Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temporary occupancy of public right-of-way: traffic lane. Lane to be closed on the 30th and 31st of aug, the 2nd and 6th of sept. Permit status: Issued | Permit id: Top-2016-0369 | |||||
A metal sign to be built on a masonry foundation. The drawing of the sign to be attached. No lighting, just site identification Permit status: Issued | Permit id: P-Sgn-2017-0012 | |||||
Gutter, approach and city sidewalk Permit status: Closed-repaired | Completion date: November 17, 2016 | Permit id: Sw-Per-2016-008 | |||||
New storage shed Permit status: Closed-finaled | Completion date: June 27, 2014 | Permit id: Bc-New-2014-046 | |||||
Add three antenna sleds on the rooftop with equipment cabinet and gound mounted emergency power generator Permit status: Closed-no response | Completion date: September 26, 2016 | Permit id: Bc-New-2016-020 | |||||
Breton village green has 162 senior apartments in one building. The community and common areas will be renovated with updated finishes, site work includes the resurfacing parking lots and replacing site lighting. Exterior building work includes the replacement of roofs, gutters, and downspouts. Interior building work includes the replacement of kitchens, flooring, doors and appliances. Additional insulation will be added to attic spaces. There is structural work planned for the common areas, see plans. Drywall will be repaired and repainted. Plumbing, hvac, and electrical devices will be updated. Residents will be relocated during the days for work to take place. Permit status: Waiting for u and o | Permit id: Bc-Reno-2015-00 | |||||
Sidewalk replace Permit status: Closed-approved | Completion date: September 26, 2017 | Permit id: Sw-Per-2017-005 |