Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Bldg #340472 Permit type: Electrical permit | Permit status: Finaled | Completion date: November 21, 2005 | Current use: Single family dwelling | Permit id: 372884 | |||||
Building residential Permit status: Finaled | Completion date: November 21, 2005 | Current use: Single family dwelling | Permit id: 340472 | |||||
Mechanical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 382897 | |||||
Pre-construction meeting required contact mc. Dps inspector chris smith @ 301-370-3691 open cut roadway and splice service to new house @ 24333 peach tree road. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Notify mc. Dps inspector when work is complete utility representative: steve small @ 301-694-4461 allegheny #933863 rustic/rural road, no tree removal without mc. Dps approval. Tree pruning to be minimized if necessary. Pavement surface restoration shall match existing surface material as close as possible. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 233879 | |||||
Dw permit: "construct two (2) driveways as directed" construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 03 remove existing trees and cut back side slopes for proper site distance as dircted by the inspector. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 228951 |