Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install new fire alarm system in existing remodeled theater/office--- 2 sets of plans Permit type: Intake | Permit status: Closed | Completion date: November 20, 2014 | Permit id: 2014-240247-000 | |||||
Sprinkler - add coverage for 180sf building addition, branch off of existing system (1 head) Permit type: Intake | Permit status: Approved | Completion date: January 2, 2015 | Permit id: 2015-100420-000 | |||||
Add (5) circuits to panel for the clay room in art building. Permit type: Electrical inspections | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2015-105816-000 | |||||
Renn fayre - end of year festival with music and fireworks Permit type: Intake | Permit status: Complete | Completion date: April 14, 2015 | Permit id: 2015-149139-000 | |||||
Fireworks Permit type: Intake | Permit status: Complete | Completion date: May 29, 2015 | Permit id: 2015-178005-000 | |||||
Parker house parking turnout Permit type: Intake pw | Permit status: Assigned | Completion date: November 13, 2008 | Permit id: 2008-175090-000 | |||||
B2/pr# 10-133/ quiett center interior only remodel, formerly old health center Permit type: Reviews | Permit status: Approved | Completion date: June 24, 2010 | Permit id: 2010-150111-000 | |||||
Partial - excavation and site utilites and under slab drains for furture building, decommissioning three existing drywells and reconnecting existing kaul auditorium roof drains to new storm lines. Storm lines connect to new vegetative basins. Also relocating and abondining existing sanitary sewer for three other existing buildings on campus. Reconfigure parking lot Permit type: Application | Permit status: Approved | Completion date: August 5, 2011 | Permit id: 2011-158544-Utl | |||||
Fixed system - installation of a pyrochem open face paint spray booth fire system into paint booth8/30/13 no paint booth permit found Permit type: Intake | Permit status: Approved | Completion date: August 30, 2013 | Permit id: 2013-199112-000 | |||||
Plumbing renovation at reed college studio art building Permit type: Intake | Permit status: Closed | Completion date: January 2, 2014 | Permit id: 2014-100439-000 | |||||
F5/ greenwood, remodel 1st &2nd level, mezzanine; level one remove all walls, doors, restrooms, opening for new elevator, add back walls, doors, for offices, meeting rooms, restrooms, fixtures, new exterior windows,flooring, ceiling; level two remove walls, doors, decking, deck and structure, new stair and landing, flooring, seating, finishes; new footing for new elevator Permit type: Intake | Permit status: Closed | Completion date: March 6, 2014 | Permit id: 2014-124307-000 | |||||
Plumbing renovation at reed college for the old theaterremodel rr, kitchen area Permit type: Intake | Permit status: Closed | Completion date: March 20, 2014 | Permit id: 2014-129246-000 | |||||
Greenwood/old theater remodel - power/fire/a/v Permit type: Intake | Permit status: Closed | Completion date: March 21, 2014 | Permit id: 2014-129645-000 | |||||
F14/ prexy interior remodel, new elevator opening, ada bathrooms and entrance, bike storage, walls for conference rooms and offices, replace roof, new entrance exterior pathways, parking & landscape Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-132824-000 | |||||
Prexy interior remodel - power Permit type: Intake | Permit status: Closed | Completion date: April 10, 2014 | Permit id: 2014-138554-000 | |||||
Reed college campus-wide party with fireworks Permit type: Intake | Permit status: Complete | Completion date: April 15, 2014 | Permit id: 2014-142224-000 | |||||
Plumbing renovation at reed college prexy housefrench drains on east and west side, ks, 2 mop, 3 wc3 lav, elevator sump Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156244-000 | |||||
Fireworks and amplified music Permit type: Intake | Permit status: Complete | Completion date: May 23, 2014 | Permit id: 2014-161110-000 | |||||
F3/ replace small boiler to existing connections, replace a couple exhaust fans, heaters, Permit type: Intake | Permit status: Closed | Completion date: June 2, 2014 | Permit id: 2014-164147-000 | |||||
Relocate sprinklersthrought hall also relocate riser---2 sets of plans Permit type: Intake | Permit status: Closed | Completion date: June 5, 2014 | Permit id: 2014-165488-000 | |||||
Prexy interior remodel - hvac controls Permit type: Intake | Permit status: Closed | Completion date: July 6, 2014 | Permit id: 2014-179509-000 | |||||
