior faade finish material replacement storefront replacement second floor window replacement and parapet extension as per plans as per code. Expiration date: June 10, 2016 | Permit id: Com2015-29734 | |||||
All work complete and ready to gooriginal permit description:(com2015-05596)inteior demo only 70 sq. Ft --- remove floor finish - wall finish and debris for first and second floor as per code demo only separate permit will be pulled for tenant fit out Expiration date: January 10, 2016 | Permit id: Com2015-29735 | |||||
Request for time extension on permit# com2015-09817 issued on 05 28 15 with original amended completion date of 11 28 15original permit description:(com2015-09817)existing building exterior faade finish material replacement storefront replacement second floor window replacement and parapet extension as per plans as per code. Expiration date: June 10, 2016 | Permit id: Com2015-29734 |