| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Limited energy for security system Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-236748-000 | |||||
Sprinkler-tenant improvement. Tenant space to be converted back to shell space for future tenant leasing Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-237048-000 | |||||
1st floor east- restrooms- alterations to the fire alarm system as needed for t. I.- 5 devices total 2- strobes2- h/s1-fsd Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-239040-000 | |||||
Installation of radio enhancement system (das) for 700/8 mhz Permit type: Intake | Permit status: Closed | Completion date: December 2, 2014 | Permit id: 2014-244333-000 | |||||
F2/1st floor, intercall ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes Permit type: Reviews | Permit status: Approved | Completion date: December 8, 2014 | Permit id: 2014-246655-000 | |||||
Interior only; f2/ 1st floor, ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes Permit type: Intake | Permit status: Closed | Completion date: December 8, 2014 | Permit id: 2014-246729-000 | |||||
Sprinkler - sprinkler ti for tenant space being converted back to shell space condition for future leasing/tenant Permit type: Intake | Permit status: Closed | Completion date: December 11, 2014 | Permit id: 2014-248585-000 | |||||
Power - 1st floor, intercall ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes (for added mini split) Permit type: Intake | Permit status: Closed | Completion date: December 15, 2014 | Permit id: 2014-249613-000 | |||||
Power - 1st floor, intercall ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes Permit type: Intake | Permit status: Closed | Completion date: December 23, 2014 | Permit id: 2014-252952-000 | |||||
F14/ 1st floor vacant space - new suspended ceiling, structural soffits and light fixtures Permit type: Reviews | Permit status: Approved | Completion date: December 30, 2014 | Permit id: 2014-254964-000 | |||||
F14/ 1st floor vacant space - new suspended ceiling, structural soffits and light fixtures Permit type: Intake | Permit status: Closed | Completion date: December 30, 2014 | Permit id: 2014-254972-000 | |||||
3rd floor east- alterations to the fire sprinklers as needed for t. I. And change all standard response to qr- 21 heads total Permit type: Intake | Permit status: Closed | Completion date: December 30, 2014 | Permit id: 2014-255057-000 | |||||
F12/ agile/ dry cooler on roof for indoor cooling unit Permit type: Intake | Permit status: Closed | Completion date: January 12, 2015 | Permit id: 2015-103764-000 | |||||
Power - 1st floor vacant space - new suspended ceiling, structural soffits and light fixtures Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104306-000 | |||||
Street tree removal /replant permit Permit type: A - research | Permit status: Title 11 permit with cond | Completion date: January 22, 2015 | Permit id: 2015-106578-000 | |||||
Sprinkler - add & relocate sprinklers to accommodate new walls for 1st floor vacant spaces Permit type: Intake | Permit status: Closed | Completion date: January 20, 2015 | Permit id: 2015-107483-000 | |||||
Plumbing renovations to suite 125, adp plaza Permit type: Intake | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2015-107773-000 | |||||
Power to complete scope - 1st floor west, ti; glass wall panels for conference room, new glass door and relite for reception area, flooring, ceiling,elec, finishes Permit type: Intake | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2015-107856-000 | |||||
Suite #125- add & relocate sprinklers to accommodate new walls- 21 heads total Permit type: Intake | Permit status: Closed | Completion date: January 21, 2015 | Permit id: 2015-108004-000 | |||||
Voice/data - 1st floor, ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes - cat 6 horizontal infrastructure Permit type: Intake | Permit status: Closed | Completion date: January 23, 2015 | Permit id: 2015-109259-000 | |||||
B2/ remove and replace ductwork and grilles, one new watersource heat pump Permit type: Intake | Permit status: Closed | Completion date: January 26, 2015 | Permit id: 2015-110666-000 | |||||
B2/ add new ductwork and grilles to existing equipment Permit type: Intake | Permit status: Closed | Completion date: January 27, 2015 | Permit id: 2015-110969-000 | |||||
Hvac stat - 1st floor, ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes Permit type: Intake | Permit status: Closed | Completion date: January 27, 2015 | Permit id: 2015-111089-000 | |||||
Hvac stat - 1st floor vacant space - new suspended ceiling, structural soffits and light fixtures Permit type: Intake | Permit status: Closed | Completion date: January 27, 2015 | Permit id: 2015-111110-000 | |||||
