104 unit building. Largest unit is 788 sqft - oar 918 reduced fees apply only to residential units. Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-118979-000 | |||||
Temp power for construction Permit type: Electrical inspections | Permit status: Approved | Completion date: February 20, 2015 | Permit id: 2015-120013-000 | |||||
Combo conn: 322 lf of 12 vsp combo main, approx d=9, in n fargo st. Contractor shall build new branch per std p-262 and connect sewer at new bom tap of 12 main. Contr install storm wye with cleanout behind curb. Contractor field verify sewer location and depth. Contact x37869 Permit type: Intake | Permit status: Closed | Completion date: February 27, 2015 | Permit id: 2015-125899-000 | |||||
New storm connection and site piping and fixtures Permit type: Intake | Permit status: Closed | Completion date: February 27, 2015 | Permit id: 2015-125950-000 | |||||
Alarm - install new alarm system for apt building Permit type: Intake | Permit status: Approved | Completion date: April 10, 2015 | Permit id: 2015-147367-000 | |||||
Supply and installation of complete plumbing system Permit type: Intake | Permit status: Closed | Completion date: April 13, 2015 | Permit id: 2015-148173-000 | |||||
Sprinklers-add new wet 8 dry fire sprinkler system to new mixed use building. All work per nfpa 13 and all applicable codes. Install underground supply from city connection to inside building Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196552-000 | |||||
Sprinklers-add new wet 8 dry fire sprinkler system to new mixed use building. All work per nfpa 13 and all applicable codes. Install underground supply from city connection to inside building Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196552-000 | |||||
Sprinklers-add new wet 8 dry fire sprinkler system to new mixed use building. All work per nfpa 13 and all applicable codes. Install underground supply from city connection to inside building Permit type: Fire bureau | Permit status: Completed | Completion date: July 6, 2015 | Permit id: 2015-196552-000 | |||||
5-story, 104 unit apartment building with on grade parking under the building and concrete retail Permit type: Application | Permit status: Approved | Completion date: November 7, 2014 | Permit id: 2014-229916-000 | |||||
Dfs - pt deck system Permit type: Application | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2014-229916-Dfs | |||||
Rev 01 - acm metal panel was changed to a flush metal panel and the flush metal panel and adhered thin brick was changed to a full brick cavity wall system. Minor adjustments to dimensions and building height were made to work on the brick module. Some columns were added at the ground floor and the foundation system revised to handle the new loads. There were some structural foundation coordination, including retaining walls, that is included in the revisions. Primarily this has to do with the foundations directly adjacent to the properties lines Permit type: Application | Permit status: Approved | Completion date: March 16, 2015 | Permit id: 2014-229916-Rev | |||||
Two 5-ton gas packs for corridors, 3-zone 3-ton heat pump, pthp for apartments, water heater flues in open parking, restroom, kitchen exhaust in boxed in joist and ul fc-7023 Permit type: Intake | Permit status: Closed | Completion date: November 7, 2014 | Permit id: 2014-229921-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: November 8, 2014 | Permit id: 2014-233681-000 | |||||
Ti for first time tenant; new partition walls to create new restroom; new coffee bar counter Permit type: Application | Permit status: Approved | Completion date: September 9, 2015 | Permit id: 2015-233472-000 | |||||
Supply and installation of plumbing of retail space. Permit type: Intake | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-244095-000 | |||||
Install limited energy cabling for multi-family dwelling units; additional limited energy for common spaces01/06/16 plus (3) limited energy per inspectors request Permit type: Intake | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-266420-000 | |||||
Temp heat tank Permit type: Intake | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271294-000 | |||||
Hazardous/tank - install additional 5 gal tank to job site. There will now be (2) 5 gal tanks on site. Tank is for temp heat, approx 4 months Permit type: Intake | Permit status: Approved w/ cond | Completion date: February 4, 2016 | Permit id: 2016-116618-000 | |||||
Dfs - trusses Permit type: Application | Permit status: Approved | Completion date: August 24, 2015 | Permit id: 2014-229916-Dfs | |||||
Dfs - storefront glazing Permit type: Application | Permit status: Approved | Completion date: November 2, 2015 | Permit id: 2014-229916-Dfs | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Application | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Issuance/intake | Permit status: Intake | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Fire bureau | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2014-229916-Rev | |||||
Sprinklers-add new wet 8 dry fire sprinkler system to new mixed use building. All work per nfpa 13 and all applicable codes. Install underground supply from city connection to inside building Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196552-000 | |||||
Install gas piping to retail space, (3) water heaters, (2) roof top units, and (1) generator. Plans w/co Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-198309-000 | |||||
Install limited energy cabling for multi-family dwelling units; additional limited energy for common spaces01 06 16 plus (3) limited energy per inspectors request Permit type: Intake | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-266420-000 | |||||
Hazardous tank - install additional 5 gal tank to job site. There will now be (2) 5 gal tanks on site. Tank is for temp heat, approx 4 months Permit type: Intake | Permit status: Approved w/ cond | Completion date: February 4, 2016 | Permit id: 2016-116618-000 | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Application | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Issuance/intake | Permit status: Intake | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 5, 2016 | Permit id: 2014-229916-Rev | |||||
Rev 02- remove 1 of 2 elevators, keeping 2 hour rated shaft for future installation option Permit type: Fire bureau | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2014-229916-Rev | |||||
Install gas piping to retail space, (3) water heaters, (2) roof top units, and (1) generator. Plans w co Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-198309-000 | |||||
Ti for first time tenant; new partition walls to create new restroom; new coffee bar counter; and kitchen area Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: October 12, 2016 | Current use: Business | Permit id: 2016-180592-000 |