| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F3/ bridge level, remodel entry lobby, flooring, raise ceiling in one room, glass wall, new soffit, ceiling, entry hardware, elec, paint, patch, Permit type: Reviews | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-150573-000 | |||||
Pwr - bridge level, remodel entry lobby, flooring, raise ceiling in one room, glass wall, new soffit, ceiling, entry hardware, elec, - pwr Permit type: Intake | Permit status: Closed | Completion date: April 28, 2015 | Permit id: 2015-160485-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Application | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Issuance/intake | Permit status: Intake | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Addressing | Permit status: Not reqd | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Erosion control | Permit status: Not reqd | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Life safety | Permit status: Not reqd | Completion date: June 5, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Life safety | Permit status: Not reqd | Completion date: May 12, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Structural | Permit status: Required | Completion date: June 4, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Fire bureau | Permit status: Approved | Completion date: June 4, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Environmental services | Permit status: Not reqd | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Transportation | Permit status: Not reqd | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Water bureau review | Permit status: Not reqd | Completion date: May 12, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 4, 2015 | Permit id: 2015-166688-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Parks bureau | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2015-166688-000 | |||||
F16/ wtc3 5th floor scc upgrade, remove several interior walls, remodel platform to include enlarging the area and adding railing, several offices, remodel ceiling & finishes Permit type: Reviews | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172460-000 | |||||
F21/ revision to reflect existing conditions, ramp, stair infill, wall alignment Permit type: Intake | Permit status: Closed | Completion date: June 9, 2015 | Permit id: 2015-172462-Rev | |||||
F26/ 6th floor, pge; generator upgrade replacement within l-6 generator room with fuel tanks located in p-1 basement and secondary fuel tanks located on l-6 within screening area Permit type: Reviews | Permit status: Approved | Completion date: May 20, 2015 | Permit id: 2015-173313-000 | |||||
F26/ 6th floor, pge; generator upgrade replacement within l-6 generator room with fuel tanks located in p-1 basement and secondary fuel tanks located on l-6 within screening area Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173340-000 | |||||
F26/ 6th floor, pge; generator upgrade replacement within l-6 generator room with fuel tanks located in p-1 basement and secondary fuel tanks located on l-6 within screening area Permit type: Environmental services | Permit status: Approved | Completion date: May 27, 2015 | Permit id: 2015-173340-000 | |||||
F26/ hvac related work for generator replacement Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173346-000 | |||||
Pwr - wtc3 5th floor scc upgrade control room ti - pwr Permit type: Intake | Permit status: Closed | Completion date: June 8, 2015 | Permit id: 2015-182514-000 | |||||
B2/ hvac tenant improvements Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188936-000 | |||||
B2/ hvac ti/ vav box replacement Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188963-000 | |||||
Voice/data - wtc3 5th floor scc upgrade - voice/data Permit type: Intake | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-193684-000 | |||||
Wtc3 5th floor-alarm, air sampling modification Permit type: Intake | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-193763-000 | |||||
Hvac - wtc3 5th floor scc upgrade control room ti - hvac Permit type: Intake | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-196034-000 | |||||
Adding 1 new smoke and 2 new strobes for the pge control room and new offices. Permit type: Intake | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-196169-000 | |||||
Change 15 pendents to uprights for security entrance at bridge level. Permit type: Intake | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-196178-000 | |||||
Ew-pwr -:ups 3021351:wtc 3:world tradepr#201843 Permit type: Intake | Permit status: Closed | Completion date: November 22, 2010 | Permit id: 2010-195071-000 | |||||