Relocate and make system changes due to a full renovation remodel of the building---1 plan Permit type: Intake | Permit status: Closed | Completion date: July 9, 2014 | Permit id: 2014-181100-000 | |||||
Addition of 1 sf pottery/clay mixing room off main arts building, open space with double doors and overhead door Permit type: Application | Permit status: Approved | Completion date: July 9, 2014 | Permit id: 2014-181397-000 | |||||
Relocate fire panel everything else stayed the same---no plans Permit type: Intake | Permit status: Closed | Completion date: August 8, 2014 | Permit id: 2014-195853-000 | |||||
Greenwood/old theater remodel - hvac controls Permit type: Intake | Permit status: Closed | Completion date: August 22, 2014 | Permit id: 2014-201916-000 | |||||
Install new 800amp service Permit type: Intake | Permit status: Closed | Completion date: August 28, 2014 | Permit id: 2014-205340-000 | |||||
Push/pull one15-ton and two 17. 5-ton gas packs, structural details attached Permit type: Intake | Permit status: Closed | Completion date: October 7, 2014 | Permit id: 2014-222265-000 | |||||
Replace roof top chiller - hauser library Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-218944-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: August 28, 2015 | Permit id: 2015-225356-000 | |||||
Street tree pruning permit Permit type: D - permit request | Permit status: Permit issued | Completion date: November 6, 2015 | Permit id: 2015-250704-000 | |||||
F3/ chem lab/ suite 1 - create chemistry teaching lab by removing partition walls, new walls, electrical, plumbing, mechanical, fixtures and finishes Permit type: Reviews | Permit status: Approved | Completion date: November 12, 2015 | Permit id: 2015-264117-000 | |||||
F3/ chem lab/ suite 1 - create chemistry teaching lab by removing partition walls, add new walls, electrical, plumbing, mechanical, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-264119-000 | |||||
Plumbing renovation at reed college chemistry lab5 lab tables w/ sinks and di water and 2 fume hoods w/ sinks Permit type: Intake | Permit status: Closed | Completion date: December 10, 2015 | Permit id: 2015-275386-000 | |||||
Chem lab #1 remodel - power/voice/data Permit type: Intake | Permit status: Closed | Completion date: December 17, 2015 | Permit id: 2015-278896-000 | |||||
B1/mech t. I. Rework ductwork and grilles, new exhaust hoods, add new return & supply grilles throughout space. Permit type: Intake | Permit status: Closed | Completion date: December 29, 2015 | Permit id: 2015-282375-000 | |||||
Removing drop ceiling and maintaining upright coverage. Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107667-000 | |||||
Street tree pruning permit Permit type: D - permit request | Permit status: Permit issued | Completion date: February 24, 2016 | Permit id: 2016-126008-000 | |||||
F11/ remove old rackeball/handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc Permit type: Reviews | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130789-000 | |||||
F11/ remove old racketball/handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc. Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130804-000 | |||||
F11/ remove old racketball/handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc. Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-130804-000 | |||||
Sports center remodel - power Permit type: Intake | Permit status: Closed | Completion date: March 10, 2016 | Permit id: 2016-133139-000 | |||||
Plumbing renovation at reed college sports center1-df Permit type: Intake | Permit status: Closed | Completion date: March 28, 2016 | Permit id: 2016-141537-000 | |||||
F13/ lab 3 - faculty research lab renovation including new casework, equipment, exhaust hoods, finishes Permit type: Reviews | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155588-000 | |||||
F13/ lab 3 - faculty research lab renovation including new casework, equipment, exhaust hoods, finishes separate permit required for mechanical Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155594-000 | |||||
Festival Permit type: Intake | Permit status: Complete | Completion date: April 19, 2016 | Permit id: 2016-155758-000 | |||||
Remove and replace defective hvac controlsfaxed Permit type: Intake | Permit status: Closed | Completion date: June 14, 2012 | Permit id: 2012-150786-000 | |||||
