Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F14/ 10th floor lifewise 609 sq ft remodel, new door, card reader, counter and interior windows Permit type: Reviews | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-237580-000 | |||||
10th fl lifewise ti - power Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-240063-000 | |||||
10th fl lifewise ti - voice/data/strobes Permit type: Intake | Permit status: Closed | Completion date: November 21, 2014 | Permit id: 2014-241105-000 | |||||
B1/ 10th floor suite 10 lifewise tenant relocate diffusers Permit type: Intake | Permit status: Closed | Completion date: January 6, 2015 | Permit id: 2015-101491-000 | |||||
Add (3) card readers to 10th floor and (1) card reader on 1st floor pdx-12895 Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-121107-000 | |||||
F16/ renovation, b1(bike parking reconfiguration) floors 2,3,7,8,9; new walls for conference room with folding partitions for 3 separate spaces, remodel restrooms, breakroom, flooring, ceiling, elec, plbg, Permit type: Reviews | Permit status: Approved | Completion date: February 18, 2015 | Permit id: 2015-121174-000 | |||||
F16/ ch2m hill renovation, b1(bike parking reconfiguration) floors 2,3,7,8,9; new walls for conference room with folding partitions for 3 separate spaces, remodel restrooms, breakroom, flooring, ceiling, elec, plbg, Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-121187-000 | |||||
F15/ revision to basement, add bike parking, restripe parking, 2nd &3rd flr reconfigure for new conference spaces, two movable partitions on 3rd flr, refinish restrooms, 7th and 8th flr, refinish restrooms, finishes, ceiling, elec, plbg Permit type: Intake | Permit status: Closed | Completion date: April 9, 2015 | Permit id: 2015-121187-Rev | |||||
B1/ rev 02 - additional bracing as required per field discovery of existing conditions Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-121187-Rev | |||||
Plumbing renovation at ch2m hill floors 2,3,7,8,9r and r fixtures in restrooms and breakrooms Permit type: Intake | Permit status: Closed | Completion date: February 27, 2015 | Permit id: 2015-125992-000 | |||||
B1,2,3,7,8,9 flrs restrooms break rms - power Permit type: Intake | Permit status: Closed | Completion date: March 15, 2015 | Permit id: 2015-133922-000 | |||||
B1/ ch2m hill renovation - 3rd floor remove and replace ductwork & grilles, add 3 vav units, replace 2 existing bathroom fans Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177672-000 | |||||
Sprinkler - add and relocate sprinklers to accommodate new walls and ceilings Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179942-000 | |||||
B1,2,3,7,8,9 flrs restrooms break rms - fire alarm wiring Permit type: Intake | Permit status: Closed | Completion date: June 8, 2015 | Permit id: 2015-182058-000 | |||||
B1,2,3,7,8,9 flrs restrooms break rms - voice/data/audio/video for 2nd & 3rd floor conference rooms Permit type: Intake | Permit status: Closed | Completion date: June 10, 2015 | Permit id: 2015-183713-000 | |||||
B1,2,3,7,8,9 flrs restrooms break rms - hvac controls for 2nd & 3rd floor Permit type: Intake | Permit status: Closed | Completion date: June 10, 2015 | Permit id: 2015-184045-000 | |||||
Add and relocate existing notification devices for 2nd and 3rd floor ti. Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-190344-000 | |||||
Limited energy - (2)circuits, fire, tele/data Permit type: Electrical inspections | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2013-133474-000 | |||||
Wo3869 pm2 ch2m hill - 6th floorinstallation of hdmi vga cables in newport conference roomdave garrett 503-964-1447 Permit type: Electrical inspections | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2013-136446-000 | |||||
Duct modifications Permit type: Final permit | Permit status: Approved | Completion date: January 21, 2015 | Permit id: 2013-192048-000 | |||||
Remove/relocate existing radio equipment within existing mechanical room Permit type: Application | Permit status: Approved | Completion date: November 26, 2013 | Permit id: 2013-232170-000 | |||||
Removal of existing canopy on west side of building and replacement with new smaller, canopy; remove portion of glazing and paneling systems above canopy and replace with new curtain wall system; new atrium in lobby area; new seating area on west side of building Permit type: Application | Permit status: Approved | Completion date: January 7, 2014 | Permit id: 2014-100719-000 | |||||
Dfs for new aluminum/glass entry Permit type: Application | Permit status: Approved | Completion date: April 1, 2014 | Permit id: 2014-100719-Dfs | |||||
Dfs for metal framed skylight Permit type: Application | Permit status: Approved | Completion date: May 20, 2014 | Permit id: 2014-100719-Dfs | |||||
Wire for lobby remodel - parkside Permit type: Electrical inspections | Permit status: Approved | Completion date: August 14, 2014 | Permit id: 2014-117573-000 | |||||
