Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(use)continue to use as a grocery store only( new operator) Permit id: Use2015-01233 | |||||
(use) the premises as a grocery and delicatassen store . As per bmz2012-5 approved on 01/22/13 with conditions requested by neighbourhood alliance s letter Permit id: Use2013-00707 | |||||
Interior work: 3 sqft. Exterior work: replace 5 windows same size and location replace 2 exterior drs same size & location drywall living rm kitchen bed rms install 8 interior doors same size & location. Install 8 new circuits. As per code. Permit id: Com2013-11399 | |||||
Add powder room to 1st floor new tub and facuet 2nd floor toilet vanity. Hook up existing gas to stove 0 btu and furnace 75 0 btu as per code hvac by others Permit id: Com2013-01506 | |||||
Install 2 1/2 ton ac with matching coil percent furnace - all ductwork as per code. Gas by others Permit id: Com2013-00724 | |||||
Water heater replacement Permit id: Plm2012-01119 | |||||
Permit id: Plm2010-01213 | |||||
"original permit description:(com2006-34986)rewire all branch circuits in house. 1 amp service already in place ""no change"" reconnect only as per code." Permit id: Com2008-05789 | |||||
"rewire all branch circuits in house. 1 amp service already in place ""no change"" reconnect only as per code." Permit id: Com2006-34986 | |||||
Install 1 0 btu 90 gas furance & 3 ton a/c. Run supply outlets to each rm run main supply duck in basement. Run 3 returns for 2nd flr & 1 return on 1st floor as per code. Gas & electric by others. Permit id: Com2006-34060 | |||||
Original permit description:(com2006-34986)rewire all branch circuits in house. 1 amp service already in place "no change" reconnect only as per code. Expiration date: April 4, 2008 | Permit id: Com2008-05789 | |||||
Installing new discharge line on sump pump to meet code. Expiration date: September 16, 2016 | Permit id: Com2016-06448 | |||||
Relocate 2 amp service cable Expiration date: December 16, 2004 | Permit id: Com2004-14564 | |||||
Install 1 0 btu 90+gas furance & 3 ton a/c. Run supply outlets to each rm run main supply duck in basement. Run 3 returns for 2nd flr & 1 return on 1st floor as per code. Gas & electric by others. Expiration date: May 2, 2007 | Permit id: Com2006-34060 | |||||
Rewire all branch circuits in house. 1 amp service already in place "no change" reconnect only as per code. Expiration date: May 10, 2007 | Permit id: Com2006-34986 | |||||
Use premises as a convenience store new operator Permit id: Use2017-01265 | |||||
Install 1 0 btu 90+gas furance & 3 ton a c. Run supply outlets to each rm run main supply duck in basement. Run 3 returns for 2nd flr & 1 return on 1st floor as per code. Gas & electric by others. Expiration date: May 2, 2007 | Permit id: Com2006-34060 | |||||
Install 2 1 2 ton ac with matching coil percent furnace - all ductwork as per code. Gas by others Expiration date: July 11, 2013 | Permit id: Com2013-00724 | |||||
(use) the premises as a grocery and delicatassen store . As per bmz2012-5 approved on 01 22 13 with conditions requested by neighbourhood alliance s letter Permit id: Use2013-00707 |