Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Renovations include removal of exterior elevator shaft in east courtyard and new single elevator added to the lobby to serve all floors. Removal of canvas canopy at east courtyard, redesign of east courtyard lobby entrance, reopening side entrance on the east and west courtyards, new handicap access ramp in west courtyard repair or replace most exterior windows, restoring window openings on the south alley that were previously bricked in removal of large rooftop cooling tower and replace with vrf units and new corridor air unit reduction in height of existing boiler stack new roofing and insulation 96 new apartment units new mep system throughout new sprinkler system renovation of old elevator new trash rooms and chute new amenity space on first floor and basement, structural additions to support new roof mechanical units repairs to existing structure and restriped parking in the rear; repair windows on north side and in courtyards. Client: Twenty-Five Twelve Assoicates | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1610743 |