Design review approval of installation of a wireless communications facility in the central city/downtown design district with antennas and associated equipment behind a shroud. The shroud is an extension of the existing penthouse on top of the building measuring 26 feet, 6 inches to the east and 12 feet to the west. The proposal is per the approved site plans, exhibits c. 1 through c. 13, signed and dated december 4, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related conditions (b through d) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 13-2120 dz. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. No field changes allowed. B. Order the striations/lines in the frp panels to m Permit type: Land use review | Permit status: Completed | Completion date: October 10, 2013 | Permit id: 2013-212050-000 | |||||
Ew-lv cable:lv cable 3382744:wtc 3:world tradepr#pge/wtc3 cabling Permit type: Intake | Permit status: Closed | Completion date: October 29, 2013 | Permit id: 2013-222390-000 | |||||
B1/ wtc 3 plaza level minor floor revisions - demo lab, conf room and office walls, and infill ceiling as reqd Permit type: Intake | Permit status: Closed | Completion date: November 21, 2013 | Permit id: 2013-231118-000 | |||||
F1/ comm room 4th flr, remove portion of wall, add three walls to enlarge room, elec, paint, finish. Permit type: Intake | Permit status: Closed | Completion date: March 19, 2014 | Permit id: 2014-128912-000 | |||||
Pwr - 4th fl comm room, remove portion of wall, add three walls to enlarge room, elec, - pwr & hvac controls (hvac controls added 6-5-14) Permit type: Intake | Permit status: Closed | Completion date: April 9, 2014 | Permit id: 2014-138212-000 | |||||
5k, 1k, tot trot Permit type: Intake | Permit status: Complete | Completion date: April 10, 2014 | Permit id: 2014-138982-000 | |||||
F9/ 4th floor partial interior demo Permit type: Intake | Permit status: Closed | Completion date: April 16, 2014 | Permit id: 2014-142549-000 | |||||
Plumbing renovation at #wtc 4th floordemo 2 sinks Permit type: Intake | Permit status: Closed | Completion date: April 17, 2014 | Permit id: 2014-143102-000 | |||||
Voice / data - comm room, remove portion of wall, add three walls to enlarge room, elec, voice data: cable tray installed, some racking, Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-156131-000 | |||||
Add/ relocate heads as needed for tenant improvement relocate 2 branchlines---3 sets of plans Permit type: Intake | Permit status: Closed | Completion date: May 21, 2014 | Permit id: 2014-159528-000 | |||||
F2/ 4th floor ti; new clerestory walls, new glass walls, operable wall, doors, relites for new offices, conference rooms, training, breakroom, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: May 22, 2014 | Permit id: 2014-160399-000 | |||||
Power, fire alarm- 4th floor ti; new clerestory walls, new glass walls, operable wall, doors, relites for new offices, conference rooms, training, breakroom, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: May 29, 2014 | Permit id: 2014-162829-000 | |||||
Voice/data - issue christenson - voice/data Permit type: Intake | Permit status: Closed | Completion date: May 29, 2014 | Permit id: 2014-162868-000 | |||||
Hvac - 4th floor ti; new clerestory walls, new glass walls, operable wall, doors, relites for new offices, conference rooms, training, breakroom, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: May 29, 2014 | Permit id: 2014-162871-000 | |||||
B2/ 4th floor hvac modifications; add 7 cooling only vav boxes, associated duct work Permit type: Intake | Permit status: Closed | Completion date: June 5, 2014 | Permit id: 2014-165770-000 | |||||
Plumbing renovation at 3wtc 4th floorbreakroom sink Permit type: Intake | Permit status: Closed | Completion date: June 10, 2014 | Permit id: 2014-167259-000 | |||||
Wtc 3 - pr # 35143 - ciricuits to replace escalator Permit type: Reviews | Permit status: Approved | Completion date: August 26, 2014 | Permit id: 2014-204249-000 | |||||
Circuits to reconnect power for escalator Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2014-204254-000 | |||||
B2/ 3rd floor, remove wall, infill door, expand size of video conference room, ceiling, elec Permit type: Reviews | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-214790-000 | |||||
B2/ 3rd floor, remove wall, infill door to expand size of video conference room, ceiling, elec Permit type: Intake | Permit status: Closed | Completion date: September 18, 2014 | Permit id: 2014-214795-000 | |||||
