Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit ![]() Client: Gugliuzza Thomas Gugliuzza Debra A | Permit status: Completed | Permit id: 653229 | |||||
Electrical permit ![]() Client: Gugliuzza Thomas Gugliuzza Debra A | Permit status: Completed | Permit id: 643618 | |||||
Alteration permit ![]() Client: Gugliuzza Thomas Gugliuzza Debra A | Permit status: Completed | Permit id: 659740 | |||||
Mechanical permit ![]() Client: Gugliuzza Thomas Gugliuzza Debra A | Permit status: Completed | Permit id: 659840 | |||||
Electrical permit ![]() Client: Klawitter Ryan W | Permit status: Completed | Permit id: 643618 | |||||
Plumbing permit ![]() Client: Klawitter Ryan W | Permit status: Completed | Permit id: 653229 | |||||
Mechanical permit ![]() Client: Klawitter Ryan W | Permit status: Completed | Permit id: 659840 | |||||
Alteration permit ![]() Client: Klawitter Ryan W | Permit status: Completed | Permit id: 659740 | |||||
SCORE 89 2 wc,2 lavs,1 tub,1 ktichen sink and 1 washer (sfd)the installation will comply with the philadelphia plumbing code 2004 ![]() ![]() Client: Klawitter Ryan W | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2016 | Permit id: 653229 | |||||
SCORE 100 Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work ![]() ![]() Client: Klawitter Ryan W | Permit type: Alteration permit | Permit status: Completed | Completion date: June 6, 2016 | Permit id: 642998 | |||||
SCORE 84 Remove front facade and replace with brick veneer masonry front wall with veneer - remove existing brick front wall, square feet. Frame new front wall with 2 x 4 studs and plywood sheathing. New framing to be secured to existing building and inspected prior to starting brickwork. Foundation wall to extend to first floor at 8 inch width. Start 4 inch brick veneer at first floor level, install brick ties every 32 inches, vertical and horizontal. Physically tie in every 4 feet at adjoining wall. Windows and door same location. Install capping, flashing and weep holes as per code requirements. ![]() ![]() Client: Klawitter Ryan W | Permit type: Alteration permit | Permit status: Completed | Completion date: May 24, 2016 | Permit id: 659740 | |||||
SCORE 100 Complete re-wire, 40- receptacles, 20- switches, 5- smoke detectors, 20- hi- hats, .. In accordance with 2008 nec for a one family building ![]() ![]() Client: Klawitter Ryan W | Permit type: Electrical permit | Permit status: Completed | Completion date: June 29, 2016 | Permit id: 643618 | |||||
SCORE 100 Install 60,0 btu 92% heil gas furnace in basement with air and related duct work. ![]() ![]() Client: Klawitter Ryan W | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 24, 2016 | Permit id: 659840 |