Plumbing renovation at adp plaza for loading ramp drainage Permit type: Intake | Permit status: Closed | Completion date: February 4, 2015 | Permit id: 2015-114702-000 | |||||
Fire alarm - interior only; f2/ 1st floor, ti suite 125; remove wall, create large conference room/breakroom, infill doors in public corridor, add doors, relites for multiple offices, open office, ceiling, elec, finishes Permit type: Intake | Permit status: Closed | Completion date: February 5, 2015 | Permit id: 2015-115470-000 | |||||
Suite #125- alterations to the fire alarm system as needed for t. I.- 4 devices total2- strobes2- h/s Permit type: Intake | Permit status: Closed | Completion date: February 10, 2015 | Permit id: 2015-117349-000 | |||||
3rd floor-east- alterations to the fire sprinklers as needed for t. I.- 162 heads total this work includes change of all heads in this space to qr- Permit type: Intake | Permit status: Closed | Completion date: February 19, 2015 | Permit id: 2015-121721-000 | |||||
Pull wire for access control and low voltage alarm Permit type: Electrical inspections | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2015-127618-000 | |||||
B1/intercall, add mitsubishi split to telco closet for intercall Permit type: Intake | Permit status: Closed | Completion date: March 9, 2015 | Permit id: 2015-130401-000 | |||||
Audio visual - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc no exterior work allowed as part of this permit Permit type: Intake | Permit status: Closed | Completion date: March 31, 2015 | Permit id: 2015-142414-000 | |||||
F3/ suites 1 & 105; new glass entry doors Permit type: Reviews | Permit status: Approved | Completion date: April 22, 2015 | Permit id: 2015-155336-000 | |||||
F2/ suite 120, remove wall open up space for new office, glass wall, entry door, walls, doors for two offices, ceiling, carpet, elec Permit type: Reviews | Permit status: Approved | Completion date: April 23, 2015 | Permit id: 2015-155589-000 | |||||
F12/ suite 120, rev-01 add 2 offices and a break room Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-155592-Rev | |||||
Install sound masking and av systems on 4th floor west Permit type: Intake | Permit status: Closed | Completion date: April 28, 2015 | Permit id: 2015-160270-000 | |||||
Power, fire alarm - suite 1 cdk, remove wall open up space for new office, glass wall, entry door, walls, doors for two offices, ceiling, carpet, elec Permit type: Intake | Permit status: Closed | Completion date: April 29, 2015 | Permit id: 2015-161711-000 | |||||
B1/ suite 120, remove and relocate ductwork and grilles to existing equipment Permit type: Intake | Permit status: Closed | Completion date: May 11, 2015 | Permit id: 2015-168482-000 | |||||
Suite #120- alterations to the fire alarm as needed for t. I.- 3 devices total Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169653-000 | |||||
Suite #120- alterations to the fire sprinklers as needed for t. I.- 6 heads total Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169659-000 | |||||
1st floor entry remodels- alterations to the fire sprinklers as needed for t. I.- 29 heads total Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169664-000 | |||||
3rd and 4th floor west- alteration to the fire sprinklers as needed for t. I.- 377 head change to qr Permit type: Intake | Permit status: Closed | Completion date: May 13, 2015 | Permit id: 2015-170380-000 | |||||
B1/ first floor vacant area; relocate wshp and add ductwork and grilles Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173573-000 | |||||
Hvac controls - first floor vacant area; relocate wshp and add ductwork and grilles Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173679-000 | |||||
Power - suites 1 & 105; new glass entry doors - linear lighting, open ceiling Permit type: Intake | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-175615-000 | |||||
Add sink,tankless water heater Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-187109-000 | |||||
Power - suite 120, rev-01 add 2 offices and a break room Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191154-000 | |||||
Plumbing renovation at adp plaza suite 120breakroom sink Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191200-000 | |||||
Ew-fiber optic 450-:fiber optic 3078961:adp plaza:cb richellispr#fiber optic lab 450 Permit type: Intake | Permit status: Closed | Completion date: June 8, 2011 | Permit id: 2011-146662-000 | |||||
F8/ 2nd floor evision ti Permit type: Intake | Permit status: Closed | Completion date: May 30, 2012 | Permit id: 2012-145508-000 | |||||
Low voltage cctv upgrade Permit type: Electrical inspections | Permit status: Approved | Completion date: September 6, 2013 | Permit id: 2013-177576-000 | |||||
