Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Change of use single-family dwelling convert double into a singe, replace sheetrock, flooring, painting, electric & plumbing. Client: National, U S Bank | Permit id: B03002480 | |||||
SCORE 56 Change of use single-family dwelling convert vacant double to a single - sheetrock, paint exterior, install windows, replace 4 porch columns, mech, convert 1 kitchen to a bedroom Client: National, U S Bank | Permit id: B96003581 | |||||
SCORE 98 Electrical construction loop single-family dwelling michael kenney b03002480 Client: National, U S Bank | Permit id: E03003733 | |||||
SCORE 98 Electrical rewiring single-family dwelling michael kenney Client: National, U S Bank | Permit id: E03003734 | |||||
SCORE 82 Install pv solar system 4kw Permit type: Renovation (non-structural) | Permit status: Permit finaled | Completion date: July 23, 2012 | Expiration date: January 11, 2013 | Current use: Single family | Permit id: 12-18536-Rnvn | |||||
SCORE 56 Change of use single-family dwelling convert double into a singe, replace sheetrock, flooring, painting, electric & plumbing. Client: National, U S Bank | Permit id: B03002480 | |||||
SCORE 82 Install pv solar system 4kw Permit type: Renovation (non-structural) | Permit status: Permit finaled | Completion date: July 23, 2012 | Expiration date: January 11, 2013 | Current use: Single family | Permit id: 12-18536-Rnvn |