Ti for existing tenant; construct two new restrooms and new locker room Permit type: Application | Permit status: Approved | Completion date: May 16, 2014 | Permit id: 2014-157891-000 | |||||
Underground - install new vault and double check (repair to existing underground line) Permit type: Intake | Permit status: Approved | Completion date: May 30, 2014 | Permit id: 2014-163132-000 | |||||
(1) thermostat Permit type: Electrical inspections | Permit status: Approved | Completion date: October 3, 2014 | Permit id: 2014-205225-000 | |||||
Construct demising wall, add non structural partition wall to split file room into two new offices, one new door Permit type: Application | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-209737-000 | |||||
Acumentra ti-(2) circuits Permit type: Electrical inspections | Permit status: Approved | Completion date: September 25, 2014 | Permit id: 2014-211072-000 | |||||
Parkside shower ti basement area-(1) 100amp feeder, (6) circuits Permit type: Electrical inspections | Permit status: Approved | Completion date: September 30, 2014 | Permit id: 2014-211455-000 | |||||
Fire alarm Permit type: Intake | Permit status: Closed | Completion date: September 15, 2014 | Permit id: 2014-212548-000 | |||||
Fixtures for 2 new bathrooms Permit type: Intake | Permit status: Closed | Completion date: September 18, 2014 | Permit id: 2014-214566-000 | |||||
Alarm - 3 notification devices for new restrooms and locker room Permit type: Intake | Permit status: Approved | Completion date: September 18, 2014 | Permit id: 2014-214730-000 | |||||
Add 4 landscape screens/support steel to exterior west side of building, 2 footings per screen Permit type: Application | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-216751-000 | |||||
Add 4 landscape screens/support steel to exterior west side of building, 2 footings per screen Permit type: Transportation | Permit status: Closed | Completion date: September 23, 2014 | Permit id: 2014-216751-000 | |||||
Add 4 landscape screens/support steel to exterior west side of building, 2 footings per screen Permit type: Transportation | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-216751-000 | |||||
Shower/locker exhaust fans and split 1. 5 ton hp in garage, ducting, in level below parking garage, not more than below grade Permit type: Intake | Permit status: Closed | Completion date: September 25, 2014 | Permit id: 2014-217543-000 | |||||
Low voltage - installing phone and data wire Permit type: Electrical inspections | Permit status: Approved | Completion date: September 30, 2014 | Permit id: 2014-217993-000 | |||||
Sprinkler - add (2), relocate (2) sprinklers to accommodate new walls & ceilings for shower & locker room ti Permit type: Intake | Permit status: Approved | Completion date: September 29, 2014 | Permit id: 2014-218831-000 | |||||
Addition of four landscape screen walls (green screens) at an existing landscaped area on the west facade. Permit type: Land use review | Permit status: Completed | Completion date: October 2, 2014 | Permit id: 2014-219545-000 | |||||
Addition of four landscape screen walls (green screens) at an existing landscaped area on the west facade. Permit type: Land use review | Permit status: Closed | Completion date: October 24, 2014 | Permit id: 2014-219545-000 | |||||
Addition of four landscape screen walls (green screens) at an existing landscaped area on the west facade. Permit type: Land use review | Permit status: Cancelled | Completion date: October 24, 2014 | Permit id: 2014-219545-000 | |||||
Reviews Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2014-227032-000 | |||||
Building currently has a hybrid of two cross connected fire alarm systems. This project will bring the rest of the building on to the newer panel so that there will be only one panel---2 sets of plans Permit type: Intake | Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227036-000 | |||||
F21/ 4th & 5th floor, remove partitions, open up space, remodel restrooms, new double entry doors and windows to terrace, new guard rail system at terrace parapet wall, ceiling, patch and paint, elec, plgb Permit type: Reviews | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-243632-000 | |||||
F21/ 4th floor, remove partitions, open up space, remodel restrooms, demo ceiling, patch and paint, elec, plgb Permit type: Intake | Permit status: Closed | Completion date: September 29, 2015 | Permit id: 2015-243711-000 | |||||
Ch2m center, 4th floor t. I. Demo: 6-wc, 2- ur, 5- lav, 1- df. New: 5- wc, 2-ur, 4- lav, 2- fd. Permit type: Intake | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2015-253446-000 | |||||
4th fl demo & prep - power Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-256702-000 | |||||