Zoning permit to show compliance with title 33 development standards listed under 33. 258. 070. 2. D(2) at site to complete option #2 for nonconforming upgrades agreement recorded under 2010-198371 pr; this permit will be installing long-term and short-term bicycle parking; installing landscaping for interior and perimeter landscape areas; screening for garbage/recycling areas. Permit type: Intake | Permit status: Not reqd | Completion date: October 8, 2013 | Permit id: 2013-214266-000 | |||||
Install smoke detection in electrial closets. 3 devices total Permit type: Intake | Permit status: Closed | Completion date: November 13, 2013 | Permit id: 2013-227176-000 | |||||
F9/ 1st floor west, ti; glass wall panels for conference room, new glass door and relite for reception area, flooring, ceiling,elec, finishes Permit type: Intake | Permit status: Closed | Completion date: February 25, 2014 | Permit id: 2014-120424-000 | |||||
Power - 1st floor west, ti; glass wall panels for conference room, new glass door and relite for reception area, flooring, ceiling,elec, finishes Permit type: Intake | Permit status: Closed | Completion date: February 27, 2014 | Permit id: 2014-121315-000 | |||||
B1/ 1st floor west - add 6 new wshps Permit type: Intake | Permit status: Closed | Completion date: March 17, 2014 | Permit id: 2014-127515-000 | |||||
Suite 1 west- add, remove and relocate fire sprinkler heads for t. I.- 103 heads total Permit type: Intake | Permit status: Closed | Completion date: March 18, 2014 | Permit id: 2014-128220-000 | |||||
F6/ parking level bike enclosure/storage, first floor locker room expansion and exterior entance ramp Permit type: Intake | Permit status: Closed | Completion date: March 26, 2014 | Permit id: 2014-131550-000 | |||||
Hvac - 1st floor west, ti; glass wall panels for conference room, new glass door and relite for reception area, flooring, ceiling,elec, finishes Permit type: Intake | Permit status: Closed | Completion date: March 27, 2014 | Permit id: 2014-131718-000 | |||||
Power, fire alarm - parking level bike enclosure/storage, first floor locker room expansion and exterior entance ramp Permit type: Intake | Permit status: Closed | Completion date: April 14, 2014 | Permit id: 2014-139980-000 | |||||
Street tree planting permit Permit type: D - permit request | Permit status: Permit issued | Completion date: July 24, 2014 | Permit id: 2014-178002-000 | |||||
Street tree pruning permit Permit type: D - permit request | Permit status: Permit issued | Completion date: July 24, 2014 | Permit id: 2014-178006-000 | |||||
Plumbing renovations to the adp building locker room entry ramp ti Permit type: Intake | Permit status: Closed | Completion date: September 2, 2014 | Permit id: 2014-206491-000 | |||||
F12/ adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Reviews | Permit status: Approved | Completion date: September 12, 2014 | Permit id: 2014-212200-000 | |||||
F12/ adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc no exterior work allowed as part of this permit Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212204-000 | |||||
F12/ adp portland - agile remodel, new air distribution for 3 & 4th floors, wshp for cooling in idf room- only interior work Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212216-000 | |||||
Power, fire alarm - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Intake | Permit status: Closed | Completion date: September 22, 2014 | Permit id: 2014-215924-000 | |||||
1st floor bike room and locker room t. I.-fire sprinkler - tenant improvement; new 1st floor locker rooms; 9 sprinklers relocated; 1 sprinkler added; 2 additional upright sprinklers added in two areas opened to structurereceived: 3 sets of cut sheets; 3 sets of plans Permit type: Intake | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-216524-000 | |||||
Hvac stats - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-216941-000 | |||||
Plumbing renovation at adp plaza for agile remodel 3rd and 4th floordemo 5 sinks and install 9 sinks, add ada wc, lav Permit type: Intake | Permit status: Closed | Completion date: September 26, 2014 | Permit id: 2014-218322-000 | |||||
Hvac controls - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Intake | Permit status: Closed | Completion date: September 27, 2014 | Permit id: 2014-218543-000 | |||||
Install a/v systems in new offices Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-219801-000 | |||||
Re-route gas line Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-219889-000 | |||||
F6/ parking level bike enclosure/storage - exhaust for locker rooms, duct for supply and return of existing units Permit type: Intake | Permit status: Closed | Completion date: October 7, 2014 | Permit id: 2014-222580-000 | |||||
Voice/data - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225231-000 | |||||
4th floor- east tower- replace all heads to qr - relocate as needed for t. I. - 195 heads total Permit type: Intake | Permit status: Closed | Completion date: October 31, 2014 | Permit id: 2014-232731-000 | |||||
