Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 579938 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 287505 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 242490 | |||||
Electrical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 349482 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 567102 | |||||
Administrative permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 583523 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 466435 | |||||
Operations permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 1967 | |||||
Electrical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 586381 | |||||
Mechanical permit ![]() Client: St George Methodist Church | Permit status: Expired | Permit id: 579848 | |||||
Mechanical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 177502 | |||||
Administrative permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 583523 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 575270 | |||||
Electrical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 349482 | |||||
Plumbing permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 579938 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 466435 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 280459 | |||||
Operations permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 1967 | |||||
Electrical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 586381 | |||||
Alteration permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 242490 | |||||
Mechanical permit ![]() Client: St George Methodist Church | Permit status: Completed | Permit id: 177502 | |||||
Mechanical permit ![]() Client: St George Methodist Church | Permit status: Expired | Permit id: 579848 | |||||
SCORE 100 Install line to basement with 4- 20amp lines. Install brass cover floor receptacles, install ceiling light with dimmer and two wireless controls. Move receptacle and install brass cover floor recept. Install 200amp line... In accordance with 2008 nec ![]() ![]() Client: St George Methodist Church | Permit type: Electrical permit | Permit status: Completed | Completion date: January 29, 2013 | Permit id: 371616 | |||||
SCORE 100 Replace and relocate 2 amp service, 40- position panel (within 5 of original)... In accordance with 2008 nec ![]() ![]() Client: St George Methodist Church | Permit type: Electrical permit | Permit status: Completed | Completion date: August 2, 2011 | Permit id: 349482 | |||||
Alterations to church, brick work ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: September 3, 2010 | Permit id: 295058 | |||||
Shore up stone above door and remove damaged steel lentil. Remove stone from each side of door to accomodate new lentil. Purchase & install new steel header. Reset stone around lentil and replaster as necessary. Grind out cracks on outside wall caps & seal. Remove plaster from behind wall and repoint stone. Seal section where stone meets concrete. Carefully remove door & frame and reinstall door & frame, epoxy repair to the base of the jambs. ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: November 12, 2010 | Permit id: 287505 | |||||
Remove 4ft down from top of chimney grind out remaining joints and clean rebuild chimney to org. Size repoint in a 6,1,1, to match org. Clean and seal brick remove damaged brick below chimney and repoint and replace damaged brick. ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: December 20, 2010 | Permit id: 280459 | |||||
Restoration of seven windows, fix glazing, weights, sashes, cracked glass, repaint wood, retain all existing windows as per historical stamp on contract. ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: November 29, 2013 | Permit id: 466435 | |||||
SCORE 100 Remove and replace (shingle) roof covering. Work to comply with and materials approved by philadelphia historical commission. ![]() ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: December 20, 2010 | Permit id: 242490 | |||||
SCORE 100 4 11 08 - tent erected on site ![]() ![]() Client: St George Methodist Church | Permit type: Operations permit | Permit status: Completed | Permit id: 1967 | |||||
SCORE 100 For level ii interior alterations in an existing church. Work to include new interior non-bearing walls, door assemblies, and exterior window and door installations. Separate permits required for mechanical, electrical, and plumbing systems. All work to be done in accordance with plans approved by philadelphia historic commission (10. 09. 14). ![]() ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: August 11, 2015 | Permit id: 567102 | |||||
SCORE 100 Pointing, brick replacement and masonry cleaning of south facade, painting of wood work. Pointing mix, lime works, cleaning (water pressure not to exceed 5 psi), no sealant as per details shown on the plan and approved by philadelphia historical commission. Historical staff to evaluate bricks for replacement and retention of master sample and cleaning and cut out sample in field for approval. ![]() ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 815553 | |||||
Rear shed 8 ft x 4 ft used for gardening tools for an exiting church. As approved by historic commission.(to be erected by eagle scout troop) ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: October 4, 2017 | Permit id: 789091 | |||||
SCORE 100 Replace 15- existing light fixtures in basement storage area, 9- single poles and 10- receptacles.... In accordance with 2008 nec ![]() ![]() Client: St George Methodist Church | Permit type: Electrical permit | Permit status: Completed | Completion date: June 12, 2015 | Permit id: 586381 | |||||
SCORE 78 Amend roof truss stabilization permit (#575270) to document the approved special inspectors contracted to perform the special inspections required per the original permit. Visual inspection of the welds performed on site by ken temme of integrity test labs, llc. ![]() ![]() Client: St George Methodist Church | Permit type: Administrative permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 583523 | |||||
SCORE 100 Repiping existing water and waste lines to toilet and sink and install new toilet and sink (house of worship) ![]() ![]() Client: St George Methodist Church | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 11, 2015 | Permit id: 579938 | |||||
SCORE 100 Will intstall mitsubidshi outdoor heat pump unit with indoor wall mounted evaporate unit & refrigeant lines. Condensigh unit to be located on south side on ground,petr attached photograph. ![]() ![]() Client: St George Methodist Church | Permit type: Mechanical permit | Permit status: Expired | Completion date: June 4, 2015 | Permit id: 579848 | |||||
SCORE 78 Replace 7 total roof trusses as stabilization of church roof as per engineers report. Special inspections required including special inspections for shop-fabricated structural members. Installation of shop-fabricated structural members shall not be permitted until an amended permit is issued to document approval of the special inspections of the fabrrication process in accordance with ibc section 1704. 2. ![]() ![]() Client: St George Methodist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: April 14, 2015 | Permit id: 575270 | |||||
SCORE 65 Remove replace cast iron steam boiler for church ![]() ![]() Client: St George Methodist Church | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 17, 2008 | Permit id: 177502 |