Approval of two new fascia signs to replace existing fascia signs of similar type, size and position: sign a. West elevation canopy wall - approximately 12 above ground level and approximately 5. 5 square feet (9h x 7-2 l); non-illuminated aluminum reverse pan channel letters (2 deep). Sign b. South elevation parapet wall - approximately 129 above ground level and approximately 57 square feet (3-1 h x 14-7 l); face lit led channel letters (5 deep), per the approved site plans, exhibits c-1 through c-4, signed and dated december 22, 2015, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-263849 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: November 13, 2015 | Permit id: 2015-263849-000 | |||||
Parkside center t. I., 2 new dishwashers (2nd and 3rd floors) Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-264648-000 | |||||
Approval of alterations to levels four and five of an existing 10-story building in the south auditorium plan district, per the approved site plans, exhibits c-1 through c-15, signed and dated february 18, 2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 15. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-268228 dz. No field changes allowed. Permit type: Land use review | Permit status: Completed | Completion date: November 30, 2015 | Permit id: 2015-268228-000 | |||||
Install (1) non-illuminated wall sign, 5. 5 sq ft, sign a. Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107190-000 | |||||
Install (1) illuminated wall sign, 57. 71 sq ft, sign b Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107195-000 | |||||
Install (1) sign circuit Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107199-000 | |||||
F23/k12 management 5th fl t. I. - demo of walls, doors and relites, install new partitions, doors to create breakroom, coffee station, it room, storage room, conference rooms, private and open offices, relites, exterior window replacement (like for like),casework, finishes, plbg, elec Permit type: Reviews | Permit status: Approved | Completion date: March 1, 2016 | Permit id: 2016-128381-000 | |||||
Sprinkler - 4th floor ti - provide upright protection where ceiling is being removed - add 197 upright sprinklers Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-129852-000 | |||||
5th floor k12 management - power Permit type: Intake | Permit status: Closed | Completion date: March 8, 2016 | Permit id: 2016-132251-000 | |||||
F17/ 4th and 5th floor deck renovation; new pavers, new doors, new railings, benches, new pergola, replace damaged windows in existing locations, paint building, Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139421-000 | |||||
F17/ 4th and 5th floor deck renovation; new pavers, new doors, new railings, benches, new pergola, replace damaged windows in existing locations, paint building, Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139429-000 | |||||
Plumbing renovation at ch2m center suite 5 for k12 management tidemo 2-wh, 1-sink; new 2-sinks, 1-fixture? 1-wh? Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140324-000 | |||||
Relocate existing amp transformer Permit type: Intake | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2016-145819-000 | |||||
4th & 5th fl decks - power Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-151912-000 | |||||
Install of a cctv systemfaxed Permit type: Intake | Permit status: Closed | Completion date: April 2, 2014 | Permit id: 2014-134396-000 | |||||
F20/ revise some wall layout, basement bike parking, etc Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-121187-Rev | |||||
Replace 3 existing antennas ( 1per sector) remove 2 equipment cabinets to new room Permit type: Application | Permit status: Approved | Completion date: July 17, 2015 | Permit id: 2015-203117-000 | |||||
F21 4th & 5th floor, remove partitions, open up space, remodel restrooms, new double entry doors and windows to terrace, new guard rail system at terrace parapet wall, ceiling, patch and paint, elec, plgb Permit type: Reviews | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-243632-000 | |||||
F21 4th floor, remove partitions, open up space, remodel restrooms, demo ceiling, patch and paint, elec, plgb Permit type: Intake | Permit status: Closed | Completion date: September 29, 2015 | Permit id: 2015-243711-000 | |||||
Parkside center t. I., 2 new dishwashers (2nd and 3rd floors) Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-264648-000 | |||||
F23 k12 management 5th fl t. I. - demo of walls, doors and relites, install new partitions, doors to create breakroom, coffee station, it room, storage room, conference rooms, private and open offices, relites, exterior window replacement (like for like),casework, finishes, plbg, elec Permit type: Reviews | Permit status: Approved | Completion date: March 1, 2016 | Permit id: 2016-128381-000 | |||||
F17 4th and 5th floor deck renovation; new pavers, new doors, new railings, benches, new pergola, replace damaged windows in existing locations, paint building, Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139421-000 | |||||
F17 4th and 5th floor deck renovation; new pavers, new doors, new railings, benches, new pergola, replace damaged windows in existing locations, paint building, Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139429-000 | |||||
