Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior demolition: category 1/interior work 9 sq ft - interior demolition. Removal of non structural partition walls and debris. Remove all non load bearing walls as per code. Demolition work only. Permit id: Com2015-04521 | |||||
Emergency front wall repairs. Permit id: Com2007-27750 | |||||
(this is a condemned propety: days to start the work and days to complete the work. Otherwise this permit will be voided.) application for authorization to raze building by dismantling including barricades shoring propping clearing of premises and rebuilding or refinishing adjoining building wall as directed by building inspector. All debris removed from site must be deposited at an approved landfill area. Epa regulations must be met and rat-proofed per code. Building last used for single family dwelling. Expiration date: August 31, 2016 | Permit id: Dem2016-00156 | |||||
Interior demolition: category 1 interior work 9 sq ft - interior demolition. Removal of non structural partition walls and debris. Remove all non load bearing walls as per code. Demolition work only. Expiration date: May 30, 2015 | Permit id: Com2015-04521 |