Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Category3: interior work: 15 sq ft: this includes all or part of category1 and allows the removal of more than 1/3 of the structure on any level. The remaining structure must be secured . Shore up existing building. Separate permit required for tenant Permit id: Com2014-20847 | |||||
Emergency removal of rear addition Permit id: Com2007-21737 | |||||
Category3: interior work: 15 sq ft: this includes all or part of category1 and allows the removal of more than 1/3 of the structure on any level. The remaining structure must be secured . Shore up existing building. Separate permit required for tenant fit out. Asper code. Expiration date: January 2, 2015 | Permit id: Com2014-20847 | |||||
Category3: interior work: 15 sq ft: this includes all or part of category1 and allows the removal of more than 1 3 of the structure on any level. The remaining structure must be secured . Shore up existing building. Separate permit required for tenant fit out. Asper code. Expiration date: January 2, 2015 | Permit id: Com2014-20847 |