B2/ new glass security doors, relites, wall build out for new doors, paint, patch carpet, elec Permit type: Reviews | Permit status: Approved | Completion date: September 29, 2014 | Permit id: 2014-218754-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Request | Permit status: Closed | Completion date: October 15, 2014 | Permit id: 2014-219362-000 | |||||
Pwr - new glass security doors, relites, wall build out for new doors, paint, patch carpet, elec - pwr Permit type: Intake | Permit status: Closed | Completion date: October 10, 2014 | Permit id: 2014-224265-000 | |||||
3rd floor, remove wall, infill door to expand size of video conference room, ceiling, elec Permit type: Intake | Permit status: Closed | Completion date: October 11, 2014 | Permit id: 2014-224359-000 | |||||
Intake Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227153-000 | |||||
Design review approval of exterior alterations to a building in the central city plan district to allow replacement of one existing panel antenna on the north faade of the building with a new, larger panel antenna, measuring 68. 7 inches tall by 22. 2 inches wide by 5 inches deep, with associated equipment mounted behind the parapet, per the approved site plans, exhibits c. 1 through c. 4, and c. Through c. 11, signed and dated february 24, 2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition b must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 14-230997 dz. No field changes allowed. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. All antennas must be painted to match th Permit type: Land use review | Permit status: Completed | Completion date: October 30, 2014 | Permit id: 2014-230997-000 | |||||
B2/ bridge level/ add two meeting/ huddle rooms Permit type: Reviews | Permit status: Approved | Completion date: October 30, 2014 | Permit id: 2014-232175-000 | |||||
B2/ bridge level/ hvac for 2 new conference/ huddle rooms Permit type: Intake | Permit status: Closed | Completion date: October 30, 2014 | Permit id: 2014-232199-000 | |||||
Pwr - bridge level/ add two meeting/ huddle rooms pwr Permit type: Intake | Permit status: Closed | Completion date: November 3, 2014 | Permit id: 2014-233608-000 | |||||
Move existing smokes from drop ceiling up to concrete ceiling in bridge lobby of 3wtc. Permit type: Intake | Permit status: Closed | Completion date: August 11, 2015 | Permit id: 2015-216149-000 | |||||
Remove and replace 3 antennas; remove and replace surge protection units on existing rooftop wireless facility Permit type: Application | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-243746-000 | |||||
Replace 3 existing antennas (1 per sector) Permit type: Application | Permit status: Approved | Completion date: October 7, 2015 | Permit id: 2015-247613-000 | |||||
B1/br level-restroom access from lobby: relocate door, infill opening and install hard lid. Permit type: Reviews | Permit status: Approved | Completion date: December 7, 2015 | Permit id: 2015-274020-000 | |||||
Replace a 5 gallon deisel tank with new ul142 tank and welded steel piping. Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-274979-000 | |||||
Replace a 5 gallon deisel tank with new ul142 tank and welded steel piping. Permit type: Fire bureau | Permit status: Closed | Completion date: December 16, 2015 | Permit id: 2015-274979-000 | |||||
Pwr - br level-restroom access from lobby: - pwr Permit type: Intake | Permit status: Closed | Completion date: December 15, 2015 | Permit id: 2015-277196-000 | |||||
Add sprinkler drops for new drop ceiling. Permit type: Intake | Permit status: Closed | Completion date: January 29, 2016 | Permit id: 2016-113375-000 | |||||
B2/ plaza level - add 3 offices, lighting, sprinklers, mechanical, finishes Permit type: Reviews | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123530-000 | |||||
Add, plug, and relocate sprinkler heads as needed to accommodate tenant improvement. Permit type: Intake | Permit status: Closed | Completion date: February 26, 2016 | Permit id: 2016-127496-000 | |||||
Replace existing detectors and strobes with new. Also tying in 4 generators with facp. Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-130342-000 | |||||
Adding sprinkler coverage into exhaust ducting and under manifolds in generator room. Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-131011-000 | |||||
Pwr - plaza level - add 3 offices, lighting, sprinklers, mechanical, finishes - pwr Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131600-000 | |||||
B2/ bridge; add walls, doors for several huddle rooms Permit type: Reviews | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136974-000 | |||||