3rd and 4th floors- alterations to the fire alarm system as needed for t. I.- 163 devices total 113- smoke detectors9- strobes37- h/s4- aux panels Permit type: Intake | Permit status: Closed | Completion date: October 31, 2014 | Permit id: 2014-232748-000 | |||||
F22/ suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Reviews | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-242611-000 | |||||
Cdk plaza, suite 115 t. I. To include: 1- wc, 1- lav, 2- break sinks, 1- dw, 1- gd, 1- water cooler Permit type: Intake | Permit status: Closed | Completion date: October 2, 2015 | Permit id: 2015-245334-000 | |||||
Power, fire alarm - suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248653-000 | |||||
Suite #115- add, delete & relocate sprinklers for new tenant- 57 heads total Permit type: Intake | Permit status: Closed | Completion date: October 14, 2015 | Permit id: 2015-250849-000 | |||||
F2/t. I. For vacant suite 105 - to include open offices, reception, conference. Storage and breakroom, casework, glass wall partitions, ceilings, plbg, elec Permit type: Reviews | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2015-251596-000 | |||||
Adp plaza , suite 105. New break sink and dishwasher, wh, hub drain, refer Permit type: Intake | Permit status: Closed | Completion date: October 22, 2015 | Permit id: 2015-255047-000 | |||||
Suite 115; ti-install new ada synchronized notification devices in suite 115 per plans Permit type: Intake | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-255389-000 | |||||
Security - suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-262780-000 | |||||
Power - t. I. For vacant suite 105 - to include open offices, reception, conference. Storage and breakroom, casework, glass wall partitions, ceilings, plbg, elec Permit type: Intake | Permit status: Closed | Completion date: November 14, 2015 | Permit id: 2015-265011-000 | |||||
F2/ upgrade both lobbies and corridor on the first floor, new flooring, suspended ceiling, finishes Permit type: Reviews | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2015-267404-000 | |||||
Voice/data - suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: November 20, 2015 | Permit id: 2015-267618-000 | |||||
B2/ ductwork and grilles Permit type: Intake | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-268863-000 | |||||
Hvac stats - suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-268924-000 | |||||
Power - upgrade both lobbies and corridor on the first floor, new flooring, suspended ceiling, finishes Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269359-000 | |||||
B2/ remove/relocate ductwork, grilles for new layout Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269520-000 | |||||
B2/ remove and relocate diffusers Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269677-000 | |||||
Hvac stat - t. I. For vacant suite 105 - to include open offices, reception, conference. Storage and breakroom, casework, glass wall partitions, ceilings, plbg, elec Permit type: Intake | Permit status: Closed | Completion date: November 25, 2015 | Permit id: 2015-269895-000 | |||||
Suite #105-add, delete & relocate sprinklers for new tenant. 12 heads total Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-270431-000 | |||||
Lobbies-relocate existing sprinklers modified ceiling- 26 heads total Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-270433-000 | |||||
F10/ suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry/exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2016 | Permit id: 2016-125845-000 | |||||
F10/ suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry/exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-125850-000 | |||||
F2/ ada restroom, 2nd floor, public space, finishes for corridor Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2016 | Permit id: 2016-126086-000 | |||||
F2/ ada restroom, 2nd floor, public space, finishes for corridor Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-126091-000 | |||||
Replacment of existing sign (already removed) new sign approximately sq ft Permit type: Land use review | Permit status: Completed | Completion date: March 24, 2016 | Permit id: 2016-138849-000 | |||||
Power - ada restroom, 2nd floor, public space, finishes for corridor Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139658-000 | |||||
Plumbing at cdk plaza for ada restroom1-wc, 1-lav Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140038-000 | |||||
Plumbing renovation at cdk plaza 2nd floor for zones inc ti4-sinks, 4-wh, 4- hub drains w/primers, 4-hwd, 3-filter systems w/cw tap, 5-coffee, 5. Cw for refers, 1. Cw icemaker Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140096-000 | |||||
