Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Replace water damaged 2 amp main electrical panel in basement of sfd. Wire from meter to panel also replaced. Date: September 25, 2013 Contractor: Artifex Electric Client: John Barron, Barron | Applicant: Artifex Electric | Permit type: Electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 Total tear-off & reroof of sfd, squares of asphalt shingles and modified on a pitchs represented as 12 12, 3 12, and 1 4inch ft. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Date: June 3, 2015 Contractor: Tiley Roofing Inc Client: John Barron, Barron | Applicant: Tiley Roofing, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: June 17, 2015 | Current use: Single family d | |||||
SCORE 84 Replace water damaged 2 amp main electrical panel in basement of sfd. Wire from meter to panel also replaced. Client: John Barron | Permit type: Electrical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04895 | |||||
SCORE 100 Total tear-off & reroof of sfd, squares of asphalt shingles and modified on a pitchs represented as 12 12, 3 12, and 1 4inch ft. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: John Barron | Permit type: Roofing | Permit status: Cmp | Completion date: June 17, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-02163 |