Temporary occupancy of public right-of-way: full traffic closure Permit status: Closed-finaled | Permit id: Top-2014-0412 | |||||
Install eight 18 sq. Ft. Permanent banners, 5 on the south face and 3 on the east face per plans. Permit status: Closed-finaled | Permit id: Pe09-0502 | |||||
Proposed alternative: two new windows for third floor; design intent is to match existing glass vlt, which is lower than the required minimum percentage. Code: section 5. 2. 15 transparency Permit status: Closed-approved | Permit id: P-Ad-2015-0028 | |||||
Dumpster Permit status: Issued | Permit id: Top-2015-0292 | |||||
Temporary occupancy of public right-of-way: tent and items pertaining to mvp will be placed in sidewalk area on sept 12th, 21st , 26th, and 28th. Permit status: Issued | Permit id: Top-2016-0370 | |||||
Mvp sports clubs is infilling the two existing double height racquetball courts on the second level with a new intermediate level matching the third floor elevation. Approximately 14 sf is being added to the third floor. Permit status: Closed-use and occupancy | Completion date: October 9, 2015 | Permit id: Bc-Int-2015-097 | |||||
Proposed alternative: two new windows for third floor; design intent is to match existing glass vlt, which is lower than the required minimum percentage. Code: section 5. 2. 15 transparency Permit status: Closed-approved | Permit id: P-Ad-2015-0028 |