F22/ 2nd floor, ti, new glass doors, conference room, glass wall relite at breakroom, open office, entry, ceiling, elec, plbg Permit type: Reviews | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2016-141343-000 | |||||
F22/ 2nd floor, ti, new glass doors, conference room, glass wall relite at breakroom, open office, entry, ceiling, elec, plbg Permit type: Intake | Permit status: Closed | Completion date: March 28, 2016 | Permit id: 2016-141355-000 | |||||
Plumbing renovation at cdk plaza suite 225 for rise medical staffing1-breakroom sink, 1-elec water heater, 1-hub drain w/primer, 1-dishwasher1-hot water dispenser, 1-filter system w/tap, 1-cw for coffee & expresso, 1-cw for refer Permit type: Intake | Permit status: Closed | Completion date: April 1, 2016 | Permit id: 2016-144079-000 | |||||
Power, fire alarm - 2nd floor, ti, new glass doors, conference room, glass wall relite at breakroom, open office, entry, ceiling, elec, plbg Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144372-000 | |||||
Power, fire alarm - suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry/exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146832-000 | |||||
F23/ edgelink/ ste 1 - new demising and partition walls for reception, open and private offices, breakroom and conference rooms, ceiling, electrical, lighting, plumbing, fixtures and finishes Permit type: Reviews | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155509-000 | |||||
F23/ edgelink/ ste 1 - new demising and partition walls for reception, open and private offices, breakroom and conference rooms, ceiling, electrical, lighting, plumbing, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155519-000 | |||||
Suite 200-install new ada synchronized notification devices in suite 2 as per plans Permit type: Intake | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2016-157667-000 | |||||
F2/ adp portland rev 01 - reduction of project scope including deletion of proposed 4th floor west wing Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2014-212204-Rev | |||||
Install a/v systems in new officesfaxed Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-219801-000 | |||||
F22 suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Reviews | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-242611-000 | |||||
F2 t. I. For vacant suite 105 - to include open offices, reception, conference. Storage and breakroom, casework, glass wall partitions, ceilings, plbg, elec Permit type: Reviews | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2015-251596-000 | |||||
F2 upgrade both lobbies and corridor on the first floor, new flooring, suspended ceiling, finishes Permit type: Reviews | Permit status: Approved | Completion date: November 19, 2015 | Permit id: 2015-267404-000 | |||||
Voice data - suite 115; ti, partition walls, doors, relites for multiple offices, exam rooms, dictation rooms, conference rooms, breakroom, reception area, glass store front at reception area, remove part of a wall for hallway, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: November 20, 2015 | Permit id: 2015-267618-000 | |||||
B2 ductwork and grilles Permit type: Intake | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-268863-000 | |||||
B2 remove relocate ductwork, grilles for new layout Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269520-000 | |||||
B2 remove and relocate diffusers Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269677-000 | |||||
F10 suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2016 | Permit id: 2016-125845-000 | |||||
F10 suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-125850-000 | |||||
F2 ada restroom, 2nd floor, public space, finishes for corridor Permit type: Reviews | Permit status: Approved | Completion date: February 24, 2016 | Permit id: 2016-126086-000 | |||||
F2 ada restroom, 2nd floor, public space, finishes for corridor Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-126091-000 | |||||
Replacment of existing sign (already removed) new sign approximately sq ft Permit type: Land use review | Permit status: Completed | Completion date: March 24, 2016 | Permit id: 2016-138849-000 | |||||
Power - ada restroom, 2nd floor, public space, finishes for corridor Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139658-000 | |||||
Plumbing at cdk plaza for ada restroom1-wc, 1-lav Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140038-000 | |||||
Plumbing renovation at cdk plaza 2nd floor for zones inc ti4-sinks, 4-wh, 4- hub drains w primers, 4-hwd, 3-filter systems w cw tap, 5-coffee, 5. Cw for refers, 1. Cw icemaker Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140096-000 | |||||
F22 2nd floor, ti, new glass doors, conference room, glass wall relite at breakroom, open office, entry, ceiling, elec, plbg Permit type: Reviews | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2016-141343-000 | |||||