Plumbing renovation at ch2m center suite 5 for k12 management tidemo 2-wh, 1-sink; new 2-sinks, 1-fixture? 1-wh? Permit type: Intake | Permit status: Closed | Completion date: March 24, 2016 | Permit id: 2016-140324-000 | |||||
4th & 5th fl decks - power Permit type: Intake | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2016-151912-000 | |||||
F16 ch2m hill renovation, b1(bike parking reconfiguration) floors 2,3,7,8,9; new walls for conference room with folding partitions for 3 separate spaces, remodel restrooms, breakroom, flooring, ceiling, elec, plbg, Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-121187-000 | |||||
B1 rev 02 - additional bracing as required per field discovery of existing conditions Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-121187-Rev | |||||
F20 revise some wall layout, basement bike parking, etc Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-121187-Rev | |||||
B1 ch2m hill renovation - 3rd floor remove and replace ductwork & grilles, add 3 vav units, replace 2 existing bathroom fans Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177672-000 | |||||
B1,2,3,7,8,9 flrs restrooms break rms - voice data audio video for 2nd & 3rd floor conference rooms Permit type: Intake | Permit status: Closed | Completion date: June 10, 2015 | Permit id: 2015-183713-000 | |||||
Ti in existing leasehold on first floor, convert offices to classrooms for art college Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: August 31, 2000 | Current use: Business | Permit id: 2000-160398-000 | |||||
Ti - alter office partitions on 8th floor Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 11, 2002 | Current use: Business | Permit id: 2000-195998-000 | |||||
Minor ti. Remove and add walls to existing office space in nw corner of 1st floor. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 15, 2001 | Current use: Business | Permit id: 2001-130421-000 | |||||
Ti: 1st floor alteration of office space Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 3, 2001 | Current use: Business | Permit id: 2001-141069-000 | |||||
Relocate partition walls for office space Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: August 9, 2001 | Current use: Business | Permit id: 2001-145678-000 | |||||
Ti- nw pine - suite 900- remodel (e) office space Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 27, 2002 | Current use: Business | Permit id: 2002-109990-000 | |||||
Ti- interior non-structural demo of interior walls - no occupancy Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 4, 2003 | Current use: Business | Permit id: 2003-107177-000 | |||||
Ti-suite 150- remodel for pdc housing-partition walls, elec; plbg maintain sprinklers and 1 % smoke detection all areas. Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 21, 2003 | Current use: Business | Permit id: 2003-116796-000 | |||||
Ti for existing tenant, suite 150 Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 20, 2004 | Current use: Business | Permit id: 2004-006317-000 | |||||
Ti- stewart title continuing space renovation -same occupant - subsequent mechanical review Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 14, 2005 | Current use: Business | Permit id: 2004-067586-000 | |||||
Create single tnenat floor on 10th floor Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 4, 2005 | Current use: Business | Permit id: 2004-064705-000 | |||||
Ti - to upgrade first floor lobby restrooms, including new energy efficicient fixtures, no change to size, fixture count, or location Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 20, 2013 | Current use: Business | Permit id: 2013-120101-000 | |||||
Ti - to reconfigure existing office space on nw side of first floor, remove existing ceiling tile (10% of tenancy), grid to remain, and add lighting fixtures, remodel 30% of tenancy Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 3, 2013 | Current use: Business | Permit id: 2013-120136-000 | |||||
Legalize unpermitted 2008 antenna installation - installation done at that time did not meet code requirements and must be corrected before adding and swapping equipment that is part of this permit; install 2 new antennas and related electronic equipment to rooftop facility; no increase in height and existing sled mounts will be used; painted to match the existing; one hybrid cable per sector to be placed with the existing coax.- see comments Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 18, 2013 | Current use: Utility | Permit id: 2012-177594-000 | |||||
Remove (5) existing radios from cabinet, add (1) new radio to cabinet, remove(3) radios from antenna area, relocate (1) radio from antenna area to existing cabinet, install (3) new radios to antenna area, replace (3) existing tmas with (3) new tmas Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: December 21, 2016 | Current use: Utility | Permit id: 2016-187955-000 |