To construct new 3-story single family dwelling with front loading garage and a roof top deck per bmza2014-583 approved 5/4/2015 w/condition as per plans as per code. Separate permit is required for mep and sprinkler system. Required sealed and signed s Permit id: Com2015-11230 | |||||
Permit id: Dem2015-00170 | |||||
To construct new 3-story single family dwelling with front loading garage and a roof top deck per bmza2014-583 approved 5/4/2015 w/condition as per plans as per code. Separate permit is required for mep and sprinkler system. Required sealed and signed stamped signature ready set in order to pick up permit Expiration date: September 23, 2016 | Permit id: Com2015-11230 | |||||
Plumbing for new 3 1/2 baths kitchen sink dishwasher garbage disposal washing machine hook-ups and electric water heater. All new water & sewer piping. Two hose bibs. All work doneas per code. Expiration date: June 7, 2016 | Permit id: Com2015-29215 | |||||
Install 2 ton heatpump w/ all ductwork as per code. Expiration date: August 1, 2016 | Permit id: Com2016-02256 | |||||
Fire sprinkler rough-in 13d as per plans as per code. Expiration date: August 22, 2016 | Permit id: Com2015-26066 | |||||
Install 2 amp main breaker panel (underground) circuits 28 lights and 4 low voltage as per code. Expiration date: July 5, 2016 | Permit id: Com2016-00200 | |||||
Use as a single family dwelling Permit id: Use2016-01572 | |||||
To construct new 3-story single family dwelling with front loading garage and a roof top deck per bmza2014-583 approved 5 4 2015 w condition as per plans as per code. Separate permit is required for mep and sprinkler system. Required sealed and signed stamped signature ready set in order to pick up permit Expiration date: September 23, 2016 | Permit id: Com2015-11230 | |||||
Plumbing for new 3 1 2 baths kitchen sink dishwasher garbage disposal washing machine hook-ups and electric water heater. All new water & sewer piping. Two hose bibs. All work doneas per code. Expiration date: June 7, 2016 | Permit id: Com2015-29215 | |||||
Install 2 ton heatpump w all ductwork as per code. Expiration date: August 1, 2016 | Permit id: Com2016-02256 | |||||
Install (11) # low voltage as per code. Expiration date: April 9, 2018 | Permit id: Com2017-63897 |