F22 2nd floor, ti, new glass doors, conference room, glass wall relite at breakroom, open office, entry, ceiling, elec, plbg Permit type: Intake | Permit status: Closed | Completion date: March 28, 2016 | Permit id: 2016-141355-000 | |||||
Plumbing renovation at cdk plaza suite 225 for rise medical staffing1-breakroom sink, 1-elec water heater, 1-hub drain w primer, 1-dishwasher1-hot water dispenser, 1-filter system w tap, 1-cw for coffee & expresso, 1-cw for refer Permit type: Intake | Permit status: Closed | Completion date: April 1, 2016 | Permit id: 2016-144079-000 | |||||
Power, fire alarm - suite 200; ti, demo most partitions, doors, create open office with multiple work stations, training rooms, conference rooms, breakroom, stairs, bleachers, double entry exit doors, relite transom, flooring, ceiling, elec, plbg, finishes Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146832-000 | |||||
F23 edgelink ste 1 - new demising and partition walls for reception, open and private offices, breakroom and conference rooms, ceiling, electrical, lighting, plumbing, fixtures and finishes Permit type: Reviews | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155509-000 | |||||
F23 edgelink ste 1 - new demising and partition walls for reception, open and private offices, breakroom and conference rooms, ceiling, electrical, lighting, plumbing, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155519-000 | |||||
Suite 200-install new ada synchronized notification devices in suite 2 as per plans Permit type: Intake | Permit status: Closed | Completion date: April 21, 2016 | Permit id: 2016-157667-000 | |||||
F12 adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc no exterior work allowed as part of this permit Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212204-000 | |||||
F2 adp portland rev 01 - reduction of project scope including deletion of proposed 4th floor west wing Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2014-212204-Rev | |||||
F12 adp portland - agile remodel, new air distribution for 3 & 4th floors, wshp for cooling in idf room- only interior work Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212216-000 | |||||
Install a v systems in new officesfaxed Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-219801-000 | |||||
Voice data - adp portland - agile interior demo and complete remodel of apx 80,0 sq ft on floors 3 & 4. Remodel to take place in 4 phases (2 floors and east & west wings) new walls doors relites for offices, conference rooms break rooms etc Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225231-000 | |||||
3rd and 4th floors- alterations to the fire alarm system as needed for t. I.- 163 devices total 113- smoke detectors9- strobes37- h s4- aux panels Permit type: Intake | Permit status: Closed | Completion date: October 31, 2014 | Permit id: 2014-232748-000 | |||||
Installation of radio enhancement system (das) for 700 8 mhz Permit type: Intake | Permit status: Closed | Completion date: December 2, 2014 | Permit id: 2014-244333-000 | |||||
F14 1st floor vacant space - new suspended ceiling, structural soffits and light fixtures Permit type: Intake | Permit status: Closed | Completion date: December 30, 2014 | Permit id: 2014-254972-000 | |||||
F12 agile dry cooler on roof for indoor cooling unit Permit type: Intake | Permit status: Closed | Completion date: January 12, 2015 | Permit id: 2015-103764-000 | |||||
F3 suites 1 & 105; new glass entry doors Permit type: Intake | Permit status: Closed | Completion date: April 22, 2015 | Permit id: 2015-155338-000 | |||||
F2 suite 120, remove wall open up space for new office, glass wall, entry door, walls, doors for two offices, ceiling, carpet, elec Permit type: Intake | Permit status: Closed | Completion date: April 23, 2015 | Permit id: 2015-155592-000 | |||||
F12 suite 120, rev-01 add 2 offices and a break room Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-155592-Rev | |||||
B1 suite 120, remove and relocate ductwork and grilles to existing equipment Permit type: Intake | Permit status: Closed | Completion date: May 11, 2015 | Permit id: 2015-168482-000 | |||||
B1 first floor vacant area; relocate wshp and add ductwork and grilles Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173573-000 | |||||
Ti - 4th floor int. Demo of walls, new int walls Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: February 22, 2000 | Current use: Business | Permit id: 2000-125669-000 | |||||
Alteration in existing mechanical room adding cooling tower within Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: May 6, 2004 | Current use: Business | Permit id: 2000-146643-000 | |||||
Enclose two offices in existing open office area Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: August 1, 2000 | Current use: Business | Permit id: 2000-162837-000 |