Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 5, 2007 Client: Richburg Josephine | Permit status: Completed | Permit id: 113473 | |||||
Electrical permit Date: August 7, 2008 Client: Richburg Josephine | Permit status: Completed | Permit id: 169390 | |||||
Plumbing permit Date: March 28, 2008 Client: Richburg Josephine | Permit status: Completed | Permit id: 141006 | |||||
Plumbing permit Date: January 29, 2013 Client: Gomez Rafael | Permit status: Completed | Permit id: 450327 | |||||
Alteration permit Date: December 9, 2011 Client: Gomez Rafael | Permit status: Completed | Permit id: 377973 | |||||
Use permit Date: August 1, 2007 Client: Gomez Rafael | Permit status: Completed | Permit id: 33959 | |||||
1st fl.-legalization of prep and serv of hot and cold foods for take-out as part of an existing retail grocery store in the same bldg. With 2 existing dwelling units Date: August 1, 2007 Client: Gomez Rafael | Permit type: Use permit | Permit status: Completed | Completion date: August 1, 2007 | Permit id: 33959 | |||||
SCORE 100 Install new clean out tee for private sewer Date: January 18, 2013 Contractor: Mr Ds Plumbing And Heating Client: Gomez Rafael | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 9, 2014 | Permit id: 448966 | |||||
Stucco front and side walls of building. Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work. Date: December 9, 2011 Client: Gomez Rafael | Permit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 377973 | |||||
SCORE 100 Repair lateral Date: January 29, 2013 Contractor: Mr Ds Plumbing And Heating Client: Gomez Rafael | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 9, 2014 | Permit id: 450327 | |||||
SCORE 89 Roof replacement, built-up (sfd) Date: November 5, 2007 Contractor: Alert Inc Client: Richburg Josephine | Permit type: Alteration permit | Permit status: Completed | Completion date: November 21, 2008 | Permit id: 113473 | |||||
SCORE 100 Replace bathroom waste & water lines, replace toilet & basin Date: March 28, 2008 Contractor: Stevenson John Inc Client: Richburg Josephine | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2008 | Permit id: 141006 | |||||
SCORE 100 Upgrade 1 amp panel to 32 circuit panel. Install gfi in kitchen. Install laundry outlet. Date: August 7, 2008 Contractor: Percell Blige Elec Contrac Inc Client: Richburg Josephine | Permit type: Electrical permit | Permit status: Completed | Completion date: September 30, 2008 | Permit id: 169390 |