Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Build and maintain groundwater monitoring well. Permit status: Closed-issued | Completion date: June 13, 2016 | Permit id: Encr-1999-0006 | |||||
Place a temporary portable sign 15 feet back from the property lines per plans. Temporary sign permit good from 12-5-12 to 3-8-13. Permit status: Closed-finaled | Completion date: January 24, 2014 | Permit id: P-Sgn-2012-0977 | |||||
1) 40" x 120" wall (east) per drawing 2) two 22" x 106" wall (east and north) per drawing 3) two 15" x 106" wall (east and south) per drawing 4) sq ft ext message board remains Permit status: Closed-admin | Permit id: B06-21391 | |||||
Display portable sign from 11-1-16 to 02-01-17 per plans. Permit status: Issued | Permit id: P-Sgn-2016-0954 | |||||
Place a portable sign 15 feet back from the property line per plans. Temporary sign permit good for three day periods from 9-27-11 to 12-27-11. Permit status: Closed-finaled | Permit id: P-Sgn-2011-0774 | |||||
Place one portable sign 15 feet back from all property lines per plans Permit status: Closed-finaled | Completion date: August 14, 2015 | Permit id: P-Sgn-2014-0406 | |||||
Groundwater monitoring well to be built and maintain Permit status: Closed-issued | Completion date: June 10, 2016 | Permit id: Encr-1999-0005 | |||||
Remodel kitchen floor for relocated bathroom Permit status: Not approved | Permit id: Bc-Int-2011-002 | |||||
Removal of existing billboard sign faces (#5225, #5226) and structure. Contains two poster-sized faces. One point per sign face, for total of two points, to be applied to upgrade of 516 monroe nw (l-plan-2013-0091). Permit status: Closed-no resonse | Completion date: March 21, 2014 | Permit id: Bc-Reno-2013-15 |