Use premises as 5 dwelling units 1st floor 1du 2nd fl 2du 3rd fl 2du Permit id: Use2015-01324 | |||||
Original permit description:(com2014-18003)original permit description:(com2014-02254)clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical Permit id: Com2015-06496 | |||||
Original permit description:(com2014-13195)amendment to permit # com2014-02254 plan 2014-214 issued 6/19/14 change to first floor interior layout (no additional changes to existing permit) as per plans and as per code. Permit id: Com2015-04581 | |||||
Original permit description:(com2014-18213)install new 13r wet fire sprinkler system (to vacant building) total heads 43 (system supplied by new domestic water line by others) as per plans and as per code.. Permit id: Com2014-43419 | |||||
Install new 13r wet fire sprinkler system (to vacant building) total heads 43 (system supplied by new domestic water line by others) as per plans and as per code.. Permit id: Com2014-18213 | |||||
Amendment to permit # com2014-02254 plan 2014-214 issued 6/19/14 change to first floor interior layout (no additional changes to existing permit) as per plans and as per code. Permit id: Com2014-13195 | |||||
Original permit description:(com2014-02254)clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical gas piping by others flooring) as per pla Permit id: Com2014-18003 | |||||
Provide and install 3 bells connected to the waterflow switch to provide occupant notification of sprinkler activation as per code. Permit id: Com2014-16111 | |||||
Clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical gas piping by others flooring) as per plans and as per code. Separate permit is requ Permit id: Com2014-02254 | |||||
Amend permit com2009-23503 issued on 12/16/09 with plans #2009-1327 to add hvac contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear Permit id: Com2010-03153 | |||||
Amend permit #2009-23503 issued on 12/16/09 without plans to add contractors as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side Permit id: Com2010-03445 | |||||
Amend permit# com2009-23503 issued on 12/16/09 with plans # 2009-1327 to add contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck Permit id: Com2010-01072 | |||||
Permit id: Com2010-01069 | |||||
Clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are require Permit id: Com2009-23503 | |||||
Interior demolition: category i; interior work: 6 379 sq. Ft.; category i demolition only; no structural removal; remove doors plaster gwb wood stud walls windows flooring pipes and miscellaneous electrical work; no new construction at this time; a Permit id: Com2009-17751 | |||||
Amend permit #2009-23503 issued on 12/16/09 without plans to add contractors as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-03445 | |||||
Amend permit com2009-23503 issued on 12/16/09 with plans #2009-1327 to add hvac contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-03153 | |||||
Interior demolition: category i; interior work: 6 379 sq. Ft.; category i demolition only; no structural removal; remove doors plaster gwb wood stud walls windows flooring pipes and miscellaneous electrical work; no new construction at this time; all work will be done as per code. Expiration date: January 30, 2010 | Permit id: Com2009-17751 | |||||
Amend permit# com2009-23503 issued on 12/16/09 with plans # 2009-1327 to add contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-01072 | |||||
Clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2009-23503 | |||||
Clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical gas piping by others flooring) as per plans and as per code. Separate permit is required for mechanical electrical and plumbing. Separate permits for sprinkler and fire notification system. As per bmz2013-433 approved with conditions for five dwelling unit no rear addition two offstreet parking provided in rear only 1 du on 1st fl and subject to m. O. U with charles village civic and harwood community association. Expiration date: December 19, 2014 | Permit id: Com2014-02254 | |||||
Original permit description:(com2014-02254)clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical gas piping by others flooring) as per plans and as per code. Separate permit is required for mechanical electrical and plumbing. Separate permits for sprinkler and fire notification system. As per bmz2013-433 approved with conditions for five dwelling unit no rear addition two offstreet parking provided in rear only 1 du on 1st fl and subject to m. O. U with charles village civic and harwood community association. Expiration date: December 19, 2014 | Permit id: Com2014-18003 | |||||
Original permit description:(com2014-18003)original permit description:(com2014-02254)clean exterior interior alterations (partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac electrical gas piping by others flooring) as per plans and as per code. Separate permit is required for mechanical electrical and plumbing. Separate permits for sprinkler and fire notification system. As per bmz2013-433 approved with conditions for five dwelling unit no rear addition two offstreet parking provided in rear only 1 du on 1st fl and subject to m. O. U with charles village civic and harwood community association. Expiration date: April 25, 2015 | Permit id: Com2015-06496 | |||||
Amendment to permit # com2014-02254 plan 2014-214 issued 6 19 14 change to first floor interior layout (no additional changes to existing permit) as per plans and as per code. Expiration date: March 9, 2015 | Permit id: Com2014-13195 | |||||
Original permit description:(com2014-13195)amendment to permit # com2014-02254 plan 2014-214 issued 6 19 14 change to first floor interior layout (no additional changes to existing permit) as per plans and as per code. Expiration date: September 9, 2015 | Permit id: Com2015-04581 | |||||
Amend permit# com2009-23503 issued on 12 16 09 with plans # 2009-1327 to add contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-01072 | |||||
Amend permit com2009-23503 issued on 12 16 09 with plans #2009-1327 to add hvac contractor as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-03153 | |||||
Amend permit #2009-23503 issued on 12 16 09 without plans to add contractors as listed above. Original permit description:(com2009-23503)clean exterior interior partitions doors windows drywall paint millwork repair fire escape rear deck new side walls at open deck hvac plumbing electrical gas piping by others flooring as per plans as per code. Separate permits are required for sprinklers and fire notification system Expiration date: December 16, 2010 | Permit id: Com2010-03445 |