| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construct two story addition on left side of house 17 x27 new sun room and breakfast room with wrap around porch (8x17 10x20) to connect to existing front porch second floor addition to be 13x17 for new library as per plans as per code. Expiration date: December 13, 2016 | Permit id: Com2016-11659 | |||||
Reinstatement(original permit:com2016-11659:construct two story addition on left side of house 17 x27 new sun room and breakfast room with wrap around porch (8x17 10x20) to connect to existing front porch second floor addition to be 13x17 for new library as per plans as per code. ) Expiration date: April 24, 2017 | Permit id: Com2017-06427 | |||||
Scope of work: remove the the existing wooden retaining wall and replace with a 14 x concrete retaining wall approx 4 sf. To include steps to code. Steps dimensions (tread: 9" min rise: 8 1 4" max and width: 36" min) as per sketch and as per code. Expiration date: April 3, 2018 | Permit id: Com2017-61760 |