Replace lv controlsfaxed Permit type: Intake | Permit status: Closed | Completion date: July 19, 2012 | Permit id: 2012-163784-000 | |||||
Ddc controls for hvac equiptment: retrofitfaxed Permit type: Intake | Permit status: Closed | Completion date: October 15, 2012 | Permit id: 2012-194324-000 | |||||
Prexy building remodelfaxed Permit type: Electrical inspections | Permit status: Approved | Completion date: November 25, 2015 | Permit id: 2014-158814-000 | |||||
Install new 800amp servicefaxed Permit type: Intake | Permit status: Closed | Completion date: August 28, 2014 | Permit id: 2014-205340-000 | |||||
Disconnect power to existing boiler, reconnect power to newly installed (replacement) boiler Permit type: Electrical inspections | Permit status: Approved | Completion date: August 4, 2015 | Permit id: 2015-197963-000 | |||||
B1/ hauser library replace like for like ton 38 lbs roof top chiller Permit type: Reviews | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-203755-000 | |||||
Replace roof top chiller - hauser library Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-218944-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: August 28, 2015 | Permit id: 2015-225356-000 | |||||
F3 chem lab suite 1 - create chemistry teaching lab by removing partition walls, new walls, electrical, plumbing, mechanical, fixtures and finishes Permit type: Reviews | Permit status: Approved | Completion date: November 12, 2015 | Permit id: 2015-264117-000 | |||||
F3 chem lab suite 1 - create chemistry teaching lab by removing partition walls, add new walls, electrical, plumbing, mechanical, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-264119-000 | |||||
Plumbing renovation at reed college chemistry lab5 lab tables w sinks and di water and 2 fume hoods w sinks Permit type: Intake | Permit status: Closed | Completion date: December 10, 2015 | Permit id: 2015-275386-000 | |||||
Chem lab #1 remodel - power voice data Permit type: Intake | Permit status: Closed | Completion date: December 17, 2015 | Permit id: 2015-278896-000 | |||||
B1 mech t. I. Rework ductwork and grilles, new exhaust hoods, add new return & supply grilles throughout space. Permit type: Intake | Permit status: Closed | Completion date: December 29, 2015 | Permit id: 2015-282375-000 | |||||
F11 remove old rackeball handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc Permit type: Reviews | Permit status: Approved | Completion date: March 4, 2016 | Permit id: 2016-130789-000 | |||||
F11 remove old racketball handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc. Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130804-000 | |||||
F11 remove old racketball handball courts, prepare flooring for new use, create outdoor area within building structure in this location, metal mesh wall, relocate cardio to dedicated space, new exterior windows, ceiling lighting, elec, etc. Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-130804-000 | |||||
F13 lab 3 - faculty research lab renovation including new casework, equipment, exhaust hoods, finishes Permit type: Reviews | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155588-000 | |||||
F13 lab 3 - faculty research lab renovation including new casework, equipment, exhaust hoods, finishes separate permit required for mechanical Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155594-000 | |||||
Festival Permit type: Intake | Permit status: Complete | Completion date: April 19, 2016 | Permit id: 2016-155758-000 | |||||
B1 hauser library replace like for like ton 38 lbs roof top chiller Permit type: Reviews | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-203755-000 | |||||
Tent - for public assembly permit Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: August 14, 2001 | Current use: Educational | Permit id: 2000-145778-000 | |||||
Ti- adding moveable shelving in library Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: November 1, 2000 | Current use: Institutional | Permit id: 2000-151034-000 | |||||
Demolish, remove and fill pool, sidewalk, bleachers & outbuilding. Client: Southeast Uplift Neighborhood Program | Permit type: Demolition | Permit status: Final | Completion date: November 21, 2007 | Current use: Institutional | Permit id: 2000-151066-000 | |||||
6,715 sf addition and remodel of existing art building. Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: October 19, 2001 | Current use: Institutional | Permit id: 2000-183812-000 | |||||
