Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Exterior work - remove formstone. Re-point/ repair brick facade as needed. Separate permit required from dgs. All work done as per code. Permit id: Com2014-11859 | |||||
Interior work (8 sq ft) - non-structural alterations - category i - remove partition walls plaster and interior finishes - 1st and 2nd flr as per code. Separate permit required for tenant fitout Permit id: Com2013-02673 | |||||
New windows and doors repair to internal walls and ceiling. Upgrade appliance a kitcehn bathroom renovation. Permit id: Com2004-22611 | |||||
(use) continue to use 1st floor of premises as a grocery store Permit id: Com2002-01197 | |||||
Renovation of building (first floor will be comercial/retail. Second floor will be an efficency residential dwelling) as per plans as per code. Separate permit required for sprinkler system and fire alarm. Expiration date: February 12, 2017 | Permit id: Com2016-00766 | |||||
Upgrade existing 2 amp service with 2 -1 amp panels to 3 amp service with 2- 1 amp panels. Also install wiring for 2nd floor apt. As per code. Expiration date: December 1, 2016 | Permit id: Com2016-14129 | |||||
(work only)wire 1st floor barber shop according to nec code. As per code. Expiration date: January 28, 2017 | Permit id: Com2016-19459 | |||||
1st floor; install 1- 92% gas fired furnace with 2 ton a/c supply and return duct. 2nd floor; install 1- 92% gas fired furnace with 2- ton a/c supply and return duct1st floor; install 1- 1/2 bath and 1- hand sink connecting to existing sanitary. 2nd floor; install 1 full bath 1 laundry 1 kitchen. Gas to furnace. Work done to code. Expiration date: October 5, 2016 | Permit id: Com2016-08472 | |||||
Reinstatement(original permit:com2016-08472:1st floor; install 1- 92% gas fired furnace with 2 ton a/c supply and return duct. 2nd floor; install 1- 92% gas fired furnace with 2- ton a/c supply and return duct1st floor; install 1- 1/2 bath and 1- hand sink connecting to existing sanitary. 2nd floor; install 1 full bath 1 laundry 1 kitchen. Gas to furnace. Work done to code. ) Expiration date: December 29, 2016 | Permit id: Com2016-30269 | |||||
Use 1st floor as a barber shop 2nd floor as 1 dwelling unit Permit id: Use2016-05454 | |||||
Reinstatement(original permit:com2016-08472:1st floor; install 1- 92% gas fired furnace with 2 ton a c supply and return duct. 2nd floor; install 1- 92% gas fired furnace with 2- ton a c supply and return duct1st floor; install 1- 1 2 bath and 1- hand sink connecting to existing sanitary. 2nd floor; install 1 full bath 1 laundry 1 kitchen. Gas to furnace. Work done to code. ) Expiration date: December 29, 2016 | Permit id: Com2016-30269 | |||||
Renovation of building (first floor will be comercial retail. Second floor will be an efficency residential dwelling) as per plans as per code. Separate permit required for sprinkler system and fire alarm. Expiration date: February 12, 2017 | Permit id: Com2016-00766 | |||||
1st floor; install 1- 92% gas fired furnace with 2 ton a c supply and return duct. 2nd floor; install 1- 92% gas fired furnace with 2- ton a c supply and return duct1st floor; install 1- 1 2 bath and 1- hand sink connecting to existing sanitary. 2nd floor; install 1 full bath 1 laundry 1 kitchen. Gas to furnace. Work done to code. Expiration date: October 5, 2016 | Permit id: Com2016-08472 | |||||
Exterior work - remove formstone. Re-point repair brick facade as needed. Separate permit required from dgs. All work done as per code. Expiration date: December 6, 2014 | Permit id: Com2014-11859 |