Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Adding 12 x 26 x 7 height dormer to north side of house. Zoning clearance: #09-1417. All setbacks are existing. Comments: .... Shall not exceed 194" as proposed. Sidewalks is required if any future additional permitting in the future. Per j. R. 10/5/09. Client: Laidig, Melanie | Permit id: Sfd20092460 | |||||
Rebuilding 24 x dormer on south side. Zoning clearance: #09-1607. Setbacks are all existing. Comments: ....... Height not to exceed 21 ft., sidewalk is required in future if driveway replaced. Existing setbacks not to exceed the requirement and will remain as is. Per j. R. 11/16/09. Client: Laidig, Melanie | Permit id: Sfd20092703 | |||||
(electrical) misc wiring - dormer to north side of house. Client: Laidig, Melanie | Permit id: Elect20091761 | |||||
(electrical) misc wiring - southside dormer. Client: Laidig, Melanie | Permit id: Elect20091870 | |||||
SCORE 84 (electrical) misc wiring - dormer to north side of house. Client: Laidig, Melanie | Permit id: Elect20091761 | |||||
SCORE 84 Adding 12 x 26 x 7 height dormer to north side of house. Zoning clearance: #09-1417. All setbacks are existing. Comments: .... Shall not exceed 194" as proposed. Sidewalks is required if any future additional permitting in the future. Per j. R. 10/5/09. Client: Laidig, Melanie | Permit id: Sfd20092460 | |||||
SCORE 84 (electrical) misc wiring - southside dormer. Client: Laidig, Melanie | Permit id: Elect20091870 | |||||
SCORE 84 Rebuilding 24 x dormer on south side. Zoning clearance: #09-1607. Setbacks are all existing. Comments: ....... Height not to exceed 21 ft., sidewalk is required in future if driveway replaced. Existing setbacks not to exceed the requirement and will remain as is. Per j. R. 11/16/09. Client: Laidig, Melanie | Permit id: Sfd20092703 | |||||
SCORE 84 (electrical) misc wiring - dormer to north side of house. Client: Laidig, Melanie | Permit id: Elect20091761 | |||||
SCORE 84 Rebuilding 24 x dormer on south side. Zoning clearance: #09-1607. Setbacks are all existing. Comments: ....... Height not to exceed 21 ft., sidewalk is required in future if driveway replaced. Existing setbacks not to exceed the requirement and will remain as is. Per j. R. 11 16 09. Client: Laidig, Melanie | Permit id: Sfd20092703 | |||||
SCORE 84 Adding 12 x 26 x 7 height dormer to north side of house. Zoning clearance: #09-1417. All setbacks are existing. Comments: .... Shall not exceed 194" as proposed. Sidewalks is required if any future additional permitting in the future. Per j. R. 10 5 09. Client: Laidig, Melanie | Permit id: Sfd20092460 | |||||
SCORE 84 (electrical) misc wiring - southside dormer. Client: Laidig, Melanie | Permit id: Elect20091870 |