Addition & remodel of sports center. See 2nd site plan & attached package. See completeness check. Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: November 8, 2001 | Current use: Educational | Permit id: 2001-102605-000 | |||||
Install ceiling height partitions in room e-101. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: December 29, 2000 | Current use: Institutional | Permit id: 2000-187983-000 | |||||
Site work associated with 01-125662 co and 01-125663 co - additional parking, roadway adjustment, landscaping Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: November 21, 2007 | Current use: Institutional | Permit id: 2001-125664-000 | |||||
Build 3-story 29,915 sf technology center. Site work under separate permit, 01-125664-co. - 5 21 02 pay bldg reinspection fee Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: September 26, 2002 | Current use: Institutional | Permit id: 2001-125662-000 | |||||
Reed college library addition and remodel ... Site work under separate permit 01-125664-co. Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: September 26, 2002 | Current use: Institutional | Permit id: 2001-125663-000 | |||||
Build new concrete fish ladder per lur # 01-00175 en Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: January 8, 2003 | Current use: Business | Permit id: 2001-138772-000 | |||||
Build new restroom facility on campus near sports field Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: September 23, 2002 | Current use: Educational | Permit id: 2001-143081-000 | |||||
Temporary placement of a tent for commencement - valid for 9 days. Separate permit reqd. From fire marshals office. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: May 29, 2001 | Current use: Assembly | Permit id: 2001-138510-000 | |||||
Ti of mezzanine to create secure storage spaces, equipment storage rooms, non-occupied. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: May 31, 2002 | Current use: Educational | Permit id: 2002-113841-000 | |||||
Create new interior coffee bar and lounge upgrades Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: September 26, 2002 | Current use: Educational | Permit id: 2002-125532-000 | |||||
Temp. Tent. For ceremony, duration 9 27 02 - 10 9 02. Separate permit reqd from portland fire bureau. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Issued | Current use: Institutional | Permit id: 2002-143197-000 | |||||
Tent for reed college graduation - 5-09-03 - 6-08-03 Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: November 8, 2007 | Current use: Assembly | Permit id: 2003-119819-000 | |||||
Temp. Tent. For ceremony, duration 05 11 04 - 05 21 04. Separate permit reqd from portland fire bureau. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: November 8, 2007 | Current use: Institutional | Permit id: 2004-021582-000 | |||||
New pedestrian & bicycle bridge across reed canyon (see land use folder 07-128198 lu) Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: October 31, 2008 | Current use: Utility | Permit id: 2007-143274-000 | |||||
New three story seventeen bedroom dormitory -see comments Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: September 10, 2008 | Current use: Educational | Permit id: 2007-139053-000 | |||||
New 78,0 sf performing arts building for dance, theatre and music education - main permit includes landscaping. (phased project, see 11-158544 utl 01 co, 11-158544 fnd 01 co, 11-158544 str 01 co, and 11-158544 rev 01 co.) trash enclosure under permit 12-124625 co, roof insulation 4" min, 10" max Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: November 13, 2013 | Current use: Assembly | Permit id: 2011-158544-000 | |||||
New trash enclosure that also houses a generator Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: October 16, 2013 | Current use: Storage | Permit id: 2012-124625-000 | |||||
Site improvements: grading, reconfigure pedestrian entrance at se 28th and woodstock, new retaining wall (>4) with signage(separate sign permit required,) new site lighting, new landscaping and modifications to existing drainage. Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: December 16, 2013 | Current use: Institutional | Permit id: 2013-119156-000 | |||||
Addition of 1 sf pottery clay mixing room off main arts building, open space with double doors and overhead door Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: February 19, 2015 | Current use: Business | Permit id: 2014-181397-000 |