Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Relocate sprinkler heads on 11th floor to new ceiling layout. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Date: August 26, 2013 Permit status: Na | Permit id: Sprk269896 | |||||
Relocating (6) sprinkler heads on 1st floor. Work to be done one floor zone at a time. Date: December 19, 2011 Permit status: Na | Permit id: Sprk107769 | |||||
Relocating (37) sprinkler heads for new ceiling. Work to be done one floor zone at a time per nfpa stands. Date: December 19, 2011 Permit status: Na | Permit id: Sprk107773 | |||||
Tenant space renovation- sovergein bank 1st floor 3 speaker strobes strobe only 4 smoke detectors 1 nac booster. Doc#20130507 Date: May 22, 2013 Permit status: Na | Permit id: Bfdf238839 | Parcel: 0501156000 | |||||
Add a new pull-station; ~; doc# 20120015 Date: January 30, 2012 Permit status: Na | Permit id: Bfdf113715 | Parcel: 0501156000 | |||||
Relocate 3 speaker strobes &; 1 strobe.; no changes to system required; ~; doc# 20130892 Date: August 5, 2013 Permit status: Na | Permit id: Bfdf269914 | |||||
Stand lift at curb erect and maintain pedestrian protective staging on sidewalk 8pm to 6am Date: August 29, 2014 Permit type: Cranes | Permit status: Expired | Permit id: Occu-403114 | |||||
Stand lift at curb ; walk-thru staging on sidewalk; ; boston police area a; 343-4239; ; no street closures; 8 pm to 2 am Date: April 14, 2015 Permit type: Cranes | Permit status: Expired | Permit id: Occu-462767 | |||||
Supply install &; wire the following for tenant space - (8) speaker strobes (1) booster; per nfpa stands.; doc #20110869 Date: October 5, 2011 Permit status: Na | Permit id: Bfdf89754 | Parcel: 0501156000 | |||||
Install (1) new pull station on 1st floor; ~; doc# 20120037 Date: February 13, 2012 Permit status: Na | Permit id: Bfdf114455 | |||||
Installation of a pre-engineered fire suppression system into a kitchen hood. Per nfpa stands. 7 cmr 8th ed. To be tied to buidling fire alarm on seperate zone Date: January 30, 2012 Permit status: Na | Permit id: Sprk114955 | |||||
Relocate add 32 sprinkler heads in new gymnasium in basement. Work to be done per nfpa stands. One floor zone at a time Date: November 25, 2013 Permit status: Na | Permit id: Sprk305180 | Parcel: 0501156000 | |||||
Relocate (4) existing sprinkler heads in basement bathroom. Work to be done one floor zone at a time per nfpa stands 7 cmr. Date: December 19, 2011 Permit status: Na | Permit id: Sprk107857 | |||||
Installation of upho Date: January 6, 2014 Permit status: Na | Permit id: Chm316797 | Parcel: 0501156000 | |||||
Relocate (14) sprinkler heads.; add (4) new sprinkler heads from existing piping. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Per nfpa stands. Date: May 8, 2012 Permit status: Na | Permit id: Sprk131749 | |||||
SCORE 100 To furnish and install new and replacement system fire alarm devices per plans for build-out for the office of turkish consulate doc20120596 Date: June 26, 2012 Contractor: Stephen Nardone Permit status: Na | Permit id: Bfdf141510 | |||||
Connect ansul system to existing monitor module doc20120630 Date: May 23, 2012 Permit status: Na | Permit id: Bfdf143923 | |||||
SCORE 99 Relocate (33) sprinkler heads for new ceiling in hallway. Date: June 1, 2011 Contractor: Joseph Campbell Permit status: Na | Permit id: Sprk79431 | |||||
Complete 6th floor Date: November 12, 2014 Permit status: Na | Permit id: Asb425476 | Parcel: 0501156000 | |||||
Installation of upho Date: January 6, 2014 Permit status: Na | Permit id: Chm316796 | Parcel: 0501156000 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: March 25, 2010 Permit status: Na | Permit id: Bsd18919 | |||||
Welding / burning for removal and replacement of condensor tank for boilers bfd paid detail required Date: September 2, 2010 Permit status: Na | Permit id: Cbw40988 | |||||
To conduct the following: provide power for 2014 back bay block party Date: June 13, 2014 Permit type: Emergency generator | Permit status: Na | Permit id: Gp372851 | Parcel: 0501156000 | |||||
Demolition / renovation to office space to include drywall paint flooring and ceiling work Date: March 31, 2010 Permit status: Na | Permit id: Fdc18915 | |||||
Removal of asbestos Date: October 11, 2013 Permit status: Na | Permit id: Asb294809 | Parcel: 0501156000 | |||||
Installation of upho Date: November 5, 2013 Permit status: Na | Permit id: Chm292209 | Parcel: 0501156000 | |||||
Throughout the 6th floor Date: March 25, 2015 Permit status: Na | Permit id: Asb456484 | Parcel: 0501156000 | |||||
SCORE 99 Plumbing renvoation. Date: March 24, 2014 Contractor: Joseph Campbell Client: O M V Assoc Lmtd Partnership | Permit type: Plumbing | Current use: Comm | Permit id: Pl346188 | Parcel: 501156000 | |||||
SCORE 99 All cost associated with alt111460 - per g. M. - supply and install new acoustical ceiling supply and install drywall repair exterior walls. Supply and install new ceramic floor misc millwork upgrade electrical and plumbing. Hvac existing sprinkler existing. Date: March 27, 2012 Contractor: Edward Harrison Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf127299 |