Category i demostick built bathroom fixtures shelving electrical all walls are non load bearing all demo is not structural as per code Expiration date: August 20, 2007 | Permit id: Com2007-04937 | |||||
Amend permit com2006-26655 issued on 4 2 07 withplans #2006-14 to add contractororiginal permit description:(com2006-26655)historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 2, 2008 | Permit id: Com2007-10536 | |||||
Install new sprinkler system in building with fire pump and 2 standpipes 364 sprinkler heads total. 6" max pipe size ordinary haz sprinkler spacing 1 as per plans as per code Expiration date: November 29, 2007 | Permit id: Com2007-10886 | |||||
Amend permit com2006-26655 issued on 2006-14 to add contractors as listedoriginal permit description:(com2006-26655)historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 2, 2008 | Permit id: Com2007-14397 | |||||
Amend permit#com2006-26655 issued on 4-2-07 w plans#2006-14 to add hvac contractor as stated above. Original permit description:(com2006-26655)historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 2, 2008 | Permit id: Com2007-17390 | |||||
Amend permit #com2006-26655 issued on 4 2 06 with plans #2006-14 to add the following additional work: change voltage from 277 4 volts to 120 208 volts and also changed incoming service and main switch board as per plans as per code. Expiration date: October 2, 2007 | Permit id: Com2007-22445 | |||||
Fire alarm; install complete fire alarm as per plan as per code. Expiration date: April 5, 2008 | Permit id: Com2007-23917 | |||||
Expiration date: March 2, 2008 | Permit id: Com2007-27276 | |||||
Request for time extension on permit#cvom2006-26655 issued on 4-2-07 with original completion date of 12-31-07. Original permit description:(com2006-26655)historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 9, 2008 | Permit id: Com2007-31236 | |||||
Request for time extension on permit#com2006-26655 issued on 4-2-07 with original completion date of 10-2-07. Original permit description:(com2006-26655)historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 25, 2008 | Permit id: Com2007-33132 | |||||
Use premises for mixed use commercial. Retail on 1st floor and offices on remaining of building (2nd 3rd 4th and 5th)work permit needed for each tenant fitout Permit id: Use2007-05692 | |||||
Install 125 btu gas furnaceinstall partial duct work Expiration date: June 1, 2005 | Permit id: Com2004-29998 | |||||
Amend permit #com2012-00625 issued on 01 12 2012 with plans #2012-42 to add electrical contractor as listed above. Original permit description:(com2012-00625)interior demolition category 1 non-structural alterations interior work (8 364 sq. Ft.) - interior alterations and repairs for tenant fit-out on floors 2 & 3. New gypboard walls and doors for offices no new ceilings (existing underside of floor assembly above) hvac is existing to remain new power and data to offices plumbing is existing to remain new lighting in offices all work as shown on plans as per code. Expiration date: July 12, 2012 | Permit id: Com2012-02710 | |||||
Interior demolition category 1 non-structural alterations interior work (8 364 sq. Ft.) - interior alterations and repairs for tenant fit-out on floors 2 & 3. New gypboard walls and doors for offices no new ceilings (existing underside of floor assembly above) hvac is existing to remain new power and data to offices plumbing is existing to remain new lighting in offices all work as shown on plans as per code. Expiration date: July 12, 2012 | Permit id: Com2012-00625 | |||||
Add 3 sprinkler heads and relocate 2 for coverage as per code Expiration date: September 22, 2012 | Permit id: Com2012-06099 | |||||
Historic renovation and restoration of building facades shell space for future tenant fit out as per plans and per code. Separate permits will be filed for sprinkler fire alarm< low voltage system and elevator. Expiration date: April 2, 2008 | Permit id: Com2006-26655 | |||||
Use portion of premises 2nd and 3rd floors as offices Permit id: Use2012-01342 | |||||
Furnish and install low voltage security system. 48 devices. As per code. Expiration date: February 29, 2008 | Permit id: Com2007-27009 | |||||
Install (11) surface mounted wall quadreplex receptacles on (4) new amp 1 volt circuits and (6) surface mounted ceiling quadreplex receptacles on (2) amp 1 volt circuits from existing panel as per code. Expiration date: October 6, 2011 | Permit id: Com2011-07564 |