Pwr - bridge; add walls, doors for several huddle rooms - pwr Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-138215-000 | |||||
B2/ br-m&d center, add conference room, glass wall, dirtt wall, door, ceiling, elec Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139923-000 | |||||
Sprinkler - add/relocate ssp sprinklers to accommodate ti changes Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140017-000 | |||||
Sprinkler - add sprinkler outside of room to maintain spacing. Switch existing sr sprinklers to new qr sprinklers Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140023-000 | |||||
Pwr - elec, / br-m&d center, add conference room, - pwr Permit type: Intake | Permit status: Closed | Completion date: March 30, 2016 | Permit id: 2016-142710-000 | |||||
2 amp feeder and (8) branch circuits. For new cellular radio equipment. Permit type: Intake | Permit status: Closed | Completion date: April 1, 2016 | Permit id: 2016-144098-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Request | Permit status: Closed | Completion date: October 15, 2014 | Permit id: 2014-219362-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Under inspection | Permit status: Violations corrected | Completion date: April 18, 2016 | Permit id: 2014-219362-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Enforcement | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2014-219362-000 | |||||
Pwr - bridge level, remodel entry lobby, flooring, raise ceiling in one room, glass wall, new soffit, ceiling, entry hardware, elec, - pwr Permit type: Intake | Permit status: Closed | Completion date: April 28, 2015 | Permit id: 2015-160485-000 | |||||
New verizon rooftop wireless communications facility to include (20) new antennas and equipment cabinets mounted behind new screen wall to resemble extension of existing rooftop penthouse Permit type: Application | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-166688-000 | |||||
Issued bin 3 f26/ 6th floor, pge; generator upgradereplacement; work spread over 3 levels, (l6) hvac openings, (p1) infill cmu openings, generator (steel) pads, rooftop hvac penetrations, temporary street location for generators, elec no exterior work allowed on this permit Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173340-000 | |||||
F1/ dfs for trapeze support and anchorage Permit type: Intake | Permit status: Closed | Completion date: July 13, 2015 | Permit id: 2015-173340-Dfs | |||||
F29/ revision for exterior work related to; 6th floor, pge; generator upgrade replacement; work spread over 3 levels, (l6) hvac openings, (p1) infill cmu openings, generator (steel) pads, rooftop hvac penetrations, etc. Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-173340-Rev | |||||
F26/ hvac related work for generator replacement Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173346-000 | |||||
F29/ hvac revision for exterior, roof top fans, penetrations, machinery, penthouse Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-173346-Rev | |||||
Add and relocate heads as needed for new offices in the secure map room. Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198379-000 | |||||
Move heads up to ceiling while under construction, and cut in new heads for drop ceiling for generator room. Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198403-000 | |||||
Add & relocate sprinkler heads for 3rd floor security lobby remodel. Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198435-000 | |||||
Removal and replacement of two existing emergency generators. Also two additional generators to be installed. The addition of the four new fans will be the only exterior modification for this project. The new fan assemblies will be shorter in height than the existing exhaust discharges. Permit type: Land use review | Permit status: Completed | Completion date: July 22, 2015 | Permit id: 2015-203279-000 | |||||
B1 br level-restroom access from lobby: relocate door, infill opening and install hard lid. Permit type: Reviews | Permit status: Approved | Completion date: December 7, 2015 | Permit id: 2015-274020-000 | |||||
Replace a 5 gallon deisel tank with new ul142 tank and welded steel piping. Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-274979-000 | |||||
Replace a 5 gallon deisel tank with new ul142 tank and welded steel piping. Permit type: Fire bureau | Permit status: Closed | Completion date: December 16, 2015 | Permit id: 2015-274979-000 | |||||
B2 plaza level - add 3 offices, lighting, sprinklers, mechanical, finishes Permit type: Reviews | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123530-000 | |||||
Replace existing detectors and strobes with new. Also tying in 4 generators with facp. Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-130342-000 | |||||
B2 bridge; add walls, doors for several huddle rooms Permit type: Reviews | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136974-000 | |||||
Pwr - bridge; add walls, doors for several huddle rooms - pwr Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-138215-000 | |||||
B2 br-m&d center, add conference room, glass wall, dirtt wall, door, ceiling, elec Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139923-000 | |||||
Sprinkler - add relocate ssp sprinklers to accommodate ti changes Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140017-000 | |||||
Pwr - elec, br-m&d center, add conference room, - pwr Permit type: Intake | Permit status: Closed | Completion date: March 30, 2016 | Permit id: 2016-142710-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Request | Permit status: Closed | Completion date: October 15, 2014 | Permit id: 2014-219362-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Under inspection | Permit status: Violations corrected | Completion date: April 18, 2016 | Permit id: 2014-219362-000 | |||||
Complaint received - antennas put in place prior to review completion - new antenna on the upper roof of the building that was not approved. See trackit for addl info and photos Permit type: Enforcement | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2014-219362-000 | |||||
F3 bridge level, remodel entry lobby, flooring, raise ceiling in one room, glass wall, new soffit, ceiling, entry hardware, elec, paint, patch, Permit type: Reviews | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-150573-000 | |||||
F16 wtc3 5th floor scc upgrade, remove several interior walls, remodel platform to include enlarging the area and adding railing, several offices, remodel ceiling & finishes Permit type: Reviews | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172460-000 | |||||
F21 revision to reflect existing conditions, ramp, stair infill, wall alignment Permit type: Intake | Permit status: Closed | Completion date: June 9, 2015 | Permit id: 2015-172462-Rev | |||||
F26 6th floor, pge; generator upgrade replacement within l-6 generator room with fuel tanks located in p-1 basement and secondary fuel tanks located on l-6 within screening area Permit type: Reviews | Permit status: Approved | Completion date: May 20, 2015 | Permit id: 2015-173313-000 | |||||
Issued bin 3 f26 6th floor, pge; generator upgradereplacement; work spread over 3 levels, (l6) hvac openings, (p1) infill cmu openings, generator (steel) pads, rooftop hvac penetrations, temporary street location for generators, elec no exterior work allowed on this permit Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173340-000 | |||||
F1 dfs for trapeze support and anchorage Permit type: Intake | Permit status: Closed | Completion date: July 13, 2015 | Permit id: 2015-173340-Dfs | |||||
F29 revision for exterior work related to; 6th floor, pge; generator upgrade replacement; work spread over 3 levels, (l6) hvac openings, (p1) infill cmu openings, generator (steel) pads, rooftop hvac penetrations, etc. Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-173340-Rev | |||||
F26 hvac related work for generator replacement Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173346-000 | |||||
F29 hvac revision for exterior, roof top fans, penetrations, machinery, penthouse Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-173346-Rev | |||||
B2 hvac tenant improvements Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188936-000 | |||||
B2 hvac ti vav box replacement Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188963-000 | |||||
Voice data - wtc3 5th floor scc upgrade - voice data Permit type: Intake | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-193684-000 | |||||
Replace three existing antennas with larger ones for 4g on rooftop - no building penetrations, attach to existing compression mount system. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 13, 2012 | Current use: Utility | Permit id: 2011-172462-000 | |||||
Add 3 antennas: 1 on west parapet, 1 on south parapet, and 1 on north penthouse Client: Neighbors West Northwest | Permit type: Addition | Permit status: Issued | Current use: Utility | Permit id: 2016-262764-000 | |||||
Remove (3) antennas and add (6) antennas; remove (3) rrhs remote radio heads and add (6) rrhs; install (1) battery rack with (5) strings of batteries in equipment room Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: October 20, 2016 | Current use: Utility | Permit id: 2016-182496-000 |